FERC-725 (OMB Control No. 1902-0225)
(Renewal in Docket No. IC25-3-000)
Also addressing non-substantive changes for RD24-6, RD24-7, and RM24-4.
Supporting Statement for
FERC-725, Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards
The Federal Energy Regulatory Commission (Commission or FERC) requests that the Office of Management and Budget (OMB) review and approve FERC-725 (Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards) for a three-year period. FERC-725 (OMB Control No. 1902-0225) is an existing Commission data collection, as stated by Title 18 Code of Federal Regulations (CFR), Part 39. The reporting and recordkeeping requirements are not changing. This submission also includes three non-substantive changes addressing RD24-6, RD24-7, and RM24-4 (Mentioned in section #2 below).
.
CIRCUMSTANCES THAT MAKE THE COLLECTION OF INFORMATION NECESSARY
The Energy Policy Act of 2005 added section 215 to the Federal Power Act (FPA),1 enhancing the Commission’s ability to strengthen the reliability of the interstate electric grid. Section 215 of the FPA aids the Commission’s efforts to strengthen the reliability of the interstate grid by granting authority to provide for a system of mandatory Reliability Standards developed by the Electric Reliability Organization (ERO) and reviewed and approved by FERC.
On February 3, 2006, the Commission issued Order No. 6722 certifying a single ERO [the North American Electric Reliability Corporation (NERC)], to oversee the reliability of the United States’ portion of the interconnected North American Bulk-Power System, subject to Commission oversight. The ERO is responsible for developing and enforcing the mandatory Reliability Standards. The Reliability Standards apply to all users, owners, and operators of the Bulk-Power System.
The Commission has the authority to approve all ERO actions, to order the ERO to carry out its responsibilities under these statutory provisions, and (as appropriate) to enforce Reliability Standards. The ERO can delegate its enforcement responsibilities to a Regional Entity. Delegation is effective only after the Commission approves the delegation agreement. A Regional Entity can also propose a Reliability Standard to the ERO for submission to the Commission for approval.
(More information on FERC’s Electric Reliability program is posted at https://www.ferc.gov/industries/electric/indus-act/reliability.asp .)
HOW, BY WHOM AND FOR WHAT PURPOSE IS THE INFORMATION TO BE USED AND THE CONSEQUENCES OF NOT COLLECTING THE INFORMATION
The FERC-725 contains the following information collection elements:
Self-Assessment and ERO (Electric Reliability Organization) Application: The Commission requires the ERO to submit to FERC a performance assessment report every five years. The next assessment is due in 2025. Each Regional Entity submits a performance assessment report to the ERO.
Submitting an application to become the ERO is also part of this collection.3
Reliability Assessments: 18 CFR 39.11 requires the ERO to assess the reliability and adequacy of the Bulk-Power System in North America. Subsequently, the ERO must report to the Commission on its findings. Regional entities perform similar assessments within individual regions. Currently the ERO submits to FERC three assessments each year: long term, winter, and summer. In addition, the North American Electric Reliability Corporation (NERC, the Commission-approved ERO) also submits various other assessments as needed.
Reliability Standards Development: Under section 215 of the Federal Power Act (FPA),4 the ERO is charged with developing Reliability Standards. Regional Entities may also develop regional specific standards and have standard experts on staff to work with entities below the regional level.
Reliability Compliance: Reliability Standards are mandatory and enforceable upon approval by the Commission. In addition to the specific information collection requirements contained in each standard (cleared under other information collections), there are general compliance, monitoring and enforcement information collection requirements imposed on applicable entities. Audits, spot checks, self-certifications, exception data submittals, violation reporting, and mitigation plan confirmation are included in this area.
Stakeholder Survey: The ERO uses a stakeholder survey to solicit feedback from registered entities5 in preparation for its five-year self-performance assessment. The Commission assumes that the ERO will perform another survey prior to the 2025 self-assessment.
Other Reporting: This category refers to all other reporting requirements imposed on the ERO or regional entities in order to comply with the Commission’s regulations. For example, FERC may require NERC to submit a special reliability assessment or inquiry. This category captures these types of one-time filings required of NERC or the Regions.
