ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements) |
Supporting Statement Section |
Rule Section |
Description |
Number of Respondents |
Responses per Respondent |
Total Number of Responses |
Burden per Response |
Total Annual Burden Hours |
Total Cost @ $300/Hour |
2 |
50.33(a)-(d), (g), (j) |
Early Site Permit application - general information |
0.33 |
1.0 |
0.33 |
360.0 |
118.8 |
$35,640 |
|
50.33(a)-(d), (j) |
Standard Design Certification application - general information |
0.33 |
1.0 |
0.33 |
450.0 |
148.5 |
$44,550 |
|
50.33(a)-(d), (g), (j) |
Combined OL application - general information |
2.0 |
1.0 |
2.00 |
2,700.0 |
5,400.0 |
$1,620,000 |
|
50.33(a)-(d), (j) |
Standard Design Approval application - general information |
0.66 |
1.0 |
0.66 |
450.0 |
297.0 |
$89,100 |
|
50.33(a)-(d), (j) |
Manfacturing License application - general information |
0.66 |
1.0 |
0.66 |
450.0 |
297.0 |
$89,100 |
|
50.33(a)-(d), (h), (j) |
NPUF Construction Permit application - general information |
1.33 |
1.0 |
1.33 |
2,700.0 |
3,591.0 |
$1,077,300 |
|
50.33(a)-(d), (h), (j) |
NPUF Operating License application - general information |
2.33 |
1.0 |
2.33 |
2,700.0 |
6,291.0 |
$1,887,300 |
|
50.33(a)-(d), (h)-(j) |
Nuclear Power Plant Construction Permit application - general information |
1.33 |
1.0 |
1.33 |
2,700.0 |
3,591.0 |
$1,077,300 |
|
50.33(a)-(d), (g)-(j) |
Nuclear Power Plant Operating License application - technical information |
1.0 |
1.0 |
1.0 |
2,700.0 |
2,700.0 |
$810,000 |
|
50.33(f) |
Financial qualification information as requested by the Commission |
2.0 |
1.0 |
2.0 |
3,580.0 |
7,160.0 |
$2,148,000 |
|
50.34(a) |
Nuclear Power Plant Construction Permit application with deterministic emergency plan- general information (PSAR) |
1.33 |
1.0 |
1.33 |
14,000.0 |
18,620.0 |
$5,586,000 |
|
50.34(a) |
Nuclear Power Plant Construction Permit application with performance based emergency plan in 50.160- general information (PSAR) - SMR or ONT |
0.66 |
1.0 |
0.66 |
89,800.0 |
59,268.0 |
$17,780,400 |
|
50.34(b) |
NPUF Operating License application - technical information (FSAR) |
2.33 |
1.0 |
2.33 |
7,000.0 |
16,310.0 |
$4,893,000 |
|
50.34(a) |
NPUF Operating License application - technical information (PSAR) |
1.33 |
1.0 |
1.33 |
10,000.0 |
13,300.0 |
$3,990,000 |
|
50.34(a) |
Nuclear Power Plant Construction Permit application - general information (PSAR) |
1.33 |
1.0 |
1.33 |
90,000.0 |
119,700.0 |
$35,910,000 |
|
50.34(b) |
Nuclear Power Plant Operating License application - technical information (FSAR) |
1.0 |
1.0 |
1.0 |
40,000.0 |
40,000.0 |
$12,000,000 |
|
50.54(bb) |
Decommissioned plants submit program for managing and funding irradiated fuel following permanent cessation of operation of the reactor |
- |
- |
- |
250.0 |
- |
$- |
|
50.59(c), 50.90, 50.91(a), (b) |
License Amendments |
164.0 |
6.0 |
982.0 |
313.0 |
307,366.0 |
$92,209,800 |
|
50.59(c), 50.90, 50.91(a), (b) |
License Amendments - Topical Reports |
15.0 |
1.0 |
15.0 |
400.0 |
6,000.0 |
$1,800,000 |
|
50.74 |
Notification within 30 days of a change in status of a licensed reactor operator or senior operator. |
67.0 |
3.0 |
201.0 |
1.0 |
201.0 |
$60,300 |
|
50.80(b) |
License Transfers |
8.0 |
1.0 |
8.0 |
540.0 |
4,320.0 |
$1,296,000 |
|
50.83(b) & (d) |
Release of facility or site |
2.0 |
1.0 |
2.0 |
240.0 |
480.0 |
$144,000 |
|
50.36 - Reports - Administrative Controls, 50.36a, 50.36b & Appendix I |
Technical Specifications |
150.0 |
5.0 |
750.0 |
168.0 |
126,000.0 |
$37,800,000 |
|
50.36(c)(2) |
Technical Specifications - Risk Informed Completion Times (RICT) Program |
28.0 |
1.0 |
28.0 |
60.0 |
1,680.0 |
$504,000 |
|
50.54(p)(2) - Submit Report (prepare and maintain safeguards contingency plan procedures) |
Physical security, training and qualification plan, and safeguards contingency plans – report description change within 2 months after the change is made (operating power reactors) |
68.0 |
2.0 |
136.0 |
29.0 |
3,944.0 |
$1,183,200 |
|
50.54(p)(2) - Submit Report (prepare and maintain safeguards contingency plan procedures) |
Physical security, training and qualification plan, and safeguards contingency plans – report description change within 2 months after the change is made (decommissioned/shutdown power reactors) |
25.0 |
1.0 |
25.0 |
29.0 |
725.0 |
$217,500 |
|
50.54(p)(2) - Submit Report - (prepare and maintain safeguards contingency plan procedures) |
Physical security plan – report description change within 2 months after the change is made (nonpower reactors) |
31.0 |
0.2 |
5.0 |
29.0 |
145.0 |
$43,500 |
|
50.35(b) |
Periodic reports of the progress and results of research and development programs designed to resolve safety questions |
31.0 |
0.2 |
6.2 |
100.0 |
620.0 |
$186,000 |
|
50.54(w)(3) |
Annual report on the source of property and damage insurance |
119.0 |
1.0 |
119.0 |
4.0 |
476.0 |
$142,800 |
|
10 CFR 50.54(w)(4) |
Cleanup plan outlining the steps and costs needed to complete decontamination and cleanup following an accident |
- |
- |
- |
2,000.0 |
- |
$- |
|
|
|
|
|
|
|
|
|
3 |
50.33(k) |
Contents of applications |
2.66 |
1.0 |
2.66 |
200.0 |
532.0 |
$159,600 |
|
50.75 |
Decommissioning planning |
94.0 |
0.5 |
47.0 |
5.0 |
235.0 |
$70,500 |
|
50.82 |
Termination of license |
5.0 |
1.0 |
5.0 |
680.0 |
3,400.0 |
$1,020,000 |
|
|
|
|
|
|
|
|
|
4 |
50.71(b)& Appendix C |
Annual financial reporting |
60.0 |
1.0 |
60.0 |
1.0 |
60.0 |
$18,000 |
|
50.76 |
Submission of financial qualifications information within 75 days prior to ceasing to be an electric utility |
- |
- |
- |
33.0 |
- |
$- |
|
50.71(e) |
Updated FSAR (operating reactors) |
54.0 |
1.0 |
54.0 |
900.0 |
48,600.0 |
$14,580,000 |
|
50.71(e) |
Updated FSAR (power reactors that have ceased operating) |
25.0 |
1.0 |
25.0 |
225.0 |
5,625.0 |
$1,687,500 |
|
50.71(f) |
Updated FSAR (manufacturing license) |
- |
- |
|
900.0 |
- |
$- |
|
50.72 & 50.54(z) |
Notification of Events |
94.0 |
5.9 |
554.6 |
5.76 |
3,194.5 |
$958,349 |
|
50.72 & 50.54(z) |
Notification of Events (Retractions) |
94.0 |
0.5 |
47.0 |
8.00 |
376.0 |
$112,800 |
|
10 CFR Part 50, Appendix E, Paragraph E.9.d |
Daily testing of the ENS system by the HOO, submission of voluntary reactor status and grid information |
94.0 |
365.0 |
34,310.0 |
0.083 |
2,847.7 |
$854,319 |
|
Appendix E, VI.1 Periodic Testing |
Quarterly testing of Emergency Response Data System |
94.0 |
4.0 |
376.0 |
2.0 |
752.0 |
$225,600 |
|
Appendix E, VI.3 a&b |
HW/SW changes affecting ERDS DPLs and communication |
9.0 |
1.0 |
9.0 |
4.0 |
36.0 |
$10,800 |
|
50.72(a) |
Emergency Response Data System reports |
25.0 |
1.0 |
25.0 |
4.0 |
100.0 |
$30,000 |
|
50.70 |
Team Inspections (Engineering, Problem Identification and Resolution, Radiation Protection, Emergency Prepardness and In-Service Inspections) |
54.0 |
5.0 |
270.0 |
32.0 |
8,640.0 |
$2,592,000 |
|
50.70 |
Other Inspections (e.g. Resident, Supplemental, Special and Infrequently Performed, Temporary Instructions, and Reactive) |
54.0 |
1.0 |
54.0 |
45.0 |
2,430.0 |
$729,000 |
|
50.69(g) |
Submission of event report to submit a licensee event report for any event or condition that would have prevented RISC-1 and RISC-2 structures, systems, and components from performing a safety-significant function |
10.0 |
1.0 |
10.0 |
600.0 |
6,000.0 |
$1,800,000 |
|
|
|
|
|
|
|
|
|
5 |
50.54(cc) |
Bankruptcy Notifications |
- |
- |
- |
1.0 |
- |
$- |
|
50.55(e) |
48 hour notification (Design and Construction Deficiencies) |
2.0 |
1.0 |
2.0 |
10.0 |
20.0 |
$6,000 |
|
50.55(e) |
30-day reports (Design and Construction Deficiencies) |
2.0 |
1.0 |
2.0 |
70.0 |
140.0 |
$42,000 |
|
50.55(f), Appendices A & B |
Quality Assurance reports (operating reactors) |
94.0 |
1.0 |
94.0 |
160.0 |
15,040.0 |
$4,512,000 |
|
50.55(f), Appendices A & B |
Quality Assurance reports (reactors under construction) |
2.0 |
1.0 |
2.0 |
160.0 |
320.0 |
$96,000 |
|
50.55(f), Appendices A & B |
Quality Assurance reports (Part 52 applicants) |
2.0 |
1.0 |
2.0 |
667.0 |
1,334.0 |
$400,200 |
|
50.59(c) and d |
Power reactors - Reports changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each |
119.0 |
1.0 |
119.0 |
380.0 |
45,220.0 |
$13,566,000 |
|
50.59(c) and d |
Non-power reactors - Reports changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each |
31.0 |
1.0 |
31.0 |
120.0 |
3,720.0 |
$1,116,000 |
|
Appendices G & H, 50.60 |
Fracture Toughness |
22.0 |
1.0 |
22.0 |
102.0 |
2,244.0 |
$673,200 |
|
50.61 |
Pressurized Thermal Shock |
9.0 |
1.0 |
9.0 |
102.0 |
918.0 |
$275,400 |
|
50.61a |
Alterntate Pressurized Thermal Shock |
- |
- |
- |
250.0 |
- |
$- |
|
50.64(c)(1) |
Unique purpose application for highly enriched uranium |
2.0 |
1.0 |
2.0 |
10.0 |
20.0 |
$6,000 |
|
50.64(c)(2)(i) |
Highly enriched uranium - updated documentation |
4.0 |
1.0 |
4.0 |
10.0 |
40.0 |
$12,000 |
|
50.64(c)(2)(ii) |
Highly enriched uranium - updated documentation |
4.0 |
1.0 |
4.0 |
10.0 |
40.0 |
$12,000 |
|
50.64(c)(2)(iii) |
Highly enriched uranium, safety analyses |
3.0 |
1.0 |
3.0 |
333.3 |
1,000.0 |
$300,000 |
|
50.66 |
Thermal Annealing |
- |
- |
- |
6,400.0 |
- |
$- |
|
|
|
|
|
|
|
|
|
6 |
50.12 |
Exemptions |
27.0 |
1.0 |
27.0 |
360.0 |
9,720.0 |
$2,916,000 |
|
50.9(b) |
Completeness of Information |
94.0 |
- |
- |
12.0 |
- |
$- |
|
|
|
|
|
|
|
|
|
7 |
50.34(i) |
Part 50 applicants provide plans for implementing rule requirements in application |
- |
- |
- |
300.0 |
- |
$- |
|
50.44(c) |
Hydrogen Control Requirements |
- |
- |
- |
203.0 |
- |
$- |
|
50.46(a)(3)(ii) |
Annual report of changes to change evaluation model |
105.0 |
1.0 |
105.0 |
20.0 |
2,100.0 |
$630,000 |
|
50.46(a)(3)(ii) |
30-day report of significant change or error to evaluation model |
52.0 |
1.0 |
52.0 |
20.0 |
1,040.0 |
$312,000 |
|
50.46, Appendix K |
Realistic evaluation model submittal |
1.0 |
1.0 |
1.0 |
2,500.0 |
2,500.0 |
$750,000 |
|
50.46, Appendix K |
Modified evaluation model submittal |
0.6 |
1.0 |
0.6 |
1,750.0 |
1,050.0 |
$315,000 |
|
50.46, Appendix K |
Schedule for completing actions associated with 10 CFR 50 Appendix K and 10 CFR 50.46(b) |
1.6 |
1.0 |
1.6 |
16.0 |
25.6 |
$7,680 |
|
50.47, 50.54(q & t), Appendix E |
Emergency plans (operating power reactors) |
54.0 |
25.0 |
1,350.0 |
81.0 |
109,350.0 |
$32,805,000 |
|
50.54(q)(4) |
Submission of proposed changes that would reduce the effectiveness of approved emergency plans (operating power reactors) |
12.0 |
1.0 |
12.0 |
40.0 |
480.0 |
$144,000 |
|
50.54(q)(5) |
Submission of non-LAR changes to emergency plan |
- |
- |
- |
20.0 |
- |
$- |
|
50.54(q)(7) |
Current Licensee Submission of LAR to Request to Implement EP Program Under 10 CFR 50.160 |
- |
- |
- |
1,260.0 |
- |
$- |
|
App. E.IV.F.2.a,b |
Participation Exercise – exercise scenario submission |
27.0 |
1.0 |
27.0 |
40.0 |
1,080.0 |
$324,000 |
|
50.47, 50.54(q & t), Appendix E |
Emergency plans (operating non-power reactors) |
31.0 |
10.0 |
310.0 |
2.0 |
620.0 |
$186,000 |
|
50.47, 50.54(q & t), Appendix E |
Emergency plans (power reactor sites being decommissioned) |
24.0 |
15.0 |
360.0 |
34.0 |
12,240.0 |
$3,672,000 |
|
50.47, 50.54(q & t), Appendix E |
Emergency plans (non-power reactors being decommissioned and possession only) |
4.0 |
5.0 |
20.0 |
1.0 |
20.0 |
$6,000 |
|
50.47, 50.54(q & t), Appendix E |
Emergency Planning |
110.0 |
18.0 |
1,980.0 |
60.0 |
118,800.0 |
$35,640,000 |
|
Appendix S and 50.54(ff) |
Earthquake Engineering Criteria, CPA/OL, DC/COL applicants |
3.0 |
1.0 |
3.0 |
155,000.0 |
465,000.0 |
$139,500,000 |
|
Appendix S and 50.54(ff) |
Earthquake Engineering Criteria, Operating Reactors |
2.0 |
1.0 |
2.0 |
900.0 |
1,800.0 |
$540,000 |
|
Total |
|
|
|
42,694 |
|
1,627,459 |
$488,237,738 |
|
ANNUAL RECORDKEEPING REQUIREMENTS (Recurring Information Collection Requirements) |
Supporting Statement Section |
Section |
Description |
Number of Recordkeepers |
Hours per Recordkeeper |
Total Annual Burden Hours |
Annual Cost @ $300/hr |
2 |
50.33(a)-(d), (g), (j) |
Early Site Permits (records) |
8.0 |
13.0 |
104.0 |
$31,200 |
50.33(a)-(d), (j) |
Standard Design Certification (records) |
1.0 |
16.5 |
16.5 |
$4,950 |
50.33(a)-(d), (g), (j) |
Combined OL (records) |
14.0 |
99.0 |
1,386.0 |
$415,800 |
50.33(a)-(d), (j) |
Standard Design Approval (records) |
2.0 |
16.5 |
33.0 |
$9,900 |
50.33(a)-(d), (j) |
Manfacturing License (records) |
2.0 |
16.5 |
33.0 |
$9,900 |
50.33(a)-(d), (h), (j) |
NPUF Construction Permit (records) |
4.0 |
99.0 |
396.0 |
$118,800 |
50.33(a)-(d), (h), (j) |
NPUF Operating License (records) |
7.0 |
99.0 |
693.0 |
$207,900 |
50.33(a)-(d), (h)-(j) |
Nuclear Power Plant Construction Permit (records) |
4.0 |
99.0 |
396.0 |
$118,800 |
50.33(a)-(d), (g)-(j) |
Nuclear Power Plant Operating License (records) |
3.0 |
99.0 |
297.0 |
$89,100 |
50.59(c), 50.90, 50.91(a), (b) |
Records License Amendments |
162.0 |
192.0 |
31,104.0 |
$9,331,200 |
50.74 - Burden covered under 10 CFR 55.22 approved by OMB under Clearance No. 3150-0024 |
Records of change in status of a licensed reactor operator or senior operator |
- |
- |
- |
$- |
50.80(b) |
License Transfers |
8.0 |
60.0 |
480.0 |
$144,000 |
50.36,50.36A, 50.36B & Appendix I |
Technical Specifications (Operating power reactor) |
94.0 |
2080.0 |
195,520.0 |
$58,656,000 |
50.36,50.36A, 50.36B & Appendix I |
Technical Specifications (operating NPUFs) |
31.0 |
208.0 |
6,448.0 |
$1,934,400 |
50.36,50.36A, 50.36B & Appendix I |
Technical Specifications (shutdown power reactor) |
25.0 |
208.0 |
5,200.0 |
$1,560,000 |
|
50.54(p)(2) - Burden covered under 10 CFR 73.55(c)(4) and 10 CFR 73.55(c)(5) approved by OMB under Clearance No. 3150-0002 |
Records of physical security, training and qualification plan, and safeguards contingency plans – report description change within 2 months after the change is made |
0.0 |
0.0 |
- |
$- |
|
|
|
|
|
|
|
3 |
50.75 |
Decommissioning planning |
169.0 |
51.0 |
8,619.0 |
$2,585,700 |
|
|
|
|
|
|
|
4 |
50.71(b)& Appendix C |
Financial records |
60.0 |
0.1 |
6.0 |
$1,800 |
50.71(e) |
Records for updated FSAR (operating reactors) |
54.0 |
150.0 |
8,100.0 |
$2,430,000 |
50.71(e) |
Records for updated FSAR (power reactors that have ceased operating) |
25.0 |
25.0 |
625.0 |
$187,500 |
50.71(h)(1) |
Fuel Load |
10.0 |
1,533.0 |
15,330.0 |
$4,599,000 |
50.71(h)(2) |
Fuel Load (Quadrennial) |
5.0 |
200.0 |
1,000.0 |
$300,000 |
50.71(h)(3) |
Fuel Load (One-time requirement) |
- |
1,533.0 |
- |
$- |
50.72 & 50.54(z) |
Notification of Events |
94.0 |
0.8 |
75.2 |
$22,560 |
50.72 & 50.54(z) |
Notification of Events (Retractions) |
94.0 |
0.1 |
9.4 |
$2,820 |
Appendix E, VI.1 Periodic Testing |
Quarterly testing of Emergency Response Data System |
94.0 |
0.5 |
47.0 |
$14,100 |
Appendix E, VI.3 a&b |
HW/SW changes affecting ERDS DPLs and communication |
9.0 |
1.0 |
9.0 |
$2,700 |
50.72(a) |
Emergency Data Response System |
25.0 |
0.5 |
12.5 |
$3,750 |
50.69 |
Maintain processes to control the inspection, testing, and corrective actions for structures, systems, and components, other SSC records |
10.0 |
833.0 |
8,330.0 |
$2,499,000 |
50.69 (one-time implementation requirements) |
After approval of application, perform evaluations of the significance of SSC functions (implementation for the alternative requirements of 10 CFR 50.69 - voluntary) |
16.0 |
920.0 |
14,720.0 |
$4,416,000 |
|
|
|
|
|
|
|
5 |
50.54(hh)(1) |
Procedures for aircraft threat |
54.0 |
40.0 |
2,160.0 |
$648,000 |
50.55(e) |
Retention of evaluations, 50.55(e)(9)(ii) (Design and Construction Deficiencies) |
25.0 |
2.0 |
50.0 |
$15,000 |
50.55(f), Appendices A & B |
Quality Assurance records (operating reactors, 4 reactors under construction, 1 ESP, 1 COL) |
104.0 |
10,000.0 |
1,040,000.0 |
$312,000,000 |
50.55(f), Appendices A & B |
Quality Assurance records (shutdown reactors) |
25.0 |
2,500.0 |
62,500.0 |
$18,750,000 |
50.59(c) and (d) |
Power reactors - Records of changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each |
119.0 |
100.0 |
11,900.0 |
$3,570,000 |
50.59(c) and (d) |
Non-power reactors - Records of changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each |
31.0 |
100.0 |
3,100.0 |
$930,000 |
Appendices G & H, 50.60 |
Fracture Toughness |
22.0 |
11.0 |
242.0 |
$72,600 |
50.61 |
Pressurized Thermal Shock |
9.0 |
11.0 |
99.0 |
$29,700 |
50.61a |
Alterntate Pressurized Thermal Shock |
- |
20.0 |
- |
$- |
50.65 |
Maintenance program records for operating plants |
94.0 |
3,000.0 |
282,000.0 |
$84,600,000 |
50.65 |
Maintenance program records for shutdown plants |
25.0 |
128.0 |
3,200.0 |
$960,000 |
|
|
|
|
|
|
|
6 |
50.12 |
Exemptions |
27.0 |
40.0 |
1,080.0 |
$324,000 |
|
50.9(b) |
Completeness of Information |
5.0 |
1.0 |
5.0 |
$1,500 |
|
|
|
|
|
|
|
7 |
50.44(c) |
Hydrogen Control Requirements |
94.0 |
1.0 |
94.0 |
$28,200 |
50.47, 50.54(q & t), Appendix E |
Emergency Planning Records for Operating Power Reactors |
110.0 |
589.0 |
64,790.0 |
$19,437,000 |
52.17, 52.79, 50.54, 50.160 |
Emergency Planning Records for Operating Power Reactors - performance based framework (SMR and ONT) |
3.0 |
295.0 |
885.0 |
$265,500 |
50.47, 50.54(q & t), Appendix E |
Emergency Planning Records for Operating Non-Power Reactors |
31.0 |
589.0 |
18,259.0 |
$5,477,700 |
50.47, 50.54(q & t), Appendix E |
Emergency Planning Records for Power Reactor Sites Being Decommissioned |
24.0 |
256.0 |
6,144.0 |
$1,843,200 |
50.47, 50.54(q & t), Appendix E |
Emergency Planning Records for Non-Power Reactors Being Decommissioned and Possession Only |
4.0 |
4.0 |
16.0 |
$4,800 |
50.48 (c) |
One-time transition of records for fire protection to NFPA 805 |
- |
- |
- |
$- |
50.48, Appendix R |
Fire Protection plan records |
116.0 |
84.0 |
9,744.0 |
$2,923,200 |
50.49(a),(d),(f)
|
One-time environmental qualification (program establishment, qualification of equipment), annualized |
9.0 |
793.3 |
7,139.7 |
$2,141,910 |
50.49(d),(f),(j)
|
Environmental Qualification |
101.0 |
2,080.0 |
210,080.0 |
$63,024,000 |
50.120(b) |
Training & Qualification Records for Operating Reactors |
59.0 |
780.0 |
46,020.0 |
$13,806,000 |
50.120(b) |
Training & Qualification Records for Applicants |
5.0 |
1,440.0 |
7,200.0 |
$2,160,000 |
50.155(a)(1) |
One-time Licensees review rule requirements and update procedures, programs, or plans |
2.0 |
315.0 |
630.0 |
$189,000 |
50.155(f)(1) - Burden captured under Section 50.71(e) |
Maintain documentation of changes in the implementation of requirements |
- |
50.0 |
- |
$- |
Appendix J |
Development and Ongoing Analyses & Maintenance of Performance Based Leakage Testing Program |
158.0 |
60.0 |
9,480.0 |
$2,844,000 |
Appendix S and 50.54(ff) |
Earthquake Engineering Criteria, Operating Reactors |
2.0 |
100.0 |
200.0 |
$60,000 |
Appendix S and 50.54(ff) |
Earthquake Engineering Criteria, CPA/OL, DC/COL applicants |
3.0 |
100.0 |
300.0 |
$90,000 |
Appendix S IV(a)(3) |
Plant inspection and documentation of inspection following seismic event |
2.0 |
320.0 |
640.0 |
$192,000 |
|
Total |
|
169 |
|
2,086,947.3 |
$626,084,190 |
Total Burden and Responses Section 2 |
|
|
Total Burden and Responses Section 3 |
|
|
|
Item #13, Other Costs Section |
|
|
|
|
|
Hours |
Responses |
|
|
|
Hours |
Responses |
|
Section |
Costs |
|
|
|
|
Reporting |
748,749 |
2,297 |
|
|
Reporting |
4,167 |
55 |
|
2 |
$29,053 |
|
|
|
|
Recordkeeping |
242,107 |
162 |
|
|
Recordkeeping |
8,619 |
169 |
|
3 |
$1,034 |
|
|
|
|
TOTAL |
990,856 |
2,459 |
|
|
TOTAL |
12,786 |
224 |
|
4 |
$5,792 |
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
$168,630 |
|
|
|
|
|
|
|
|
|
|
|
|
|
6 |
$130 |
|
|
|
|
Item #13, Other Costs Section 2 |
|
|
|
Item #13, Other Costs Section 3 |
|
|
|
7 |
$45,795 |
|
|
|
|
Recordkeeping |
$29,053 |
|
|
|
Recordkeeping |
$1,034 |
|
|
Total |
$250,434 |
|
|
|
|
TOTAL |
$29,053 |
|
|
|
TOTAL |
$1,034 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Item #14, Costs to the Federal Government, |
|
|
|
Item #14, Costs to the Federal Government, Section 2 |
|
|
Item #14, Costs to the Federal Government, Section 3 |
|
Section |
Staff Time Hours |
Cost @ $300/hr |
|
|
|
|
Hours |
Cost @ $300/hr |
|
|
|
Hours |
Cost @ $300/hr |
|
|
|
|
|
|
|
Staff time |
101953 |
$30,585,900 |
|
|
Staff time |
1526 |
$457,800 |
|
2 |
101,953 |
$30,585,900 |
|
|
|
|
|
|
|
|
|
|
|
|
3 |
1,526 |
$457,800 |
|
|
|
|
|
|
|
|
|
|
|
|
4 |
41,295 |
$12,388,500 |
|
|
|
Total Burden and Responses Section 4 |
|
|
|
|
|
|
5 |
73,115 |
$21,934,500 |
|
|
|
|
Hours |
Responses |
|
|
Total Burden and Responses Section 5 |
|
|
|
6 |
2,250 |
$675,000 |
|
|
|
Reporting |
78,661 |
35,795 |
|
|
|
Hours |
Responses |
|
7 |
