U.S. DEPARTMENT OF COMMERCE
Economics and Statistics Administration

REPORTING INSTRUCTIONS FOR RESIDENTIAL
BUILDINGS CONTAINING 2 OR MORE HOUSING UNITS

U.S. CENSUS BUREAU
(8-4-2010)

FORM

C-700(R)

We estimate this survey will take an average of 30 minutes to complete for your first month of reporting and 10 minutes for
subsequent months, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the
data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of this voluntary collection of information, including suggestions for reducing this burden, to: EID CEB Survey
Comments 0607-0153, U.S. Census Bureau, 4600 Silver Hill Road, Room EID-7K081, Washington, DC 20233. You may email
comments to [email protected]. Be sure to use "EID CEB Survey Comments 0607-0153" as the subject.

CONSTRUCTION PROGRESS REPORTING SURVEY
MULTIFAMILY RESIDENTIAL
OMB No. 0607-0153: Approval Expires 02/28/2025

(03/07/2022)

In any correspondence pertaining to this report, refer to the ID.

DUE DATE:

RETURN TO:
▲

Section A – PROJECT IDENTIFICATION

Item 5a – Estimate the total amount to be paid to construction
contractors by the project owner for work done on this project.

Correct any information in items 1a and 1b if necessary.

Item 5b – Estimate the total cost of labor by the owner’s
construction employees working on the project, including
supervisory personnel assigned to the project. Include the total
cost of all construction materials supplied by the owner,
including those the owner expects to supply to the contractor for
installation in this project.

For the project described in item 1a to be eligible for this survey,
it must be privately owned during construction and involve
the erection of a new residential building(s) containing 2 or more
housing units. If the project is government owned during
construction or involves only remodeling, maintenance or
repairs, please note so in item 9, Remarks, complete item 2,
and return the form.

Item 5c – Sum of values reported in items 5a and 5b. This is the
value to be reported in item 8a, monthly value of construction
put in place.

If the project description does not include all the buildings and
units being worked on at this site, please change the description
to include them.

Item 6 – Estimate the total amount of fees which the project
owner has paid or will pay to architectural and engineering firms
for work on this project. Also estimate the total cost of all other
construction items which the project owner will allocate on the
books to this project. Include the project owner’s overhead and
office costs, interest and taxes paid during construction, the cost
of design work by the owner’s staff, and other miscellaneous
construction fees and costs allocated on the owner’s books. DO
NOT include the cost of land, furniture, and furnishings.

Exclude: Single-family homes/townhomes where: (1) each unit
is separated from adjoining units by a wall that extends from
ground to roof, (2) no unit is above or below another unit, and
(3) each unit has separate heating and separate utility meters.
If all of the units meet this definition of single-family homes/
townhomes please note so in item 9, Remarks, complete item 2,
and return the form.
▲

Section B – PERSON TO CONTACT REGARDING THIS
SURVEY
Item 2 – Enter or correct the information for the person who
can answer questions about this survey.

Item 7 – Intentionally left blank.
▲

▲

Section C – OWNERSHIP, START AND PROJECTED
COMPLETION DATES
Item 3 – As noted, this survey involves projects that are
privately owned during the construction phase. If the project
is government owned, check the appropriate box, note in item 9,
Remarks, complete item 2, and return the form.

Section E – MONTHLY CONSTRUCTION PROGRESS
REPORT
Item 8a – Report the monthly value of construction put in place
for the costs associated with item 5c. These costs include:
a. Work done by contractors and/or subcontractors, including
any retainage being withheld until the work is complete.
b. The cost of any materials installed which were provided by
the owner.
c. The work done by the project owner’s own construction
employees, including supervisory personnel assigned
to this project.

Item 4a – The start date is defined as the date that actual
construction work first began on the project described in
item 1a. If the project is to start at some future date, please enter
the date, complete item 2, and return the form.
Item 4b – The projected completion date is defined as the date
the project described in item 1a is expected to be completed.
▲

Initially, report monthly values from the start month to the most
current month shown in item 8a. Then each month, when the
form is returned to you, report for the month shown and any
revisions which you might have. When entering monthly data,
be sure to report the costs in the month in which the work was
done rather than in the month in which payment was made.
If the contractor’s bills are for periods other than monthly,
estimate a monthly amount. If costs are not available, please
leave the value blank. In each month where there is no
construction, enter a zero.

Section D – COST ESTIMATES
"Construction," for purposes of this survey, is defined as the
building of new fixed structures.
This INCLUDES:
a. The erecting of the structure.

Item 8b – If construction is complete except for some
minor work or retainage (up to 3 percent of item 5c), you
may stop reporting on this project by entering the completion
date in item 8b and indicating any remarks in item 9.

b. Mechanical and electrical installations – Plumbing,
heating, electrical work, elevators, escalators, central
air-conditioning, boilers, and other similar building services.
c. Outside construction – Clearing and grading of undeveloped
land and the fixed, auxiliary structures which the project
owner builds within the property lines to serve the major
building. Also, sidewalks, roadways, parking lots, utility
connections, outdoor lighting, swimming pools, and all
similar auxiliary facilities.

U.S. Census Bureau
1201 East 10th Street
Jeffersonville, IN 47132-0001

FAX:
1–800–845–8245

VIA INTERNET
OR FOR HELP:
econhelp.census.gov/cprs

Use your unique User ID
and original password.
User ID:
Password:
IMPORTANT
Please refer to the back of
this form for more information
and instructions for
completing the survey.

(Please correct any errors above)

NOTICE – Title 13 United States Code (U.S.C.), Sections 131 and 182, authorizes the Census Bureau to conduct this collection. The U.S. Census Bureau is required by Section 9
of the same law to keep your information confidential and can use your responses only to produce statistics. The Census Bureau is not permitted to publicly release your
responses in a way that could identify your business, organization, or institution. Per the Federal Cybersecurity Enhancement Act of 2015, your data are protected from
cybersecurity risks through screening of the systems that transmit your data. This collection has been approved by the Office of Management and Budget (OMB). The eight-digit
OMB approval number is 0607-0153 and appears at the upper right of this page. Without this approval, we could not conduct this survey. We estimate this survey will take an
average of 10-30 minutes to complete. More information about this estimate and an address where you may write with comments is on the back of this form.

Section A

PROJECT IDENTIFICATION - See instructions on the back of this form

The construction project described below is associated with your organization according to published
sources. Please correct any errors or fill in any blanks in Sections A and B. If necessary, make your
corrections in item 9, Remarks, or use a separate sheet. IF YOU HAVE ANY QUESTIONS CONCERNING THIS
FORM, PLEASE CALL 1–800–845–8246.
1a. PROJECT DESCRIPTION

Number of
housing units

Section B

1b. PROJECT LOCATION

Number of
buildings

PERSON TO CONTACT REGARDING THIS SURVEY – Please correct any errors below

2a. Name

b. Telephone

c. Fax

d. Email Address

e. Web Address

Continue with Section C on the next page
C-700(R) (03/07/2022)

4

Section C

OWNERSHIP, START AND PROJECTED COMPLETION DATES

Section E

MONTHLY CONSTRUCTION PROGRESS REPORT
This form will be returned to you EACH MONTH until the project is completed.

3. TYPE OF OWNERSHIP – Mark (X) one box.
Will this project be privately or government owned during construction?
Privately owned

Government owned - Please indicate any remarks in item 9 and return the form.
Month and year of actual
or expected start date

4a. START DATE OF CONSTRUCTION
When did actual construction work on the site start, or when do you
estimate it will start? Enter month and year.

Month and year of
expected completion date

4b. PROJECTED COMPLETION DATE
When do you estimate it will complete? Enter month and year.
Section D

• Continue with item 8a if project has started.
• Report the value of construction put in place each month.
Include only those construction costs defined in item 5c.
DO NOT include costs reported in item 6.
• Report costs in the month in which work was done
(including any monthly retainage being withheld from
contractors) rather than in the month in which payment was
made.
• If costs are not available, please leave the value blank.
• When project is completed, enter month and year in item 8b.