The Commission implements its responsibilities related to FERC-725 through 18 CFR Part 39. Without the FERC-725 information, the FERC, ERO, and Regional Entities will not have the data needed to determine whether sufficient and appropriate measures are being taken to ensure the reliability of the nation’s electric grid.
Self-Assessment and ERO Applications information is valuable tool to communicate to Commission and entities how the ERO is performing and identifying areas they are seeking to improve. Reliability Assessment for long term, summer and winter help to identify areas of the grid that may need extra monitoring or configuration changes to ensure the Bulk Electric System (BES) can operate reliably. Failure to do Reliability Standards Development may create situations in which changing resources mix of the BES requires reliability standard modifications to ensure the systems operate correctly. If Reliability Compliance was not collected a useful tool would be lost, as the Compliance provides feedback into the Reliability Standards, helps determine shared problems areas that entities may have when implementing Reliability Standards. The ERO Stakeholder Survey collects information that is used to project direction for the ERO, not having entity survey input would diminish accuracy of forecasting and could lead to not identifying emerging trends. If Other Reporting is unavailable the ERO and other entities may not respond to Commission regulations or not be able to exam significant events that have such severe impacts to the BES.
Non-substantive submissions
RD24-6 (Issued April 29, 2024) Delegated Letter Order – Approving Petition (Petition of the North American Electric Reliability Corporation for Approval of New and Revised Definitions of Terms Used in Reliability Standards)
On March 8, 2024, the North American Electric Reliability Corporation (NERC) filed a petition for Commission approval, pursuant to section 215(d)(1) of the Federal Power Act (FPA) and section 39.5 of the Commission’s regulations, proposing two new, 30 modified, and four retired definitions of terms related to the calculation of Reporting Area Control Error (Reporting ACE), for inclusion in the Glossary of Terms Used in NERC Reliability Standards. NERC also seeks approval of the proposed implementation plan under which all the proposed defined terms would become effective the first day of the first calendar quarter that is 12 months after regulatory approval. NERC explains that it developed the proposed defined terms to improve the definition of Reporting ACE “to improve long-term average frequency performance as well as allow other Interconnections beyond the Western Interconnection the ability to pursue an automatic time error correction control methodology or similar functions.” NERC adds that, during this process, the drafting team identified the opportunity to further clarify and improve upon other related NERC Glossary terms.
RD24-7(Issued September 26, 2024) - ORDER APPROVING REGIONAL RELIABILITY STANDARD FAC-501-WECC-4
The approval of NERC and WECC’s proposed regional Reliability Standard FAC-501-WECC-4 (Transmission Maintenance), is covered by, and already included in, the existing OMB-approved information collection FERC-725 (Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards; OMB Control No. 1902-0225), under Reliability Standards Development.6 The reporting requirements in FERC-725 include the ERO’s overall responsibility for developing Reliability Standards, such as FAC-501-WECC-4, which is designed to ensure that transmission owners of certain transmission paths and associated facilities to have Transmission Maintenance and Inspection Plans and perform and document maintenance and inspection activities.7 The Commission will submit to OMB a request for a non-substantive revision of FERC-725 in connection with this order.
The Commission orders:
(1) regional Reliability Standard FAC-501-WECC-4; (2) the associated implementation plan, the associated Violation Risk Factors and Violation Severity Levels; (3) the retirement of the currently effective Commission-approved regional Reliability Standard FAC-501-WECC-2 immediately prior to the effective date of regional Reliability Standard FAC-501-WECC-4; (4) the Table Revision Process; and (5) the relocation of the Major WECC Transfer Paths Table to the Table Revision Process, as discussed in the body of this order.
RM24-04
The proposal to direct NERC to develop new, or to modify existing, reliability standards (and the corresponding burden) are covered by, and already included in, the existing OMB-approved information collection FERC-725 (Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards; OMB Control No. 1902-0225),8 under Reliability Standards Development.9 The reporting requirements in FERC-725 include the ERO’s overall responsibility for developing Reliability Standards, such as any Reliability Standards that relate to supply chain risk management.
We are proposing only to direct NERC, the Commission-certified ERO, to develop modified Reliability Standards to improve the sufficiency of the SCRM Plans required by CIP-013-2, and to protect PCAs under the SCRM Reliability Standards. These Standards are only applicable to high and medium impact BES Cyber Systems and their associated systems such as electronic access control or monitoring systems and physical access control systems.10 Therefore, this will not have a significant or substantial impact on entities other than NERC. Consequently, the Commission certifies that RM24-04 will not have a significant economic impact on a substantial number of small entities.
DESCRIBE ANY CONSIDERATION OF THE USE OF IMPROVED INFORMATION TECHNOLOGY TO REDUCE BURDEN AND THE TECHNICAL OR LEGAL OBSTACLES TO REDUCING BURDEN
All of the information that is reported to the Commission in this collection may be submitted electronically, through the Commission’s eFiling system (as described at http://www.ferc.gov/docs-filing/efiling.asp). For the remaining information collection requirements (information not submitted to the Commission), the use of current or improved technology is not controlled by the Commission and is therefore left to the discretion of each reporting entity. However, there is evidence that entities/regions are working together. For example, with the proposed revisions to the definition of “Bulk Electric System” the regional entities are working together to develop common forms to be used for submittal of information (covered under FERC-725J, OMB Control Number 1902-0259).
4. DESCRIBE EFFORTS TO IDENTIFY DUPLICATION AND SHOW SPECIFICALLY WHY ANY SIMILAR INFORMATION ALREADY AVAILABLE CANNOT BE USED OR MODIFIED FOR USE FOR THE PURPOSE(S) DESCRIBED IN INSTRUCTION NO. 2.
Filing requirements are periodically reviewed as OMB review dates arise, or as the Commission may deem necessary in carrying out its responsibilities, in order to eliminate duplication and ensure that filing burden is minimized. The Commission believes there are no similar sources of information available that can be used or modified for these purposes.
5. METHODS USED TO MINIMIZE BURDEN IN COLLECTION OF INFORMATION INVOLVING SMALL ENTITIES
This collection affects primarily NERC but also affects small registered entities. The Commission allows small entities to join a joint action agency or similar organization, which could accept responsibility for compliance with the Reliability Standards and related reporting requirements on behalf of its members. In NERC’s compliance database there are 46 entries for Joint Registration Organizations (JROs). FERC does not have records to indicate how many of the 46 entries are small business entities or parties of a joint action agency or similar organization, but FERC does estimate that at least half of the listed JROs are large organizations. The Commission does not know of any barriers that prevent entities from entering into joint action agreements. Generally, entities that enter into agreements do this because of shared responsibilities or geographic convenience.
CONSEQUENCE TO FEDERAL PROGRAM IF COLLECTION WERE CONDUCTED LESS FREQUENTLY
This collection focuses on electric reliability reporting requirements that are not contained within any Reliability Standards. The Commission approves these requirements as necessary for the reliable operation and oversight of the bulk electric system. Any reduction in frequency may diminish the ability of NERC, Regional Entities, or FERC in maintaining reliability on the bulk electric system.
7. EXPLAIN ANY SPECIAL CIRCUMSTANCES RELATING TO THE INFORMATION
There are no special circumstances related to this collection.
8. DESCRIBE EFFORTS TO CONSULT OUTSIDE THE AGENCY: SUMMARIZE PUBLIC COMMENTS AND THE AGENCY’S RESPONSE TO THESE COMMENTS
IC25-3-000
The 60-day notice for FERC-725 published on January 7, 2025 (90 FR 1120) and no comments were received. The 30-day notice published on March 17, 2025 (90 FR 12308).
The was no burden associated with the non-substantive submissions mentioned in section# 2 RD24-6, RD24-7, and RM24-04.
9. EXPLAIN ANY PAYMENT OR GIFTS TO RESPONDENTS
There are no payments or gifts to FERC-725 respondents.
