Document
Burden Tables 1053.14
ICR 202412-2060-001 · OMB 2060-0023 · Object 150444100.
Document Viewer [xlsx]
Document Metadata
| File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
|---|---|
| File Title | Burden Tables 1053.14 |
| Author | Denise Bevington |
| Last Modified By | Calc |
| File Modified | 2024-11-19 |
| File Created | 2026-10-12 |
| Conversion State | complete |
Extracted Text
ICR Summary Information Hours per Response 97 Number of Respondents 732 Total Estimated Burden Hours 171,000 Total Estimated Costs $37,100,000 Annualized Capital O&M $15,600,000 Total Annual Responses 1756 Form Number Not Applicable Table 1: Annual Respondent Burden and Cost – NSPS for Electric Utility Steam Generating Units (40 CFR P Burden Item 1. Applications 2. Survey and Studies 3. Reporting requirements A. Familiarize with regulatory requirements c B. Required activities Initial emissions tests Reference Method 9 Repeat performance test d C. Create information D. Gather existing information (A) Person hours per occurrence (B) No. of occurrences per respondent per year (C) (D) Person hours Respondents per per year a respondent per year (C=AxB) N/A N/A 1 1 1 732 160 4 60 See 3B See 3E 1 30 0.2 160 120 12 0 0 0 Notification of construction/reconstruction 2 1 2 0 Notification of actual startup 2 1 2 0 Notification of initial performance test 2 1.2 2.4 0 Notification of demonstration of CMS 2 1 2 0 2 4 16 32 586 146 365 182.5 732 E. Write report Report of performance test Semiannual report Quarterly report f Subtotal for Reporting Requirements 4. Recordkeeping requirements A. Familiarize with regulatory requirements B. Plan activities Implement activities e Develop record system C. Time to check computer system and calibrate continuous monitor g D. Train personnel E. Audits Subtotal for Recordkeeping Requirements TOTAL LABOR BURDEN AND COSTS (rounded) h TOTAL CAPITAL AND O&M COST (rounded) h GRAND TOTAL (rounded) h Assumptions: See 3B 8 8 See 3A See 4C See 3B N/A 0.5 N/A N/A a We have assumed that there are an average of 732 existing respondents subject to the rule and no new sources that will become subject to t This ICR uses the following labor rates: Managerial $163.17 ($77.70 + 110%); Technical $130.28 ($62.04 + 110%); and Clerical $65.71 ( United States Department of Labor, Bureau of Labor Statistics, September 2022, “Table 2. Civilian Workers, by occupational and industry g compensation.” The rates have been increased by 110 percent to account for varying industry wage rates and the additional overhead busine wages and benefits, including business expenses associated with hiring, training, and equipping their employees. b We have assumed that all respondents will have to familiarize with the regulatory requirements each year. We have assumed that 20 percent of initial performance tests will be repeated due to failure. e We have assumed that 80 percent of respondents will each take 8 hours two times per year to write the semiannual report. f We have assumed that 20 percent of respondents will each take 8 hours four times per year to write the quarterly report. g We have assumed that each respondent will take 30 minutes each day to check computer system and calibrate continuous monitors. h Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. c d rating Units (40 CFR Part 60, Subpart Da) (Renewal) (E) (F) (G) Technical Management Clerical person- hours person hours person hours per year per year per year (E=CxD) (Ex0.05) (Ex0.1) (H) Cost, $ b 732 36.6 73.2 $106,146.95 0 0 0 0 0 0 0 0 0 $0.00 $0.00 $0.00 0 0 0 $0.00 0 0 0 $0.00 0 0 0 $0.00 0 0 0 $0.00 9,370 4,685 468 234 17,004 937 468 $1,358,681.01 $679,340.51 $2,144,168 133,590 6,680 13,359 $19,371,819.11 153,629 $19,371,819 171,000 $21,500,000 $15,600,000 $37,100,000 Labor Rates Management $163.17 Technical $130.28 Clerical $65.71 s that will become subject to the rule over the three-year period of this ICR. 110%); and Clerical $65.71 ($31.29 + 110%). These rates are from the by occupational and industry group.” The rates are from column 1, “Total he additional overhead business costs of employing workers beyond their es. nnual report. erly report. e continuous monitors. 97 hr/response Table 2: Average Annual EPA Burden and Cost – NSPS for Electric Utility Steam Generating Units (40 CFR P Burden item Performance tests New plants Review startup report c Report Review Notification of construction/reconstruction Notification of actual startup Notification of initial test Notification of CMS demonstration Review excess emissions reports Semiannual d Quarterly e (A) Person hours per occurrence (B) (C) (D) No. of Person hours Respondents occurrences per respondent per year a per respondent per year per year (C=AxB) 24 40 1.2 1.2 28.8 48 0 0 2 1 2 0 0.5 1 0.5 0 0.5 0.5 1.2 1 0.6 0.5 0 0 8 8 2 4 16 32 586 146 TOTAL (rounded) f Assumptions: a We have assumed that there are an average of 732 existing respondents subject to the rule and no new sources that will become subject to t This cost is based on the average hourly labor rate as follows: Managerial $73.46 (GS-13, Step 5, $45.91 + 60%); Technical $54.51 (GS-1 (GS-6, Step 3, $18.44 + 60%). These rates are from the Office of Personnel Management (OPM), 2023 General Schedule, which excludes lo increased by 60 percent to account for the benefit packages available to government employees. c We have assumed that it will take 40 hours to review each startup report. d We have assumed that it will take 8 hours two times per year to review each semiannual report. b e f We have assumed that it will take 8 hours four times per year to review each the quarterly report. Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. rating Units (40 CFR Part 60, Subpart Da) (Renewal) (E) Technical person- hours per year (E=CxD) (F) (G) Management Clerical person person hours hours per year per year (Ex0.1) (Ex0.05) (H) Cost, $ b 0 0 0 0 0 0 $0 $0 0 0 0 $0 0 0 0 $0 0 0 0 0 0 0 $0 $0 9,370 4,685 468.48 234.24 936.96 468.48 16,200 $572,792 $286,396 $859,000 that will become subject to the rule over the three-year period of this ICR. %); Technical $54.51 (GS-12, Step 1, $34.07 + 60%); and Clerical $29.50 Schedule, which excludes locality rates of pay. The rates have been Labor Rates Management $73.46 Technical $54.51 Clerical $29.50 (A) Capital/Startup vs. Operation and Maintenance (O&M) Costs (B) (C) (D) (E) Capital/Startup Cost Total Continuous Monitoring Number of New for One Respondent Capital/Startup Device Respondents a Cost, (B X C) SO2, PM, and NOx Total (rounded) b $283,629 0 $0 $0 (F) Annual O&M Costs for One Respondent a Number of Respondents with O&M $21,272 732 Assumptions a Costs have been increased from 2008 to 2022 $ using the CEPCI Equipment Cost Index. b Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. (G) Total O&M, (E X F) $15,571,220 $15,600,000 $15,600,000 Total Annual Responses (A) (C) (D) (E) Number of Respondents a Number of Responses Number of Existing Respondents That Keep Records But Do Not Submit Reports Total Annual Responses E=(BxC)+D Notification of construction/ reconstruction 0 1 0 0 Notification of actual startup 0 1 0 0 Notify of initial performance test 0 1.2 0 0 Notification of demonstration of CMS 0 1 0 0 Semiannual report 586 2 0 1,172 Quarterly report 146 4 0 584 Total 1,756 Information Collection Activity (B) Number of Respondents Respondents That Submit Reports (A) Year a Number of New Respondents a Respondents That Do Not Submit Any Reports (B) (C) Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports 1 0 732 0 2 0 732 0 3 0 732 0 Average 0 732 0 New respondents include sources with constructed and reconstructed affected facilities. ts (D) (E) Number of Existing Number of Respondents That Are Respondents Also New (E=A+B+C-D) Respondents 0 732 0 732 0 732 0 732