8a. MONTHLY VALUE OF CONSTRUCTION PUT IN
PLACE ON PROJECT DESCRIBED IN ITEM 1A

COST ESTIMATES

If construction is complete except for some minor
work or retainage (up to 3 percent of item 5c), you may
stop reporting on this project by entering the completion date
in item 8b and indicating any remarks in item 9.

INCLUDE
• Site preparation and outside construction, such as sidewalks and roadways
• Mechanical and electrical installations which are integral parts of the structures, such as elevators, heating equipment, etc.
EXCLUDE
• Land and pre-existing structures
• Architectural, engineering, and owner’s overhead and miscellaneous costs – See item 6
• Movable equipment, furniture, and furnishings
• Contingency funds
Construction costs
(Thousands of dollars)

NOTE: If project is on a "cost plus" basis, enter your best estimate of the final cost.

5a. CONTRACT CONSTRUCTION COST
(Amounts to be paid to contractors and subcontractors)

$

Value of construction put
in place during month
as defined in item 5c
(Thousands of dollars)

Month and year
report period

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

,000.00

5b. OWNER SUPPLIED MATERIALS AND LABOR
(Construction materials supplied by owner and the value of work done by project
owner’s own construction employees assigned to the project.)

$

,000.00

5c. TOTAL CONSTRUCTION COST
(Sum of 5a + 5b)

$

,000.00

6. ARCHITECTURAL, ENGINEERING, AND MISCELLANEOUS COSTS
INCLUDE
• All fees for architectural and engineering services. If contractor was authorized to "design and construct" this project,
such cost should be included in item 5a.
• Cost of design work by owner’s staff
• Project owner’s overhead and office costs
Architectural, engineering,
• Interest and taxes to be paid during construction
and miscellaneous costs
• Fees and other miscellaneous costs allocated on owner’s books to this project
(Thousands of dollars)

Month and year
of completion

8b. COMPLETION DATE
When was all construction actually completed? Enter month and year.

EXCLUDE
• Cost of land, furniture, and furnishings

$

,000.00

7. Intentionally left blank

9. REMARKS

Continue with Section E on the next page
C-700(R) (03/07/2022)

C-700(R) (03/07/2022)

2

3

Section C

OWNERSHIP, START AND PROJECTED COMPLETION DATES

Section E

MONTHLY CONSTRUCTION PROGRESS REPORT
This form will be returned to you EACH MONTH until the project is completed.

3. TYPE OF OWNERSHIP – Mark (X) one box.
Will this project be privately or government owned during construction?
Privately owned

Government owned - Please indicate any remarks in item 9 and return the form.
Month and year of actual
or expected start date

4a. START DATE OF CONSTRUCTION
When did actual construction work on the site start, or when do you
estimate it will start? Enter month and year.

Month and year of
expected completion date

4b. PROJECTED COMPLETION DATE
When do you estimate it will complete? Enter month and year.
Section D

• Continue with item 8a if project has started.
• Report the value of construction put in place each month.
Include only those construction costs defined in item 5c.
DO NOT include costs reported in item 6.
• Report costs in the month in which work was done
(including any monthly retainage being withheld from
contractors) rather than in the month in which payment was
made.
• If costs are not available, please leave the value blank.
• When project is completed, enter month and year in item 8b.

8a. MONTHLY VALUE OF CONSTRUCTION PUT IN
PLACE ON PROJECT DESCRIBED IN ITEM 1A

COST ESTIMATES

If construction is complete except for some minor
work or retainage (up to 3 percent of item 5c), you may
stop reporting on this project by entering the completion date
in item 8b and indicating any remarks in item 9.

INCLUDE
• Site preparation and outside construction, such as sidewalks and roadways
• Mechanical and electrical installations which are integral parts of the structures, such as elevators, heating equipment, etc.
EXCLUDE
• Land and pre-existing structures
• Architectural, engineering, and owner’s overhead and miscellaneous costs – See item 6
• Movable equipment, furniture, and furnishings
• Contingency funds
Construction costs
(Thousands of dollars)

NOTE: If project is on a "cost plus" basis, enter your best estimate of the final cost.

