ICR Summary Information
Hours per Response 34
Number of Respondents 130.00
Total Estimated Burden Hours 8,900
Total Estimated Costs $1,340,000
Annualized Capital O&M $16,900
Total Annual Responses 260
Form Number Not Applicable

Sheet 2: Table 1

Table 1: Annual Respondent Burden and Cost – NSPS for VOC Emissions from Petroleum Refinery Wastewater Systems (40 CFR Part 60, Subpart QQQ (Renewal)














Burden item (A)
Person- hours per occurrence
(B)
No. of occurrences per respondent per year
(C)
Person- hours per respondent per year (C=AxB)
(D) Respondents
per year (a)
(E) Technical person- hours per year (E=CxD) (F) Management person-hours per year (Ex0.05) (G)
Clerical person-hours per year (Ex0.1)
(H)
Cost (b)



1. Applications N/A






Labor Rates
2. Survey and Studies N/A






Management $157.61
3. Reporting requirements







Technical $123.94
A. Familiarize with regulatory requirements c 2 1 2 130 260 13 26 $44,213.99
Clerical $62.52
B. Required activities










Inspect drain systems d 2 12 24 130 3,120 156 312 $530,567.86


Inspect oil-water separators e 8 2 16 130 2,080 104 208 $353,711.90


Performance test f 330 1 330 0 0 0 0 $0


C. Create information See 3B









D. Gather existing information See 3E









E. Write report










Notification of construction/reconstruction f 2 1 2 0 0 0 0 $0


Notification of modification f 2 1 2 0 0 0 0 $0


Notification of actual startup f 2 1 2 0 0 0 0 $0


Initial certification of equipment and inspections f 2 1 2 0 0 0 0 $0


Initial inspection report detailing emission problems f 2 1 2 0 0 0 0 $0


Notification of initial performance test f 2 1 2 0 0 0 0 $0


Various notifications of intent f 2 1 2 0 0 0 0 $0


Demonstration for alternative operational or process parameter f 2 1 2 0 0 0 0 $0


Notification of delay in compliance f 2 1 2 0 0 0 0 $0


Semiannual report g 8 2 16 130 2,080 104 208 $353,711.90


Results of performance test See 3B









Subtotal for Reporting Requirements



8,671 $1,282,206


4. Recordkeeping requirements










A. Familiarize with regulatory requirements See 3A









B. Plan activities N/A








C. Implement activities N/A








D. Develop record system N/A








E. Enter information 1.5 1 1.5 130 195 10 20 $33,160.49


F. Train personnel N/A









G. Audits N/A









Subtotal for Recordkeeping Requirements



224 $33,160


TOTAL LABOR BURDEN AND COSTS (rounded) h



8,900 $1,320,000


TOTAL CAPITAL AND O&M COSTS (rounded) h






$16,900
34 hr/response
GRAND TOTAL (rounded) h






$1,340,000














Assumptions:










a We have assumed that the average number of respondents that will be subject to the rule will be 130. There will be no additional new sources per year that will become subject to the rule over the three-year period of this ICR.


b This ICR uses the following labor rates: Managerial $157.61 ($75.05 + 110%); Technical $123.94 ($59.02 + 110%); and Clerical $62.52 ($29.77 + 110%). These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2021, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees.


c We have assumed that each respondent will read instructions one time per year.


d We have assumed that each respondent will take two hours to inspect drain systems twelve times per year.


e We have assumed that it will take eight hours for each respondent to inspect oil-water separators two times per year.


f This activity applies only to new or modified sources.


g We have assumed that each respondent will take eight hours to write the semiannual report two times per year.


h Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.



