Burden Calculations Table

1284t13.xlsx

NSPS for Polymeric Coating of Supporting Substrates Facilities (40 CFR Part 60, Subpart VVV) (Renewal)

Burden Calculations Table

OMB: 2060-0181

Document [xlsx]
Download: xlsx | pdf

Overview

Summary
Table 1
Table 2
Capital O&M
Responses
Respondents


Sheet 1: Summary

ICR Summary Information
Hours per Response 79
Number of Respondents 77
Total Estimated Burden Hours 16,900
Total Estimated Costs $3,330,000
Annualized Capital O&M $1,200,000
Total Annual Responses 214
Form Number Not Applicable

Sheet 2: Table 1

Table 1: Annual Respondent Burden and Cost – NSPS for Polymeric Coating of Supporting Substrates Facilities (40 CFR Part 60, Subpart VVV) (Renewal)






















Burden Item (A)
Person hours per occurrence
(B)
No. of occurrences per respondent per year
(C)
Person hours per respondent per year
(C=AxB)
(D)
Respondents per year a
(E)
Technical person hours per year (E=CxD)
(F)
Management person hours per year (Ex0.05)
(G)
Clerical person hours per year (Ex0.1)
(H)
Cost, $ b



1. Applications N/A    





Labor Rates
2. Surveys and studies N/A    





Management $163.17
3. Reporting requirements      





Technical $130.28
A. Familiarize with the regulatory requirements c 1 1 1 77 77 3.85 7.7 $11,165.73
Clerical $65.71
B. Required activities










Initial performance test 280 1 280 5 1400 70 140 $203,013.30


Repeat performance test d 280 1 280 1 280 14 28 $40,602.66


Monthly compliance test e 90 12 1080 1 1080 54 108 $156,610.26


C. Create information See 3B









D. Gather existing information See 3E









E. Write report










Notification of construction/ reconstruction 2 1 2 5 10 0.5 1 $1,450.10


Notification of actual startup 2 1 2 5 10 0.5 1 $1,450.10


Notification of initial performance test 2 1 2 5 10 0.5 1 $1,450.10


Notification of VOC use at end of initial year f 2 1 2 1 2 0.1 0.2 $290.02


Report of performance test See 3B









Report of monitoring exceedances and non-compliance periods g 16 4 64 15 960 48 96 $139,209.12


Report of no excess emissions h 8 2 16 62 992 49.6 99.2 $143,849.42


Report when 1st projected VOC use exceeds cutoff 2 1 2 2 4 0.2 0.4 $580.04


Report when 1st actual 12-month VOC use exceeds cutoff i 2 1 2 0 0 0 0 $0


Notification of changes j 4 1 4 5 20 1 2 $2,900.19


Subtotal for Reporting Requirements 5,572 $702,571


4. Recordkeeping requirements










A. Read instructions See 3A  
       



B. Plan activities See 3B  
       



C. Implement activities See 3B  
       



D. Develop record system N/A  
       



E. Time to enter information    
       



Records of startups, shutdowns, malfunctions, etc. k 1.5 25 37.5 77 2887.5 144.375 288.75 $418,714.93


Records of operating parameters l 0.25 350 87.5 77 6,737.50 336.875 673.75 $977,001.51


Records of semiannual projected VOC use estimate m 1 2 2 15 30 1.5 3 $4,350.29


Records of 12-month actual VOC use m 1 12 12 15 180 9 18 $26,101.71


F. Train personnel N/A            



G. Audits N/A            



Subtotal for Recordkeeping Requirements
11,310 $1,426,168
79 hr/response
Total Labor Burden and Costs (rounded) n
16,900 $2,130,000


Total Capital and O&M Cost (rounded) n
$1,200,000


GRAND TOTAL (rounded) n
$3,330,000














Assumptions:










a On average, EPA estimates 76 existing plants and one new plant per year will be subject to the NSPS over the next 3 years. This ICR assumes 4 existing plants per year will install new coating lines.


b This ICR uses the following labor rates: Managerial $163.17 ($77.70 + 110%); Technical $130.28 ($62.04 + 110%); and Clerical $65.71 ($31.29 + 110%). These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2022, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees.


c This ICR assumes it will take each facility 1 hour per year to familiarize with regulatory requirements.


d This ICR assumes 20 percent of initial performance tests must be repeated due to failure (5 × 20% = 1).


e This ICR assumes one coating line per year will demonstrate compliance by the liquid material balance method, which requires monthly compliance testing.


f This ICR assumes one plant per year will be required to submit this notification.


g This ICR assumes 20 percent of existing and new plants will report monitoring exceedances or non-compliance periods on a quarterly basis (77×20% = 15, after rounding). These plants will comply though either the emission reduction, alternative, or coating mix preparation equipment standards.


h This ICR assumes 80 percent of existing and new plants will report no excess emissions (77×80% = 62, after rounding).


i This ICR assumes no coating lines at any existing or new plants will exceed the cutoff value.


j This burden applies to new plants and existing plants that modify or reconstruct coating operations or coating mix preparation equipment. Per footnote a, EPA estimates one new plant per year and 4 existing plants with new coating lines per year.


k This ICR assumes there will be one malfunction or shutdown every 2 weeks over 50 weeks per year, or 25 occurrences per year (50/2 = 25).


l This ICR assumes operating parameters will be recorded over 350 days per year.


m This assumes 20 percent of existing and new plants will record VOC use estimates (77×20% = 15, after rounding).


n Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.



Sheet 3: Table 2

Table 2: Annual Respondent Burden and Cost – NSPS for Polymeric Coating of Supporting Substrates Facilities (40 CFR Part 60, Subpart VVV) (Renewal)






















Burden item (A)
Person hours per occurrence
(B)
No. of occurrences per respondent per year
(C)
Person hours per respondent per year (C=AxB)
(D)
Respondents per year a
(E)
Technical person- hours per year (E=CxD)
(F)
Management person hours per year (Ex0.05)
(G)
Clerical person hours per year (Ex0.1)
(H)
Cost, $ b



New facilities








Labor Rates
Notification of construction/ reconstruction 2 1 2 5 10 0.5 1 $611.33
Management $73.46
Notification of actual startup 2 1 2 5 10 0.5 1 $611.33
Technical $54.51
Notification of initial performance test 2 1 2 5 10 0.5 1 $611.33
Clerical $29.50
Notification of VOC use at end of initial year 2 1 2 1 2 0.1 0.2 $122.27


Performance test results 8 1 8 5 40 2 4 $2,445.32


New and existing facilities    








Report of monitoring exceedances and non-compliance periods c 8 4 32 15 492.8 24.64 49.28 $30,126.34


Report of no excess emissions d 2 2 4 62 246.4 12.32 24.64 $15,063.17


Report when 1st projected VOC use exceeds cutoff 2 1 2 2 4 0.2 0.4 $244.53


Report when 1st actual 12-month VOC use exceeds cutoff e 2 1 2 0 0 0.0 0 $0


Notification of changes f 2 1 2 5 10 0.5 1 $611.33


TOTAL (rounded) g
950 $50,400






Assumptions:


a On average, EPA estimates 76 existing plants and one new plant per year will be subject to the NSPS over the 3-year period of this ICR. This ICR assumes 4 existing plants per year will install new coating lines.


b This ICR uses the following labor rates: Managerial, $73.46 (GS-13, Step 5, $45.91 + 60%); Technical, $54.51 (GS-12, Step 1, $34.07 + 60%); and Clerical $29.50 (GS-6, Step 3, $18.44 + 60%). These rates are from the Office of Personnel Management (OPM), 2023 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.


c This ICR assumes 20 percent of existing and new plants will report monitoring exceedances or non-compliance periods on a quarterly basis (77×20% = 15, after rounding). These plants will comply though either the emission reduction, alternative, or coating mix preparation equipment standards.


d This ICR assumes 80 percent of existing and new plants will report no excess emissions (77×80% = 62, after rounding).


e This ICR assumes no coating lines at any existing or new plants will exceed the cutoff value.


f This burden applies to new plants and existing plants that modify or reconstruct coating operations or coating mix preparation equipment. Per footnote a, EPA estimates one new plant per year and 4 existing plants with new coating lines per year.


g Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.



Sheet 4: Capital O&M

Capital/Startup vs. Operation and Maintenance (O&M) Costs 



(A) (B) (C) (D) (E) (F) (G)



Continuous Monitoring Device Capital/Startup Cost for One Respondent Number of New Respondents Total Capital/Startup Cost, (B X C) Annual O&M Costs for One Respondent Number of Respondents with O&M Total O&M,
(E X F)


2008 CEPCI 2022 CEPCI
VOC Monitor $56,726 1 $56,726 $12,054 76 $916,121

575.4 816
Temperature Monitor $12,054 1 $12,054 $2,836 76 $215,558



Totals (rounded) a

$68,800

$1,130,000
$1,200,000












a Totals have been rounded to 3 significant digits. Figures may not add exactly due to rounding.



b Costs have been increased from 2008 to 2022 $ using the CEPCI Equipment Cost Index.




Sheet 5: Responses

Total Annual Responses
(A) (B) (C) (D) (E)
Information Collection Activity Number of Respondents Number of Responses Number of Existing Respondents That Keep Records But Do Not Submit Reports Total Annual Responses E=(BxC)+D
Notification of construction/ reconstruction 5 1 0 5
Notification of actual startup 5 1 0 5
Notification of initial performance test 5 1 0 5
Notification of VOC use at end of initial year 1 1 0 1
Report of performance test 5 1 0 5
Report of repeat performance test 1 1 0 1
Report of monitoring exceedances and non-compliance periods 15.4 4 0 61.6
Report of no excess emissions 61.6 2 0 123.2
Report when 1st projected VOC use exceeds cutoff 2 1 0 2
Report when 1st actual 12-month VOC use exceeds cutoff 0 1 0 0
Notification of changes 5 1 0 5



Total 214






Sheet 6: Respondents

Number of Respondents

Respondents That Submit Reports Respondents That Do Not Submit Any Reports

(A) (B) (C) (D) (E)
Year Number of New Respondents a Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents That Are Also New Respondents Number of Respondents (E=A+B+C-D)
1 5 75 0 4 76
2 5 76 0 4 77
3 5 77 0 4 78
Average 5 76 0 4 77
a New respondents include sources with constructed and reconstructed affected facilities.