5a. CONTRACT CONSTRUCTION COST
(Amounts to be paid to contractors and subcontractors)

$

Value of construction put
in place during month
as defined in item 5c
(Thousands of dollars)

Month and year
report period

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

$

,000.00

,000.00

5b. OWNER SUPPLIED MATERIALS AND LABOR
(Construction materials supplied by owner and the value of work done by project
owner’s own construction employees assigned to the project.)

$

,000.00

5c. TOTAL CONSTRUCTION COST
(Sum of 5a + 5b)

$

,000.00

6. ARCHITECTURAL, ENGINEERING, AND MISCELLANEOUS COSTS
INCLUDE
• All fees for architectural and engineering services. If contractor was authorized to "design and construct" this project,
such cost should be included in item 5a.
• Cost of design work by owner’s staff
• Project owner’s overhead and office costs
Architectural, engineering,
• Interest and taxes to be paid during construction
and miscellaneous costs
• Fees and other miscellaneous costs allocated on owner’s books to this project
(Thousands of dollars)

Month and year
of completion

8b. COMPLETION DATE
When was all construction actually completed? Enter month and year.

EXCLUDE
• Cost of land, furniture, and furnishings

$

,000.00

7. Intentionally left blank

9. REMARKS

Continue with Section E on the next page
C-700(R) (03/07/2022)

C-700(R) (03/07/2022)

2

3

U.S. DEPARTMENT OF COMMERCE
Economics and Statistics Administration

REPORTING INSTRUCTIONS FOR RESIDENTIAL
BUILDINGS CONTAINING 2 OR MORE HOUSING UNITS

U.S. CENSUS BUREAU
(8-4-2010)

FORM

C-700(R)

We estimate this survey will take an average of 30 minutes to complete for your first month of reporting and 10 minutes for
subsequent months, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the
data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of this voluntary collection of information, including suggestions for reducing this burden, to: EID CEB Survey
Comments 0607-0153, U.S. Census Bureau, 4600 Silver Hill Road, Room EID-7K081, Washington, DC 20233. You may email
comments to [email protected]. Be sure to use "EID CEB Survey Comments 0607-0153" as the subject.

CONSTRUCTION PROGRESS REPORTING SURVEY
MULTIFAMILY RESIDENTIAL
OMB No. 0607-0153: Approval Expires 02/28/2025

(03/07/2022)

In any correspondence pertaining to this report, refer to the ID.

DUE DATE:

RETURN TO:
▲

Section A – PROJECT IDENTIFICATION

Item 5a – Estimate the total amount to be paid to construction
contractors by the project owner for work done on this project.

Correct any information in items 1a and 1b if necessary.

Item 5b – Estimate the total cost of labor by the owner’s
construction employees working on the project, including
supervisory personnel assigned to the project. Include the total
cost of all construction materials supplied by the owner,
including those the owner expects to supply to the contractor for
installation in this project.

For the project described in item 1a to be eligible for this survey,
it must be privately owned during construction and involve
the erection of a new residential building(s) containing 2 or more
housing units. If the project is government owned during
construction or involves only remodeling, maintenance or
repairs, please note so in item 9, Remarks, complete item 2,
and return the form.

Item 5c – Sum of values reported in items 5a and 5b. This is the
value to be reported in item 8a, monthly value of construction
put in place.

If the project description does not include all the buildings and
units being worked on at this site, please change the description
to include them.

Item 6 – Estimate the total amount of fees which the project
owner has paid or will pay to architectural and engineering firms
for work on this project. Also estimate the total cost of all other
construction items which the project owner will allocate on the
books to this project. Include the project owner’s overhead and
office costs, interest and taxes paid during construction, the cost
of design work by the owner’s staff, and other miscellaneous
construction fees and costs allocated on the owner’s books. DO
NOT include the cost of land, furniture, and furnishings.

Exclude: Single-family homes/townhomes where: (1) each unit
is separated from adjoining units by a wall that extends from
ground to roof, (2) no unit is above or below another unit, and
(3) each unit has separate heating and separate utility meters.
If all of the units meet this definition of single-family homes/
townhomes please note so in item 9, Remarks, complete item 2,
and return the form.
▲

Section B – PERSON TO CONTACT REGARDING THIS
SURVEY
Item 2 – Enter or correct the information for the person who
can answer questions about this survey.