Sheet 3: Table 2

Table 2: Average Annual EPA Burden and Cost – NSPS for VOC Emissions from Petroleum Refinery Wastewater Systems (40 CFR Part 60, Subpart QQQ (Renewal)














Activity (A)
EPA Person- hours per occurrence
(B)
No. of occurrences per plant per year
(C)
EPA person- hours per respondent per year (C=AxB)
(D)
Plants per year (a)
(E)
Technical person- hours per year (E=CxD)
(F)
Management person-hours per year (Ex0.05)
(G)
Clerical person-hours per year (Ex0.1)
(H)
Cost (b)



1. Report Review








Labor Rates
Notification of construction/reconstruction 2 1 2 0 0 0 0 $0
Management $70.56
Notification of modification 2 1 2 0 0 0 0 $0
Technical $52.37
Notification of actual startup 2 1 2 0 0 0 0 $0
Clerical $28.34
Initial certification for equipment and inspections 2 1 2 0 0 0 0 $0


Initial inspection detailing emission problems 2 1 2 0 0 0 0 $0


Notification of various intent c 2 1 2 0 0 0 0 $0


Demonstration for alternative operational or process parameter 2 1 2 0 0 0 0 $0


Notification of delay in compliance 2 1 2 0 0 0 0 $0


Notification of initial performance test 2 1 2 0 0 0 0 $0


Initial performance test report for flares 2 1 2 0 0 0 0 $0


Review of semiannual reports d 8 2 16 130 2,080 104 208 $158,106.00


TOTAL COSTS (rounded)e



2,390 $158,000














Assumptions:










a We have assumed that the average number of respondents that will be subject to the rule will be 130. There will be no additional new sources that will become subject to the rule over the three-year period of this ICR.


b This cost is based on the average hourly labor rate as follows: Managerial $70.56 (GS-13, Step 5, $44.10 + 60%); Technical $52.37 (GS-12, Step 1, $32.73 + 60%); and Clerical $28.34 (GS-6, Step 3, $17.71 + 60%). This ICR assumes that Managerial hours are 5 percent of Technical hours, and Clerical hours are 10 percent of Technical hours. These rates are from the Office of Personnel Management (OPM), 2022 General Schedule, which excludes locality, rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.


c The following notification review is included: election to construct and operate a completely closed drain system; election to construct and operate a floating roof; intent to use an alternative means of emission limitation; and intent to use a VOC control device other than a carbon absorber to meet the requirements of 60.692-5(a).


d We have assumed that it will take 8 hours two times per year to review each semiannual report.


e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.



Sheet 4: Capital O&M

Capital/Startup vs. Operation and Maintenance (O&M) Costs
(A) (B) (C) (D) (E) (F) (G)
Continuous Monitoring Device Capital/Startup Cost for One Respondent Number of New Respondents Total Capital/Startup Cost, (B X C) Annual O&M Costs for One Respondent Number of Respondents with O&M Total O&M,
(E X F)
Portable VOC analyzer for non-regenerative carbon absorber $2,960 0 0 $130 130 $16,900
Total a

$0

$16,900
a Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.






Sheet 5: Responses

Total Annual Responses
(A) (B) (C) (D) (E)
Information Collection Activity Number of Respondents Number of Responses Number of Existing Respondents That Keep Records But Do Not Submit Reports Total Annual Responses
E=(BxC)+D
Notification of construction/
reconstruction
0 1 N/A 0
Notification of modification 0 1 N/A 0
Notification of actual startup 0 1 N/A 0
Initial certification of equipment and inspections 0 1 N/A 0
Initial inspection report detailing emission problems 0 1 N/A 0
Notifications of various intent 0 1 N/A 0
Demonstration for alternative operational or process parameter 0 1 N/A 0
Notification of delay in compliance 0 1 N/A 0
Semiannual report 130 2 N/A 260
Notification of initial performance test 0 1 N/A 0



Total 260

Sheet 6: Respondents

Number of Respondents

Respondents That Submit Reports Respondents That Do Not Submit Any Reports

(A) (B) (C) (D) (E)
Year Number of New Respondents 1 Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents That Are Also New Respondents Number of Respondents
(E=A+B+C-D)
1 0 130 0 0 130
2 0 130 0 0 130
3 0 130 0 0 130
Average 0 130 0 0 130
1 New respondent include sources with constructed, reconstructed and modified affected facilities.




File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy