FERC-516H (OMB Control No. 1902-0303)
Docket No. RM22-2-000
RIN No. 1902-AF91
Supporting Statement for the proposed revision of FERC-516H (Electric Rate Schedules and Tariff Filings) in Docket No. RM22-2-000
The Federal Energy Regulatory Commission (Commission or FERC) requests that the Office of Management and Budget (OMB) review the proposed revisions due to the Final Rule in Docket No. RM22-2-000 which will revise the FERC-516H (OMB Control No. 1902-0303) and provide comments.
The proposed revisions included in Docket No. RM22-2-000 would require respondents to update their pro forma Open Access Transmission Tariffs (OATTs), pro forma Large Generator Interconnection Agreements (LGIAs), and pro forma Small Generator Interconnection Agreements (SGIAs) and would require a compliance filing to be submitted to the Commission. This supplemental statement pertains to the OATTs.
The Federal Power Act (FPA)1 requires respondents that are subject to 18 CFR 35.28 to submit compliance filings. The regulation at 18 CFR 35.28, which pertains to non-discriminatory OATTs, applies to:
Commission-jurisdictional public utilities that own, control, or operate facilities used for the transmission of electric energy in interstate commerce; and
Non-jurisdictional utilities that seek voluntary compliance with jurisdictional transmission tariff reciprocity conditions.
Generally, generating facilities that are interconnected to the transmission system are required to operate within a standard power factor range, which represents the proportion of their output that is reactive power versus real power. Currently, transmission providers may elect to pay their own or affiliated generating facilities for the provision of reactive power within the standard power factor range provided that they also must pay unaffiliated generating facilities. These charges are then included in and increase transmission providers’ transmission rates.
The Commission is eliminating this allowance to prohibit all generating facilities, on a comparable basis, from receiving separate payment for the provision of reactive power within the standard power factor range. As such, the Commission is adding language to Schedule 2 of its pro forma OATT specifying that transmission rates shall not include any charges associated with compensation to a generating facility for the supply of reactive power within the standard power factor range specified in the generating facility’s interconnection agreement. In addition, the Commission is removing from section 9.6.3 of its pro forma LGIA and section 1.8.2 of its pro forma SGIA language that requires transmission providers to pay unaffiliated generating facilities for the supply of reactive power within the standard range if transmission providers pay their own or affiliated generating facilities.
The revisions to the pro forma OATT, pro forma LGIA, and pro forma SGIA are shown in section III.A of the Final Rule. The Commission is making these revisions to ensure that transmission rates are just and reasonable.
The Commission has allowed transmission providers to pay generating facilities in their service territories for reactive power within the standard power factor range to ensure comparable treatment between generating facilities that are owned by or affiliated with the transmission provider and unaffiliated generating facilities in the transmission provider’s service territory or region. However, the provision of reactive power within the standard power factor range results in no or at most a de minimis increase in variable costs beyond the cost of providing real power. In many regions of the country, transmission providers do not pay separately for the provision of reactive power within the standard power factor range, instead allowing generating facilities to recover any costs associated with the requirement to provide reactive power within the standard power factor range through the same means by which generating facilities recover the costs associated with the provision of real power. These regions that do not separately compensate for providing reactive power have not seen any shortfalls in reactive power supply from generating facilities or other reliability issues stemming from the decision not to separately compensate for providing reactive power within the standard power factor range.
Given that it is only by virtue of comparability that generating facilities were previously entitled to reactive power compensation, the Commission is concerned that continuing to allow transmission providers to elect to separately compensate their own or affiliated generating facilities for the provision of reactive power within the standard power factor range, thereby requiring transmission provider to also pay unaffiliated generating facilities, is resulting in unjust and unreasonable rates for transmission customers.
The information collection activities listed below, which will be added to FERC-516H, are all one-time burdens in Year 1. Specifically, the information collection activities are limited to compliance filings from entities with pro forma OATTs, pro forma LGIAs, or pro forma SGIAs on file with the Commission.
The Commission implements its eTariff system for the electronic filing of tariffs. More information on eTariff is posted at https://www.ferc.gov/ferc-online/etariff.
The Commission’s rules and data requirements are periodically reviewed in conjunction with OMB clearance expiration dates. This includes a review of the Commission’s regulations and data requirements to identify duplication. The information to be submitted, generated, retained, or posted, pursuant to the final rule is not available from other sources.
Under the Small Business Administration’s classification,2 the six Regional Transmission Operators and Independent System Operators (RTOs/ISOs) would be considered electric bulk power transmission and control, for which the small business size threshold is 950 or fewer employees. Because each RTO/ISO has more than 950 employees, none are considered small entities. The Commission estimated that 40 transmission providers and three other entities with pro forma OATTs, pro forma LGIAs, and pro forma SGIAs are affected by this final rule and that approximately 14% of those entities are small entities affected by the final rule.
The Commission requires this information to perform its mandated oversight and review responsibilities with respect to electric transmission rates being just and reasonable. Without this information, the Commission would be unable to meet its statutory responsibility under section 206 of the FPA to ensure that electric utility rates and tariffs are not unjust, unreasonable, or unduly discriminatory or preferential. Failing to meet this responsibility could result in public utilities charging rates that are not just and reasonable.
This collection contains no special circumstances.
The Commission issued a Notice of Proposed Rulemaking on March 21, 2024 and it published in the Federal Register on March 28, 2024. The Notice of Proposed Rulemaking sought comments on the proposal generally, and comments specifically on: (1) the impact on reliability; (2) the length and alignment of any potential transition period; (3) the impact on investment; and (4) existing reactive power compensation regimes. These matters fall into two categories: (1) the contention that it is unjust and unreasonable for transmission providers to pay generating facilities for reactive power capability within the standard power factor range as set forth in generating facilities’ interconnection agreements, as well as the implications of such a finding; and (2) implementation details of the change. The comments did not pertain to the information collection requirements.
The Commission makes no payments or gifts to respondents as part of this collection.
The Commission does not consider the information collected in FERC-516H filings to be confidential. However, an entity that chooses to seek confidential treatment of the information may submit a request for the Commission to treat this information as confidential and non-public, consistent with 18 CFR 388.112.
There are no questions of a sensitive nature associated with the reporting requirements.
The Commission estimates that the final rule will affect the burden3 and cost of FERC-516H as follows:
A. Collection |
B. Number of Respondents |
C. Annual Number of Responses per Respondent |
D. Total Number of Responses (Column B x Column C) |
E. Average Burden Hrs. & Cost per Response |
F. Total Annual Hr. Burdens & Total Annual Cost (Column D x Column E) |
G. Cost per Respondent (Column F ÷ Column B) |
Transmission Providers with Open Access Transmission Tariffs (one-time compliance filing) |
40 |
1 |
40 |
4 hrs.; $400 |
160 hrs.; $16,000 |
$400 |
Totals |
|
― |
|
― |
160 hrs.; $16,000 |
There are no non-labor or Paperwork Reduction Act (PRA)-related costs. All costs are related to burden hours and are addressed in Questions #12 and #15.
Table 14
Estimated Annual Federal Costs for FERC-516H
|
Number of Employees (Full-Time Equivalents) |
Estimated Annual Federal Cost |
Analysis and Processing of Filings4 |
3.30 |
$685,693.80 |
PRA5 Administrative Cost |
|
$8,396 |
Total Federal Cost |
|
$694,089.80 |
FERC bases its estimate of the “Analysis and Processing of Filings” cost to the Federal Government on salaries and benefits for professional and clerical support. This estimated cost represents staff analysis, decision-making, and review of any actual filings submitted in response to the information collection.
The “PRA Administrative Cost” is associated with preparing, issuing, and submitting materials necessary to comply with the Paperwork Reduction Act for rulemakings, orders, or any other vehicle used to create, modify, extend, or discontinue an information collection. This average annual cost includes requests for extensions, all associated rulemakings and orders, other changes to the collection, and publication of related notices in the Federal Register.
The Final Rule results in an increase in burden due to the one-time compliance filing that would be required following a final rule.
|
Total Request (Rounded) |
Previously Approved (Rounded) |
Change Due to Adjustment in Estimate |
Change Due to Agency Discretion |
Annual Number of Responses |
329 |
289 |
0 |
+40 |
Annual Time Burden (Hrs.) |
51,024 |
50,864 |
0 |
+160 |
Annual Cost Burden ($) |
$0 |
$0 |
$0 |
$0 |
There are no tabulating or statistical analysis or publication plans for the collection of information. The data are used for regulatory purposes only.
The expiration date is displayed at https://www.reginfo.gov/public/do/PRAMain.
There are no exceptions.
1 16 U.S.C. 824e.
2 13 CFR 121.201 (2023) (Sector 22, Utilities).
3 “Burden” is the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, refer to 5 CFR 1320.3.
4 Based upon FERC’s 2024 average annual salary plus benefits, i.e., $207,786 per year ($100 per hour).
5 “PRA” refers to the Paperwork Reduction Act of 1995.
Page
File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document |
Author | Nishi Parekh |
File Modified | 0000-00-00 |
File Created | 2024-12-04 |