20,275 |
$6,082,500 |
|
|
|
Recordkeeping |
48,264 |
94 |
|
|
Reporting |
70,056 |
296 |
|
Total |
240,414 |
$72,124,200 |
|
|
|
TOTAL |
126,925 |
35,889 |
|
|
Recordkeeping |
1,405,251 |
119 |
|
|
|
|
|
|
|
|
|
|
|
|
Third Party Disclosure |
0 |
0 |
|
Burden Hours |
|
|
|
|
|
TOTAL |
1,475,307 |
415 |
|
Section |
Reporting |
Recordkeeping |
3rd Party |
Total |
Cost |
Item #13, Other Costs Section 4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping |
$5,792 |
|
|
|
|
|
|
|
2 |
748,749 |
242,107 |
0 |
990,856 |
$297,256,740 |
TOTAL |
$5,792 |
|
|
|
Item #13, Other Costs Section 5 |
|
|
|
3 |
4,167 |
8,619 |
0 |
12,786 |
$3,835,800 |
|
|
|
|
|
Recordkeeping |
$168,630 |
|
|
4 |
78,661 |
48,264 |
0 |
126,925 |
$38,077,598 |
|
|
|
|
|
TOTAL |
$168,630 |
|
|
5 |
70,056 |
1,405,251 |
0 |
1,475,307 |
$442,592,100 |
Item #14, Costs to the Federal Government, Section 4 |
|
|
|
|
|
|
|
|
6 |
9,720 |
1,085 |
0 |
10,805 |
$3,241,500 |
|
Hours |
Cost @ $300/hr |
|
|
|
|
|
|
7 |
716,106 |
381,622 |
0 |
1,097,727 |
$329,318,190 |
Staff time |
41295 |
$12,388,500 |
|
|
Item #14, Costs to the Federal Government, Section 5 |
|
Total |
1,627,459 |
2,086,947 |
0 |
3,714,406 |
$1,114,321,928 |
|
|
|
|
|
|
Hours |
Cost @ $300/hr |
|
Previous total |
1,184,556 |
2,448,598 |
200 |
3,633,354 |
$1,090,006,260 |
|
|
|
|
|
Staff time |
73,115 |
$21,934,500 |
|
Deltas |
442,904 |
-361,651 |
-200 |
81,053 |
$24,315,848 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Burden and Responses Section 6 |
|
|
|
|
Total Burden and Responses Section 7 |
|
|
|
|
|
|
|
|
Hours |
Responses |
|
|
|
Hours |
Responses |
|
Responses |
|
Reporting |
9,720 |
27 |
|
|
Reporting |
716,106 |
4,224 |
|
Section |
Reporting |
Recordkeeping |
3rd Party |
TOTAL |
|
Recordkeeping |
1,085 |
32 |
|
|
Recordkeeping |
381,622 |
158 |
|
|
|
|
|
|
|
TOTAL |
10,805 |
59 |
|
|
TOTAL |
1,097,727 |
4,382 |
|
2 |
2,297 |
162 |
0 |
2,459 |
|
|
|
|
|
|
|
|
|
|
3 |
55 |
169 |
0 |
224 |
|
|
|
|
|
|
|
|
|
|
4 |
35,795 |
94 |
0 |
35,889 |
|
Item #13, Other Costs Section 6 |
|
|
|
|
Item #13, Other Costs Section 7 |
|
|
|
5 |
296 |
119 |
0 |
415 |
|
Recordkeeping |
$130 |
|
|
|
Recordkeeping |
$45,795 |
|
|
6 |
27 |
32 |
0 |
59 |
|
TOTAL |
$130 |
|
|
|
TOTAL |
$45,795 |
|
|
7 |
4,224 |
158 |
0 |
4,382 |
|
|
|
|
|
|
|
|
|
|
2024 TOTAL |
42,694 |
169 |
0 |
42,863 |
|
|
|
|
|
|
|
|
|
|
Previous total |
42,025 |
164 |
2 |
42,191 |
|
Item #14, Costs to the Federal Government, Section 6 |
|
|
|
|
Item #14, Costs to the Federal Government, Section 7 |
|
|
|
Deltas |
669 |
5 |
-2 |
672 |
|
|
Hours |
Cost @ $300/hr |
|
|
|
Hours |
Cost @ $300/hr |
|
|
|
|
|
|
|
Staff time |
2,250 |
$675,000 |
|
|
Staff time |
20,275 |
$6,082,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
HOURS |
RESPONSES |
|
|
|
|
|
|
|
|
|
|
|
|
2024 |
3,714,406 |
42,863 |
|
|
|
|
|
|
|
|
|
|
|
|
Previous |
3,633,354 |
42,191 |
|
|
|
|
|
|
|
|
|
|
|
|
Delta |
81,052 |
672 |
|
|
|
|
|
|
|