10. DESCRIBE ANY ASSURANCE OF CONFIDENTIALITY PROVIDED TO RESPONDENTS
The Commission generally does not consider the data to be confidential. However, certain actions have confidentiality provisions which prevent the disclosure of information relating to enforcement actions and Critical Energy/Electric Infrastructure Information (CEII). 11 A request for material to be treated as CEII or privileged may be made under 18 CFR Part 388.
There are procedures in 18 CFR § 39.7(b)(4), and 39.7(e)(7), which prevent disclosure of information received pursuant to Section 215 of the Federal Power Act, which pertain to violations of Reliability Standards.
Section 39.7(b)(4) provides that,
“each violation or alleged violation shall be treated as nonpublic until the matter is filed with the Commission as a notice of penalty or resolved by an admission that the user, owner or operator of the Bulk-Power System violated a Reliability Standard or by a settlement or other negotiated disposition. The disposition of each violation or alleged violation that relates to a Cybersecurity Incident or that would jeopardize the security of the Bulk-Power System if publicly disclosed shall be nonpublic unless the Commission directs otherwise.”
Similarly, Section 39.7(e)(7) provides that,
“a proceeding for Commission review of a penalty for violation of a Reliability Standard will be public unless the Commission determines that a nonpublic proceeding is necessary and lawful, including a proceeding involving a Cybersecurity Incident. For a nonpublic proceeding, the user, owner or operator of the Bulk-Power System that is the subject of the penalty will be given timely notice and an opportunity for hearing and the public will not be notified and the public will not be allowed to participate.”
In addition,18 C.F.R. 388.112 provides that,
“any person submitting a document to the Commission may request privileged treatment by claiming that some or all of the information contained in a particular document is exempt from the mandatory public disclosure requirements of the Freedom of Information Act, 5 U.S.C. 552, and should be withheld from public disclosure.”
Finally, 18 CFR § 388.113 of the Commission’s rules and regulations governs access to CEII information. Under 18 CFR §388.113(b), the Commission may restrict access to previously filed documents as well as Commission-generated documents which contain CEII information.12
11. PROVIDE ADDITIONAL JUSTIFICATION FOR ANY QUESTIONS OF A SENSITIVE NATURE, SUCH AS SEXUAL BEHAVIOR AND ATTITUDES, RELIGIOUS BELIEFS, AND OTHER MATTERS THAT ARE COMMONLY CONSIDERED PRIVATE
The Commission does not consider any of the questions to be sensitive or private.
12. ESTIMATED BURDEN OF COLLECTION OF INFORMATION
Estimate of Annual Burden13: The Commission estimates the total annual burden and cost14 for this information collection in the table below. For hourly cost (for wages and benefits), we estimate that 70% of the time is spent by Electrical Engineers (code 17-2071, at $79.31/hr.), 10% of the time is spent by Legal (code 23-0000, at $162.66/hr.), and 20% by Information and Record Clerk (code 43-4199, at $44.74/hr.). Therefore, we use the weighted hourly cost (for wages and benefits) of $80.73(rounded) {or [(0.70) * ($79.13/hr.)] + [(0.10) * $162.66/hr.] + [(0.20) * $44.74/hr.]}.
FERC-725, Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards |
||||||
Type of Respondent |
Type of Reporting Requirement |
No. of Respondents (A)15 |
Annual No. of Responses Per Respondent (B)16 |
Total No. of Responses (A)x(B)=(C) |
Average Burden Hours & Cost ($) per Response (rounded) (D) |
Estimated Total Annual Burden Hrs. & Cost ($) (rounded) (C)x(D) |
Electric Reliability Organization (ERO) |
Self-Assessment |
1 |
.2 |
.2 |
4,160hrs.; $335,837 |
832 hrs.; $67,167 |
Reliability Assessments |
4 |
4 |
10,400 hrs.; $839,592 |
41,600 hrs.; $3,358,368 |
||
Reliability Compliance |
2 |
2 |
18,720 hrs.; $1,511,266 |
37,440 hrs.; $3,022,531 |
||
Standards Development |
1 |
1 |
24,960 hrs.; $2,015,021 |
24,960 hrs.; $2,015,021 |
||
Other Reporting |
1 |
1 |
4,160 hrs.; $335,836 |
4,160 hrs.; $335,836 |
||
ERO, Sub-Total |
|
|
|
|
108,992 hrs.; $8,798,924 |
|
Regional Entities |
Self-Assessment |
6 |
.2 |
1.2 |
4,160 hrs.; $335,836 |
4,992 hrs.; $403,004 |
Reliability Assessments |
1 |
6 |
12,480 hrs.; $1,007,510 |
74,880 hrs.; $6,045,062 |
||
Reliability Compliance |
1 |
6 |
47,840 hrs.; $3,862,123 |
287,040 hrs.; $23,172,739 |
||
Standards Development |
1 |
6 |
1,560 hrs.; $125,938 |
9,360 hrs.; $755,632 |
||
Other Reporting |
1 |
6 |
1,040 hrs.; $83,959 |
6,240 hrs.; $503,755 |
||
Regional Entities, Sub-Total |
|
|
|
|
382,512 hrs.; $30,880,194 |
|
Registered Entities |
Stakeholder Survey |
3,735 |
.2 |
747 |
8 hrs.; $646 |
5,976 hrs.; $482,442 |
Reliability Compliance |
1 |
3,735 |
180 hrs.; $14,531 |
672,300 hrs.; $54,274,779 |
||
Registered Entities, Sub-Total |
|
|
|
|
678,276 hrs.; $54,757,221 |
|
Total Burden Hrs. and Cost |
|
|
|
|
|
1,169,870 hrs.; $94,436,339 |
ESTIMATE OF TOTAL ANNUAL COST OF BURDEN TO
RESPONDENTS
Commission staff estimates annual non-labor related cost burden for the information collection remains unchanged from the last approval as:
Software costs (ERO): $15,000/year
Software costs (Regional Entities): $50,000/year
Therefore, the total estimated annual non-labor related cost is $65,000 for the FERC-725. All other costs are related to burden hours and are addressed in Questions #12 and #15.
14. ESTIMATED ANNUALIZED COST TO FEDERAL GOVERNMENT
|
Number of Employees (FTEs) |
Estimated Annual Federal Cost |
PRA17 Administration Cost |
|
$8,396 |
Data Processing and Analysis18 |
25 |
$5,194,675 |
FERC Total |
|
$5,203,071 |
The Commission bases its estimate of the ‘Data Processing and Analysis’ cost to the Federal Government on salaries and benefits for professional and clerical support. This estimated cost represents staff analysis, decision making, and review of actual filings.
The Paperwork Reduction Act (PRA) Administrative Cost (updated May 2024) is the average annual FERC cost associated with preparing, issuing, and submitting materials necessary to comply with the PRA for rulemakings, orders, or any other vehicle used to create, modify, extend, or discontinue an information collection. It also includes the cost of publishing the necessary notices in the Federal Register.
15. REASONS FOR CHANGES IN BURDEN INCLUDING THE NEED FOR ANY INCREASE
The table below shows the total burden of the collection of information, with adjustments due to the following reasons.
As shown in Question 12 above, there was a decrease from 9.2 to 4.2 in the number of regional entity responses. The decrease changed the burden hours from 420,992 to 382,512 for regional entities.
Other changes from previous estimates come from new data in the proposed NERC 2025 Business Plan and Budget to reflect changes in the number of FTEs working in applicable areas.
Reviewing the NERC Compliance database, we determined the number of unique U.S. registered entities was updated from 1,795 to 3,735.
Lastly, in several instances, the amount of time an FTE devotes to a given function may have been increased or decreased.
FERC-725 |
Total Request |
Previously Approved |
Change due to Adjustment in Estimate |
Change Due to Agency Discretion |
Annual Number of Responses |
4,515 |
1,829 |
2,686 |
0 |
Annual Time Burden (Hr.) |
1,169,780 |
1,134,938 |
34,842 |
0 |
Annual Cost Burden ($) |
65,000 |
65,000 |
0 |
0 |
The format, labels, and definitions of the table above follow the ROCIS system’s “ICR Summary of Burden” for the meta-data.
TIME SCHEDULE FOR PUBLICATION OF DATA
There are no tabulating, statistical, tabulating analysis, or publication plans for the collection of information. The data are used for regulatory purposes only.
17. DISPLAY OF EXPIRATION DATE
The expiration date is displayed in a table posted on ferc.gov at https://www.ferc.gov/information-collections.
EXCEPTIONS TO THE CERTIFICATION STATEMENT
There are no exceptions.
1 Section 215 was added by the Energy Policy Act of 2005, Pub. L. No. 109-58, 119 Stat. 594 (2005) (codified at 42 USC 16451, et seq.).
2 Rules Concerning Certification of the Electric Reliability Organization; and Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards ¶ 31,204 71 FR 8662 (2006) Order on rehearing, 71 FR 19,814 (2006), FERC Statutes and Regulations ¶ 31,212 (2006).
3 The Commission does not expect any new ERO applications to be submitted in the next five years and is not including any burden for this requirement in the burden estimate. FERC still seeks to renew the regulations pertaining to a new ERO application under this renewal but is expecting the burden to be zero for the foreseeable future. 18 CFR 39.3 contains the regulation pertaining to ERO applications.
4 16 U.S.C. 824o
5 A “registered entity” is an entity that is registered with the ERO. All Bulk-Power System owners, operators and users are required to register with the ERO. Registration is the basis for determining the Reliability Standards with which an entity must comply. See http://www.nerc.com/page.php?cid=3%7C25 for more details.
6 Reliability Standards Development as described in FERC-725 covers standards development initiated by NERC, the Regional Entities, and industry, as well as standards the Commission may direct NERC to develop or modify.
7 Regional Reliability Standard FAC-501-WECC-4, Purpose.
8 Another item for FERC-725 is pending review at this time, and only one item per OMB Control No. can be pending OMB review at a time. In order to submit this NOPR timely to OMB, we are using FERC-725(1B) (a temporary, placeholder information collection number).
9 Reliability Standards development as described in FERC-725 covers standards development initiated by NERC, the Regional Entities, and industry, as well as standards the Commission may direct NERC to develop or modify.
10 Cf. Cyber Security Incident Reporting Reliability Standards, Notice of Proposed Rulemaking, 82 FR 61499 (Dec. 28, 2017), 161 FERC ¶ 61,291 (2017) (proposing to direct NERC to develop and submit modifications to the Reliability Standards to improve mandatory reporting of Cyber Security Incidents, including incidents that might facilitate subsequent efforts to harm the reliable operation of the Bulk-Power System).
11 For more information on the Commission’s CEII program (and submitting and accessing CEII materials), see https://www.ferc.gov/legal/ceii-foia/ceii.asp.
12 18 CFR 388.112
13 “Burden” is the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a federal agency. For further explanation of what is included in the information collection burden, refer to Title 5 Code of Federal Regulations 1320.3.
14
Costs (for wages and benefits) are based on wage figures from the
Bureau of Labor Statistics (BLS) for May 2024 (at
https://www.bls.gov/oes/current/naics2_22.htm)
and benefits information (at
https://www.bls.gov/news.release/ecec.nr0.htm)
.
15 Estimated number of respondents is taken from the November 20, 2024, NERC Compliance Registration tables. NERC is the only ERO and there are six regional entities (MRO, WECC, RF, SERC, NPCC and Texas RE). The estimated 3,735 represents the number of only US unique entities.
16 In instances where the number of responses per respondent is “1,” the Commission Staff thinks that the actual number of responses varies and cannot be estimated accurately.
17 Paperwork Reduction Act of 1995 (PRA).
18 The cost estimate is based upon FERC’s FY2024 average annual salary plus benefits per FTE (full-time equivalent) of $207,787.
File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document |
File Created | 2025:05:31 00:50:24Z |