ANNUAL REPORTING REQUIREMENTS
(Recurring Information Collection Requirements)
Supporting Statement Section Rule Section Description Number of Respondents Responses per Respondent Total Number of Responses Burden per Response Total Annual Burden Hours Total Cost @ $300/Hour
2 50.33(a)-(d), (g), (j) Early Site Permit application - general information 0.33 1.0 0.33 360.0 118.8 $35,640

50.33(a)-(d), (j) Standard Design Certification application - general information 0.33 1.0 0.33 450.0 148.5 $44,550

50.33(a)-(d), (g), (j) Combined OL application - general information 2.0 1.0 2.00 2,700.0 5,400.0 $1,620,000

50.33(a)-(d), (j) Standard Design Approval application - general information 0.66 1.0 0.66 450.0 297.0 $89,100

50.33(a)-(d), (j) Manfacturing License application - general information 0.66 1.0 0.66 450.0 297.0 $89,100

50.33(a)-(d), (h), (j) NPUF Construction Permit application - general information 1.33 1.0 1.33 2,700.0 3,591.0 $1,077,300

50.33(a)-(d), (h), (j) NPUF Operating License application - general information 2.33 1.0 2.33 2,700.0 6,291.0 $1,887,300

50.33(a)-(d), (h)-(j) Nuclear Power Plant Construction Permit application - general information 1.33 1.0 1.33 2,700.0 3,591.0 $1,077,300

50.33(a)-(d), (g)-(j) Nuclear Power Plant Operating License application - technical information 1.0 1.0 1.0 2,700.0 2,700.0 $810,000

50.33(f) Financial qualification information as requested by the Commission 2.0 1.0 2.0 3,580.0 7,160.0 $2,148,000

50.34(a) Nuclear Power Plant Construction Permit application with deterministic emergency plan- general information (PSAR) 1.33 1.0 1.33 14,000.0 18,620.0 $5,586,000

50.34(a) Nuclear Power Plant Construction Permit application with performance based emergency plan in 50.160- general information (PSAR) - SMR or ONT 0.66 1.0 0.66 89,800.0 59,268.0 $17,780,400

50.34(b) NPUF Operating License application - technical information (FSAR) 2.33 1.0 2.33 7,000.0 16,310.0 $4,893,000

50.34(a) NPUF Operating License application - technical information (PSAR) 1.33 1.0 1.33 10,000.0 13,300.0 $3,990,000

50.34(a) Nuclear Power Plant Construction Permit application - general information (PSAR) 1.33 1.0 1.33 90,000.0 119,700.0 $35,910,000

50.34(b) Nuclear Power Plant Operating License application - technical information (FSAR) 1.0 1.0 1.0 40,000.0 40,000.0 $12,000,000

50.54(bb) Decommissioned plants submit program for managing and funding irradiated fuel following permanent cessation of operation of the reactor - - - 250.0 - $-

50.59(c), 50.90, 50.91(a), (b) License Amendments 164.0 6.0 982.0 313.0 307,366.0 $92,209,800

50.59(c), 50.90, 50.91(a), (b) License Amendments - Topical Reports 15.0 1.0 15.0 400.0 6,000.0 $1,800,000

50.74 Notification within 30 days of a change in status of a licensed reactor operator or senior operator. 67.0 3.0 201.0 1.0 201.0 $60,300

50.80(b) License Transfers 8.0 1.0 8.0 540.0 4,320.0 $1,296,000

50.83(b) & (d) Release of facility or site 2.0 1.0 2.0 240.0 480.0 $144,000

50.36 - Reports - Administrative Controls, 50.36a, 50.36b & Appendix I Technical Specifications 150.0 5.0 750.0 168.0 126,000.0 $37,800,000

50.36(c)(2) Technical Specifications - Risk Informed Completion Times (RICT) Program 28.0 1.0 28.0 60.0 1,680.0 $504,000

50.54(p)(2) - Submit Report (prepare and maintain safeguards contingency plan procedures) Physical security, training and qualification plan, and safeguards contingency plans – report description change within 2 months after the change is made (operating power reactors) 68.0 2.0 136.0 29.0 3,944.0 $1,183,200

50.54(p)(2) - Submit Report (prepare and maintain safeguards contingency plan procedures) Physical security, training and qualification plan, and safeguards contingency plans – report description change within 2 months after the change is made (decommissioned/shutdown power reactors) 25.0 1.0 25.0 29.0 725.0 $217,500

50.54(p)(2) - Submit Report - (prepare and maintain safeguards contingency plan procedures) Physical security plan – report description change within 2 months after the change is made (nonpower reactors) 31.0 0.2 5.0 29.0 145.0 $43,500

50.35(b) Periodic reports of the progress and results of research and development programs designed to resolve safety questions 31.0 0.2 6.2 100.0 620.0 $186,000

50.54(w)(3) Annual report on the source of property and damage insurance 119.0 1.0 119.0 4.0 476.0 $142,800

10 CFR 50.54(w)(4) Cleanup plan outlining the steps and costs needed to complete decontamination and cleanup following an accident - - - 2,000.0 - $-









3 50.33(k) Contents of applications 2.66 1.0 2.66 200.0 532.0 $159,600

50.75 Decommissioning planning 94.0 0.5 47.0 5.0 235.0 $70,500

50.82 Termination of license 5.0 1.0 5.0 680.0 3,400.0 $1,020,000









4 50.71(b)& Appendix C Annual financial reporting 60.0 1.0 60.0 1.0 60.0 $18,000

50.76 Submission of financial qualifications information within 75 days prior to ceasing to be an electric utility - - - 33.0 - $-

50.71(e) Updated FSAR (operating reactors) 54.0 1.0 54.0 900.0 48,600.0 $14,580,000

50.71(e) Updated FSAR (power reactors that have ceased operating) 25.0 1.0 25.0 225.0 5,625.0 $1,687,500

50.71(f) Updated FSAR (manufacturing license) - -
900.0 - $-

50.72 & 50.54(z) Notification of Events 94.0 5.9 554.6 5.76 3,194.5 $958,349

50.72 & 50.54(z) Notification of Events (Retractions) 94.0 0.5 47.0 8.00 376.0 $112,800

10 CFR Part 50, Appendix E, Paragraph E.9.d Daily testing of the ENS system by the HOO, submission of voluntary reactor status and grid information 94.0 365.0 34,310.0 0.083 2,847.7 $854,319

Appendix E, VI.1 Periodic Testing Quarterly testing of Emergency Response Data System 94.0 4.0 376.0 2.0 752.0 $225,600

Appendix E, VI.3 a&b HW/SW changes affecting ERDS DPLs and communication 9.0 1.0 9.0 4.0 36.0 $10,800

50.72(a) Emergency Response Data System reports 25.0 1.0 25.0 4.0 100.0 $30,000

50.70 Team Inspections (Engineering, Problem Identification and Resolution, Radiation Protection, Emergency Prepardness and In-Service Inspections) 54.0 5.0 270.0 32.0 8,640.0 $2,592,000

50.70 Other Inspections (e.g. Resident, Supplemental, Special and Infrequently Performed, Temporary Instructions, and Reactive) 54.0 1.0 54.0 45.0 2,430.0 $729,000

50.69(g) Submission of event report to submit a licensee event report for any event or condition that would have prevented RISC-1 and RISC-2 structures, systems, and components from performing a safety-significant function 10.0 1.0 10.0 600.0 6,000.0 $1,800,000









5 50.54(cc) Bankruptcy Notifications - - - 1.0 - $-

50.55(e) 48 hour notification (Design and Construction Deficiencies) 2.0 1.0 2.0 10.0 20.0 $6,000

50.55(e) 30-day reports (Design and Construction Deficiencies) 2.0 1.0 2.0 70.0 140.0 $42,000

50.55(f), Appendices A & B Quality Assurance reports (operating reactors) 94.0 1.0 94.0 160.0 15,040.0 $4,512,000

50.55(f), Appendices A & B Quality Assurance reports (reactors under construction) 2.0 1.0 2.0 160.0 320.0 $96,000

50.55(f), Appendices A & B Quality Assurance reports (Part 52 applicants) 2.0 1.0 2.0 667.0 1,334.0 $400,200

50.59(c) and d Power reactors - Reports changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each 119.0 1.0 119.0 380.0 45,220.0 $13,566,000

50.59(c) and d Non-power reactors - Reports changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each 31.0 1.0 31.0 120.0 3,720.0 $1,116,000

Appendices G & H, 50.60 Fracture Toughness 22.0 1.0 22.0 102.0 2,244.0 $673,200

50.61 Pressurized Thermal Shock 9.0 1.0 9.0 102.0 918.0 $275,400

50.61a Alterntate Pressurized Thermal Shock - - - 250.0 - $-

50.64(c)(1) Unique purpose application for highly enriched uranium 2.0 1.0 2.0 10.0 20.0 $6,000

50.64(c)(2)(i) Highly enriched uranium - updated documentation 4.0 1.0 4.0 10.0 40.0 $12,000

50.64(c)(2)(ii) Highly enriched uranium - updated documentation 4.0 1.0 4.0 10.0 40.0 $12,000

50.64(c)(2)(iii) Highly enriched uranium, safety analyses 3.0 1.0 3.0 333.3 1,000.0 $300,000

50.66 Thermal Annealing - - - 6,400.0 - $-









6 50.12 Exemptions 27.0 1.0 27.0 360.0 9,720.0 $2,916,000

50.9(b) Completeness of Information 94.0 - - 12.0 - $-









7 50.34(i) Part 50 applicants provide plans for implementing rule requirements in application - - - 300.0 - $-

50.44(c) Hydrogen Control Requirements - - - 203.0 - $-

50.46(a)(3)(ii) Annual report of changes to change evaluation model 105.0 1.0 105.0 20.0 2,100.0 $630,000

50.46(a)(3)(ii) 30-day report of significant change or error to evaluation model 52.0 1.0 52.0 20.0 1,040.0 $312,000

50.46, Appendix K Realistic evaluation model submittal 1.0 1.0 1.0 2,500.0 2,500.0 $750,000

50.46, Appendix K Modified evaluation model submittal 0.6 1.0 0.6 1,750.0 1,050.0 $315,000

50.46, Appendix K Schedule for completing actions associated with 10 CFR 50 Appendix K and 10 CFR 50.46(b) 1.6 1.0 1.6 16.0 25.6 $7,680

50.47, 50.54(q & t), Appendix E Emergency plans (operating power reactors) 54.0 25.0 1,350.0 81.0 109,350.0 $32,805,000

50.54(q)(4) Submission of proposed changes that would reduce the effectiveness of approved emergency plans (operating power reactors) 12.0 1.0 12.0 40.0 480.0 $144,000

50.54(q)(5) Submission of non-LAR changes to emergency plan - - - 20.0 - $-

50.54(q)(7) Current Licensee Submission of LAR to Request to Implement EP Program Under 10 CFR 50.160 - - - 1,260.0 - $-

App. E.IV.F.2.a,b Participation Exercise – exercise scenario submission 27.0 1.0 27.0 40.0 1,080.0 $324,000

50.47, 50.54(q & t), Appendix E Emergency plans (operating non-power reactors) 31.0 10.0 310.0 2.0 620.0 $186,000

50.47, 50.54(q & t), Appendix E Emergency plans (power reactor sites being decommissioned) 24.0 15.0 360.0 34.0 12,240.0 $3,672,000

50.47, 50.54(q & t), Appendix E Emergency plans (non-power reactors being decommissioned and possession only) 4.0 5.0 20.0 1.0 20.0 $6,000

50.47, 50.54(q & t), Appendix E Emergency Planning 110.0 18.0 1,980.0 60.0 118,800.0 $35,640,000

Appendix S and 50.54(ff) Earthquake Engineering Criteria, CPA/OL, DC/COL applicants 3.0 1.0 3.0 155,000.0 465,000.0 $139,500,000

Appendix S and 50.54(ff) Earthquake Engineering Criteria, Operating Reactors 2.0 1.0 2.0 900.0 1,800.0 $540,000

Total


42,694
1,627,459 $488,237,738

Sheet 2: Recordkeeping


ANNUAL RECORDKEEPING REQUIREMENTS
(Recurring Information Collection Requirements)
Supporting Statement Section Section Description Number of Recordkeepers Hours per Recordkeeper Total Annual Burden Hours Annual Cost @ $300/hr
2 50.33(a)-(d), (g), (j) Early Site Permits (records) 8.0 13.0 104.0 $31,200
50.33(a)-(d), (j) Standard Design Certification (records) 1.0 16.5 16.5 $4,950
50.33(a)-(d), (g), (j) Combined OL (records) 14.0 99.0 1,386.0 $415,800
50.33(a)-(d), (j) Standard Design Approval (records) 2.0 16.5 33.0 $9,900
50.33(a)-(d), (j) Manfacturing License (records) 2.0 16.5 33.0 $9,900
50.33(a)-(d), (h), (j) NPUF Construction Permit (records) 4.0 99.0 396.0 $118,800
50.33(a)-(d), (h), (j) NPUF Operating License (records) 7.0 99.0 693.0 $207,900
50.33(a)-(d), (h)-(j) Nuclear Power Plant Construction Permit (records) 4.0 99.0 396.0 $118,800
50.33(a)-(d), (g)-(j) Nuclear Power Plant Operating License (records) 3.0 99.0 297.0 $89,100
50.59(c), 50.90, 50.91(a), (b) Records License Amendments 162.0 192.0 31,104.0 $9,331,200
50.74 - Burden covered under 10 CFR 55.22 approved by OMB under Clearance No. 3150-0024 Records of change in status of a licensed reactor operator or senior operator - - - $-
50.80(b) License Transfers 8.0 60.0 480.0 $144,000
50.36,50.36A, 50.36B & Appendix I Technical Specifications (Operating power reactor) 94.0 2080.0 195,520.0 $58,656,000
50.36,50.36A, 50.36B & Appendix I Technical Specifications (operating NPUFs) 31.0 208.0 6,448.0 $1,934,400
50.36,50.36A, 50.36B & Appendix I Technical Specifications (shutdown power reactor) 25.0 208.0 5,200.0 $1,560,000

50.54(p)(2) - Burden covered under 10 CFR 73.55(c)(4) and 10 CFR 73.55(c)(5) approved by OMB under Clearance No. 3150-0002 Records of physical security, training and qualification plan, and safeguards contingency plans – report description change within 2 months after the change is made 0.0 0.0 - $-







3 50.75 Decommissioning planning 169.0 51.0 8,619.0 $2,585,700







4 50.71(b)& Appendix C Financial records 60.0 0.1 6.0 $1,800
50.71(e) Records for updated FSAR (operating reactors) 54.0 150.0 8,100.0 $2,430,000
50.71(e) Records for updated FSAR (power reactors that have ceased operating) 25.0 25.0 625.0 $187,500
50.71(h)(1) Fuel Load 10.0 1,533.0 15,330.0 $4,599,000
50.71(h)(2) Fuel Load (Quadrennial) 5.0 200.0 1,000.0 $300,000
50.71(h)(3) Fuel Load (One-time requirement) - 1,533.0 - $-
50.72 & 50.54(z) Notification of Events 94.0 0.8 75.2 $22,560
50.72 & 50.54(z) Notification of Events (Retractions) 94.0 0.1 9.4 $2,820
Appendix E, VI.1 Periodic Testing Quarterly testing of Emergency Response Data System 94.0 0.5 47.0 $14,100
Appendix E, VI.3 a&b HW/SW changes affecting ERDS DPLs and communication 9.0 1.0 9.0 $2,700
50.72(a) Emergency Data Response System 25.0 0.5 12.5 $3,750
50.69 Maintain processes to control the inspection, testing, and corrective actions for structures, systems, and components, other SSC records 10.0 833.0 8,330.0 $2,499,000
50.69 (one-time implementation requirements) After approval of application, perform evaluations of the significance of SSC functions (implementation for the alternative requirements of 10 CFR 50.69 - voluntary) 16.0 920.0 14,720.0 $4,416,000







5 50.54(hh)(1) Procedures for aircraft threat 54.0 40.0 2,160.0 $648,000
50.55(e) Retention of evaluations, 50.55(e)(9)(ii) (Design and Construction Deficiencies) 25.0 2.0 50.0 $15,000
50.55(f), Appendices A & B Quality Assurance records (operating reactors, 4 reactors under construction, 1 ESP, 1 COL) 104.0 10,000.0 1,040,000.0 $312,000,000
50.55(f), Appendices A & B Quality Assurance records (shutdown reactors) 25.0 2,500.0 62,500.0 $18,750,000
50.59(c) and (d) Power reactors - Records of changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each 119.0 100.0 11,900.0 $3,570,000
50.59(c) and (d) Non-power reactors - Records of changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each 31.0 100.0 3,100.0 $930,000
Appendices G & H, 50.60 Fracture Toughness 22.0 11.0 242.0 $72,600
50.61 Pressurized Thermal Shock 9.0 11.0 99.0 $29,700
50.61a Alterntate Pressurized Thermal Shock - 20.0 - $-
50.65 Maintenance program records for operating plants 94.0 3,000.0 282,000.0 $84,600,000
50.65 Maintenance program records for shutdown plants 25.0 128.0 3,200.0 $960,000







6 50.12 Exemptions 27.0 40.0 1,080.0 $324,000

50.9(b) Completeness of Information 5.0 1.0 5.0 $1,500







7 50.44(c) Hydrogen Control Requirements 94.0 1.0 94.0 $28,200
50.47, 50.54(q & t), Appendix E Emergency Planning Records for Operating Power Reactors 110.0 589.0 64,790.0 $19,437,000
52.17, 52.79, 50.54, 50.160 Emergency Planning Records for Operating Power Reactors - performance based framework (SMR and ONT) 3.0 295.0 885.0 $265,500
50.47, 50.54(q & t), Appendix E Emergency Planning Records for Operating Non-Power Reactors 31.0 589.0 18,259.0 $5,477,700
50.47, 50.54(q & t), Appendix E Emergency Planning Records for Power Reactor Sites Being Decommissioned 24.0 256.0 6,144.0 $1,843,200
50.47, 50.54(q & t), Appendix E Emergency Planning Records for Non-Power Reactors Being Decommissioned and Possession Only 4.0 4.0 16.0 $4,800
50.48 (c) One-time transition of records for fire protection to NFPA 805 - - - $-
50.48, Appendix R Fire Protection plan records 116.0 84.0 9,744.0 $2,923,200
50.49(a),(d),(f)
One-time environmental qualification (program establishment, qualification of equipment), annualized 9.0 793.3 7,139.7 $2,141,910
50.49(d),(f),(j)
Environmental Qualification 101.0 2,080.0 210,080.0 $63,024,000
50.120(b) Training & Qualification Records for Operating Reactors 59.0 780.0 46,020.0 $13,806,000
50.120(b) Training & Qualification Records for Applicants 5.0 1,440.0 7,200.0 $2,160,000
50.155(a)(1) One-time Licensees review rule requirements and update procedures, programs, or plans 2.0 315.0 630.0 $189,000
50.155(f)(1) - Burden captured under Section 50.71(e) Maintain documentation of changes in the implementation of requirements - 50.0 - $-
Appendix J Development and Ongoing Analyses & Maintenance of Performance Based Leakage Testing Program 158.0 60.0 9,480.0 $2,844,000
Appendix S and 50.54(ff) Earthquake Engineering Criteria, Operating Reactors 2.0 100.0 200.0 $60,000
Appendix S and 50.54(ff) Earthquake Engineering Criteria, CPA/OL, DC/COL applicants 3.0 100.0 300.0 $90,000
Appendix S IV(a)(3) Plant inspection and documentation of inspection following seismic event 2.0 320.0 640.0 $192,000

Total
169
2,086,947.3 $626,084,190

Sheet 3: Totals

Total Burden and Responses Section 2

Total Burden and Responses Section 3


Item #13, Other Costs Section




Hours Responses


Hours Responses
Section Costs



Reporting 748,749 2,297

Reporting 4,167 55
2 $29,053



Recordkeeping 242,107 162

Recordkeeping 8,619 169
3 $1,034



TOTAL 990,856 2,459

TOTAL 12,786 224
4 $5,792












5 $168,630












6 $130



Item #13, Other Costs Section 2


Item #13, Other Costs Section 3


7 $45,795



Recordkeeping $29,053


Recordkeeping $1,034

Total $250,434



TOTAL $29,053


TOTAL $1,034































Item #14, Costs to the Federal Government,


Item #14, Costs to the Federal Government, Section 2

Item #14, Costs to the Federal Government, Section 3
Section Staff Time Hours Cost @ $300/hr



Hours Cost @ $300/hr


Hours Cost @ $300/hr






Staff time 101953 $30,585,900

Staff time 1526 $457,800
2 101,953 $30,585,900











3 1,526 $457,800











4 41,295 $12,388,500


Total Burden and Responses Section 4





5 73,115 $21,934,500



Hours Responses

Total Burden and Responses Section 5


6 2,250 $675,000


Reporting 78,661 35,795


Hours Responses
7 20,275 $6,082,500


Recordkeeping 48,264 94

Reporting 70,056 296
Total 240,414 $72,124,200


TOTAL 126,925 35,889

Recordkeeping 1,405,251 119











Third Party Disclosure 0 0
Burden Hours





TOTAL 1,475,307 415
Section Reporting Recordkeeping 3rd Party Total Cost
Item #13, Other Costs Section 4













Recordkeeping $5,792






2 748,749 242,107 0 990,856 $297,256,740
TOTAL $5,792


Item #13, Other Costs Section 5


3 4,167 8,619 0 12,786 $3,835,800





Recordkeeping $168,630

4 78,661 48,264 0 126,925 $38,077,598





TOTAL $168,630

5 70,056 1,405,251 0 1,475,307 $442,592,100
Item #14, Costs to the Federal Government, Section 4







6 9,720 1,085 0 10,805 $3,241,500

Hours Cost @ $300/hr





7 716,106 381,622 0 1,097,727 $329,318,190
Staff time 41295 $12,388,500

Item #14, Costs to the Federal Government, Section 5
Total 1,627,459 2,086,947 0 3,714,406 $1,114,321,928






Hours Cost @ $300/hr
Previous total 1,184,556 2,448,598 200 3,633,354 $1,090,006,260





Staff time 73,115 $21,934,500
Deltas 442,904 -361,651 -200 81,053 $24,315,848















Total Burden and Responses Section 6



Total Burden and Responses Section 7







Hours Responses


Hours Responses
Responses
Reporting 9,720 27

Reporting 716,106 4,224
Section Reporting Recordkeeping 3rd Party TOTAL
Recordkeeping 1,085 32

Recordkeeping 381,622 158






TOTAL 10,805 59

TOTAL 1,097,727 4,382
2 2,297 162 0 2,459









3 55 169 0 224









4 35,795 94 0 35,889
Item #13, Other Costs Section 6



Item #13, Other Costs Section 7


5 296 119 0 415
Recordkeeping $130


Recordkeeping $45,795

6 27 32 0 59
TOTAL $130


TOTAL $45,795

7 4,224 158 0 4,382









2024 TOTAL 42,694 169 0 42,863









Previous total 42,025 164 2 42,191
Item #14, Costs to the Federal Government, Section 6



Item #14, Costs to the Federal Government, Section 7


Deltas 669 5 -2 672

Hours Cost @ $300/hr


Hours Cost @ $300/hr






Staff time 2,250 $675,000

Staff time 20,275 $6,082,500










































HOURS RESPONSES











2024 3,714,406 42,863











Previous 3,633,354 42,191











Delta 81,052 672






File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy