NSPS for Portland Cement Plants (40 CFR part 60, subpart F) (Renewal)

ICR 202412-2060-008

OMB: 2060-0025

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2024-12-17
Supporting Statement A
2024-12-17
IC Document Collections
ICR Details
2060-0025 202412-2060-008
Received in OIRA 202107-2060-003
EPA/OAR 1051.16
NSPS for Portland Cement Plants (40 CFR part 60, subpart F) (Renewal)
Extension without change of a currently approved collection   No
Regular 12/27/2024
  Requested Previously Approved
36 Months From Approved 12/31/2024
198 198
14,100 14,100
1,040,000 744,000

The New Source Performance Standards (NSPS) for Portland Cement Plants (40 CFR Part 60, Subpart F) were promulgated on December 23, 1971; and amended on both February 12, 2013, and July 27, 2015. These regulations apply to existing and new kilns, clinker coolers, raw mill systems, raw mill dryers, raw material storage, clinker storage, finished product storage, conveyor transfer points, bagging and bulk loading and unloading systems at portland cement plants. New facilities include those that commenced construction, modification, or reconstruction after the date of proposal. This information is being collected to assure compliance with 40 CFR Part 60, Subpart F. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NSPS.

US Code: 42 USC 7401 et.seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  88 FR 31748 05/18/2023
89 FR 103824 12/19/2024
No

1
IC Title Form No. Form Name
NSPS for Portland Cement Plants (40 CFR part 60, subpart F)

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 198 198 0 0 0 0
Annual Time Burden (Hours) 14,100 14,100 0 0 0 0
Annual Cost Burden (Dollars) 1,040,000 744,000 0 0 296,000 0
No
No

$47,300
No
    No
    No
No
No
No
No
Muntasir Ali 919 541-0833

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
12/27/2024