Burden Calculations Table

1057t16.xlsx

NSPS for Sulfuric Acid Plants (40 CFR Part 60, Subpart H) (Renewal)

Burden Calculations Table

OMB: 2060-0041

Document [xlsx]
Download: xlsx | pdf

Overview

Summary
Table 1
Table 2
Capital O&M
Responses
Respondents


Sheet 1: Summary

ICR Summary Information
Hours per Response 127
Number of Respondents 53
Total Estimated Burden Hours 13,500
Total Estimated Costs $2,110,000
Annualized Capital O&M $416,000
Total Annual Responses 106
Form Number Not Applicable

Sheet 2: Table 1

Table 1: Annual Respondent Burden and Cost – NSPS for Sulfuric Acid Plants (40 CFR Part 60, Subpart H) (Renewal)














Burden item (A)
Person hours per occurrence
(B)
No. of occurrences per respondent per year
(C)
Person hours per respondent per year
(C = A x B)
(D)
Respondents per year a
(E)
Technical person- hours per year
(E = C x D)
(F)
Management person hours per year
(E x 0.05)
(G)
Clerical person hours per year
(E x 0.1)
(H)
Total Cost Per year b



1. Applications N/A







Labor Rates
2. Survey and Studies N/A







Management $163.17
3. Reporting requirements








Technical $130.28
A. Familiarization with rule requirements c 1 1 1 53 53 2.65 5.3 $7,685.50
Clerical $65.71
B. Required activities










Initial performance tests d 300 1 300 0 0 0 0 $0


Reference Method 9 test e 4 1 4 0 0 0 0 $0


Repeat of performance tests f 300 1 300 0 0 0 0 $0


C. Create information See 3B









D. Gather existing information See 3B









E. Write Report










Application of construction or modification 2 1 2 0 0 0 0 $0


Notification of actual startup 2 1 2 0 0 0 0 $0


Notification of physical or operational change 2 1 2 0 0 0 0 $0


Notification of demonstration of CMS 2 1 2 0 0 0 0 $0


Notification of initial performance test 2 1 2 0 0 0 0 $0


Semiannual report of excess emissions g 40 2 80 53 4,240 212 424 $614,840.28


Subtotal for Reporting Requirements 4,937 $622,526


4. Recordkeeping requirements










A. Familiarization with rule requirements See 3A









B. Plan activities See 3A









C. Implement Activities See 3A









D. Develop record system N/A









E. Time to enter information










Records of operating parameters h 0.25 350 87.5 53 4637.5 231.88 463.75 $672,481.56


Record of conversion factors/calculation i 0.05 1,050 52.5 53 2782.5 139.13 278.25 $403,488.93


F. Time to train personnel N/A









G. Time for audits N/A









Subtotal for Recordkeeping Requirements 8,533 $1,075,970


Total Labor Burden and Costs (rounded) j



13,500 $1,700,000
Responses 106
Total Capital and O&M Cost (rounded) j






$416,000
Hours/response 127
GRAND TOTAL (rounded) j 13,500 $2,110,000














Assumptions:










a We have assumed that there are approximately 53 respondents, with no additional new or reconstructed sources becoming subject to the rule over the next three years.


b This ICR uses the following labor rates: Managerial $163.17 ($77.70 + 110%); Technical $130.28 ($62.04 + 110%); and Clerical $65.71 ($31.29 + 110%). These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2022, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees.


c We have assumed that it will take one hour for each respondent to read instructions.


d We have assumed that it will take 300 hours for each respondent to complete an initial performance test.


e We have assumed that it will take four hours for each respondent to complete a reference Method 9 test.


f We have assumed that it will take 300 hours to repeat performance test due to failures.


g We have assumed that it will take 40 hours, twice a year, for each respondent to write an excess emission report.


h We have assumed that each respondent will enter information on records of operating parameters 350 times per year.


i We have assumed that records of conversion factors will be recorded three times daily, at 350 days per year, for a total of 3 x 350 = 1,050 times per year.


j Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.



Sheet 3: Table 2

Table 2: Average Annual EPA Burden and Cost - NSPS for Sulfuric Acid Plants (40 CFR Part 60, Subpart H) (Renewal)














Activity (A) (B) (C) (D) (E) (F) (G) (H)


EPA person- hours per occurrence No. of occurrences per plant per year EPA person- hours per plant per year (C=AxB) Plants per year a Technical person- hours per year (E=CxD) Management person-hours per year (Ex0.05) Clerical person-hours per year (Ex0.1) Cost, $ b


New facility








Labor Rates
Initial performance test c 50 1 50 0 0 0 0 $0
Management $73.46
Repeat performance test/observed d 24 1 24 0 0 0 0 $0
Technical $54.51
Review reports








Clerical $29.50
Notification of construction 2 1 2 0 0 0 0 $0


Notification of actual startup 0.5 1 0.5 0 0 0 0 $0


Notification of initial test 0.5 1.2 0.6 0 0 0 0 $0


Review test results 8 1.2 9.6 0 0 0 0 $0


Notification of CMS demonstration 0.5 1 0.5 0 0 0 0 $0


Existing facility 0.5 1 0.5 0 0 0 0 $0


Excess emission reports e 4 2 8 53 424 21.2 42.4 $25,920.39


TOTAL (rounded) f 488 $25,900














Assumptions:










a We have assumed that there are approximately 53 respondents, with no additional new or reconstructed sources becoming subject to the rule over the next three years.


b This cost is based on the average hourly labor rate as follows: Managerial $73.46 (GS-13, Step 5, $45.91 + 60%); Technical $54.51 (GS-12, Step 1, $34.07 + 60%); and Clerical $29.50 (GS-6, Step 3, $18.44 + 60%). This ICR assumes that Managerial hours are 5 percent of Technical hours, and Clerical hours are 10 percent of Technical hours. These rates are from the Office of Personnel Management (OPM), 2023 General Schedule, which excludes locality, rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.


c We have assumed that it will take fifty hours for Agency observation of the initial performance test.


d We have assumed that it will take twenty-four hours for Agency observation of a repeat of the performance test due to failure.


e We have assumed that it will take four hours, twice per year, to review the excess emission reports.


f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.



Sheet 4: Capital O&M

Capital/Startup vs. Operation and Maintenance (O&M) Costs


(A) (B) (C) (D) (E) (F) (G)


Continuous Monitoring Device Capital/Startup Cost for One Respondent a Number of New Respondents Total Capital/Startup Cost, (B X C) Annual O&M Costs for One Respondent a Number of Respondents with O&M Total O&M, (ExF)
CEPCI Index
CMS $209,141 0 $0 $7,843 53 $415,669
Year Index
SO2 testing $13,943 0 $0 $0 0 $0
2005 468.2
Total b

$0

$416,000
2022 816
a Capital/Startup and Annual O&M costs have been increased from 2005 to 2022 $ using the CEPCI Index.


b Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.

Sheet 5: Responses

Total Annual Responses
(A) (B) (C) (D) (E)
Information Collection Activity Number of Respondents Number of Responses Number of Existing Respondents That Keep Records But Do Not Submit Reports Total Annual Responses E=(BxC)+D
Notification of construction or modification 0 1 0 0
Notification of actual startup 0 1 0 0
Notification of physical or operational change 0 1 0 0
Notification of demonstration of CMS 0 1 0 0
Notification of initial performance test 0 1 0 0
Semiannual report of excess emissions 53 2 0 106



Total 106

Sheet 6: Respondents

Number of Respondents

Respondents That Submit Reports Respondents That Do Not Submit Any Reports

(A) (B) (C) (D) (E)
Year Number of New Respondents a Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents That Are Also New Respondents Number of Respondents (E=A+B+C-D)
1 0 53 0 0 53
2 0 53 0 0 53
3 0 53 0 0 53
Average 0 53 0 0 53
a New respondents include sources with constructed, reconstructed, and modified affected facilities.




File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2025 OMB.report | Privacy Policy