Item 7 – Intentionally left blank.
▲

▲

Section C – OWNERSHIP, START AND PROJECTED
COMPLETION DATES
Item 3 – As noted, this survey involves projects that are
privately owned during the construction phase. If the project
is government owned, check the appropriate box, note in item 9,
Remarks, complete item 2, and return the form.

Section E – MONTHLY CONSTRUCTION PROGRESS
REPORT
Item 8a – Report the monthly value of construction put in place
for the costs associated with item 5c. These costs include:
a. Work done by contractors and/or subcontractors, including
any retainage being withheld until the work is complete.
b. The cost of any materials installed which were provided by
the owner.
c. The work done by the project owner’s own construction
employees, including supervisory personnel assigned
to this project.

Item 4a – The start date is defined as the date that actual
construction work first began on the project described in
item 1a. If the project is to start at some future date, please enter
the date, complete item 2, and return the form.
Item 4b – The projected completion date is defined as the date
the project described in item 1a is expected to be completed.
▲

Initially, report monthly values from the start month to the most
current month shown in item 8a. Then each month, when the
form is returned to you, report for the month shown and any
revisions which you might have. When entering monthly data,
be sure to report the costs in the month in which the work was
done rather than in the month in which payment was made.
If the contractor’s bills are for periods other than monthly,
estimate a monthly amount. If costs are not available, please
leave the value blank. In each month where there is no
construction, enter a zero.

Section D – COST ESTIMATES
"Construction," for purposes of this survey, is defined as the
building of new fixed structures.
This INCLUDES:
a. The erecting of the structure.

Item 8b – If construction is complete except for some
minor work or retainage (up to 3 percent of item 5c), you
may stop reporting on this project by entering the completion
date in item 8b and indicating any remarks in item 9.

b. Mechanical and electrical installations – Plumbing,
heating, electrical work, elevators, escalators, central
air-conditioning, boilers, and other similar building services.
c. Outside construction – Clearing and grading of undeveloped
land and the fixed, auxiliary structures which the project
owner builds within the property lines to serve the major
building. Also, sidewalks, roadways, parking lots, utility
connections, outdoor lighting, swimming pools, and all
similar auxiliary facilities.

U.S. Census Bureau
1201 East 10th Street
Jeffersonville, IN 47132-0001

FAX:
1–800–845–8245

VIA INTERNET
OR FOR HELP:
econhelp.census.gov/cprs

Use your unique User ID
and original password.
User ID:
Password:
IMPORTANT
Please refer to the back of
this form for more information
and instructions for
completing the survey.

(Please correct any errors above)

NOTICE – Title 13 United States Code (U.S.C.), Sections 131 and 182, authorizes the Census Bureau to conduct this collection. The U.S. Census Bureau is required by Section 9
of the same law to keep your information confidential and can use your responses only to produce statistics. The Census Bureau is not permitted to publicly release your
responses in a way that could identify your business, organization, or institution. Per the Federal Cybersecurity Enhancement Act of 2015, your data are protected from
cybersecurity risks through screening of the systems that transmit your data. This collection has been approved by the Office of Management and Budget (OMB). The eight-digit
OMB approval number is 0607-0153 and appears at the upper right of this page. Without this approval, we could not conduct this survey. We estimate this survey will take an
average of 10-30 minutes to complete. More information about this estimate and an address where you may write with comments is on the back of this form.

Section A

PROJECT IDENTIFICATION - See instructions on the back of this form

The construction project described below is associated with your organization according to published
sources. Please correct any errors or fill in any blanks in Sections A and B. If necessary, make your
corrections in item 9, Remarks, or use a separate sheet. IF YOU HAVE ANY QUESTIONS CONCERNING THIS
FORM, PLEASE CALL 1–800–845–8246.
1a. PROJECT DESCRIPTION

Number of
housing units

Section B

1b. PROJECT LOCATION

Number of
buildings

PERSON TO CONTACT REGARDING THIS SURVEY – Please correct any errors below

2a. Name

b. Telephone

c. Fax

d. Email Address

e. Web Address

Continue with Section C on the next page