Annual Transmission Planning and Evaluation Report

FERC-715, Annual Transmission Planning and Evaluation Report

Form No. 715 - Annual Transmission Planning and Evaluation Report _ Federal Energy Regulatory Commission

Annual Transmission Planning and Evaluation Report

OMB: 1902-0171

Document [pdf]
Download: pdf | pdf
Form No. 715 - Annual Transmission
Planning and Evaluation Report
Report Instructions
We now accept Form 715 submissions via FERC eFiling.
Revised: January 2010
Approved: OMB Control No. 1902-0171
Expires: 11/30/2025
This report is mandatory under Sections 213(b), 307(a) and 311 of the Federal Power Act
and 18 CFR § 141.300 of the Commission's regulations.
§ 141.300 FERC Form No. 715, Annual Transmission Planning and Evaluation Report

Who must file
Any transmitting utility, as defined in § 3(23) of the Federal Power Act, that operates integrated
(that is, non-radial) transmission facilities at or above 100 kilovolts must complete FERC Form
No. 715.

When to file
FERC Form No. 715 must be filed on or before each April 1st.

What to file
FERC Form No. 715 must be filed with the Office of the Secretary of the Federal Energy
Regulatory Commission in accordance with the instructions on that form.
The Commission considers the information collected by this report to be Critical Energy
Infrastructure Information (CEII) and will treat it as such. The public reporting burden for this
collection of information is estimated to average 160 hours per response, including the time for
reviewing the instructions, searching existing data sources, gathering and maintaining the data
needed, and completing and reviewing the collection of information. You shall not be

penalized for failure to respond to this collection of information unless the collection of
information displays a valid OMB control number.
Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing this burden, to [email protected], or to:
Federal Energy Regulatory Commission
Office of the Chief Information Officer
ATTN: Information Clearance Officer
888 First Street, N.E.
Washington, DC 20426
Comments should also be sent to the Office of Information and Regulatory Affairs, Office of
Management and Budget, Washington, DC 20503 (Attention: Desk Officer for the Federal Energy
Regulatory Commission) at [email protected].

Table of Contents
I.      General Information
A. Purpose of Report
B. Who Must Submit
C. Waiver Request
D. Blank or N/A (Not Applicable) Responses
E. Checklist and Where to Submit
F. When to Submit
G. Contact Information
H. Sanctions and Confidentiality Statements
II.      General Instructions
A. Submit
B. Designate Entity to Submit Power Flow Cases
C. Fee Schedule
D. The Importance of Power Flow Cases in the Evaluation of System Performance
III.      Terms and Definitions
A. Transmission Planning Reliability Criteria
B. Transmitting Utility
IV.      Specific Instructions

A.      Part 1:  Identification and Certification
B.      Part 2:  Power Flow Base Cases
C.      Part 3:  Transmitting Utility Maps and Diagrams
D.      Part 4:  Transmission Planning Reliability Criteria
E.      Part 5:  Transmission Planning Assessment Practices
F.      Part 6:  Evaluation of Transmission System Performance

I.      General Information
Purpose of Report
The FERC Form No. 715, Annual Transmission Planning and Evaluation Report, is required
pursuant to Sections 213(b), 307(a) and 311 of the Federal Power Act to provide information
adequate to inform potential transmission customers, State regulatory authorities and the
public of potential transmission capacity and known constraints, to support the Commission's
expanded responsibilities under §§ 211, 212 and 213(a) of the Federal Power Act (as amended
by the Energy Policy Act), and to assist in rate or other regulatory proceedings.

Who Must Submit
Each transmitting utility, as defined in section 3(23) of the Federal Power Act, that operates
network (that is, non-radial) transmission facilities at or above 100 kilovolts must report the
information requested under the listed items in the prescribed manner. In the case of joint
ownership, only the operator of the facilities must report.
A designated agent, such as a regional transmission group, regional reliability organization,
formal power pool, or other group, may submit part or all of the required information on
behalf of the transmitting utility. The transmitting utility is responsible for submitting all data
not submitted on its behalf by a designated agent. Designated agents must specify the
transmitting utility (or transmitting utilities) for which they are submitting information. The
Commission prefers that all power flow data submitted for Part 2 of FERC-715 be submitted by
designated agents outlined above.

Waiver Request
The final rule requires that an entity requesting waiver of FERC-715 must either: (1) indicate the
entity that performs transmission planning for it, or (2) state that it does not use power flow
analyses in performing transmission planning. Once granted, a waiver request in subsequent
years is unnecessary, provided the party's status does not change; that is, as long as the party
does not begin to perform transmission planning or to use power flow analyses in its planning.
Requests for waivers must be submitted prior to the required submission date, April 1st of the
filing year.

Blank or N/A (Not Applicable) Responses
All parts of the FERC-715 must be completed. Blank or N/A (Not Applicable) responses are not
acceptable. For example; for Parts 4 and 5, respondent transmitting utilities should state the
reasons why they have not developed specific transmission reliability criteria or assessment
practices for their own system in addition to that of the regional entities if that should be the
case.

Checklist and Where to Submit
Respondents may send their responses via FERC eFiling, if all the files comprising the
submission are on the list of FERC acceptable file formats.
Respondents who are unable or unwilling to use the FERC eFiling system must submit one
original, either in hardcopy or electronically on CDs or DVDs, including all six Parts of FERC-715
to:

When to Submit
File the report annually by April 1st of the filing year.

Contact Information
Direct technical questions concerning the FERC-715, Annual Transmission Planning and
Evaluation Report, to email [email protected].

Sanctions and Confidentiality Statements
The FERC-715, Annual Transmission Planning and Evaluation Report, is mandatory under the
Federal Power Act. The information reported in FERC-715 is classified as CEII. Late filing or
failure to file, keep records, or comply with these instructions may result in criminal fines, civil
penalties, and other sanctions as provided by law. Title 18, U.S.C. 1001 makes it a crime for any
person knowingly and willingly to make to any Agency or Department of the United States any
false, fictitious, or fraudulent statements as to any matter within its jurisdiction.
Federal Energy Regulatory Commission
Form No. 715
Secretary of the Commission
888 First Street, N.E.
Washington, DC 20426

General Instructions

The Federal Energy Regulatory Commission (Commission) has determined that to satisfy
section 213(b) of the Federal Power Act (FPA) it is necessary for potential customers to be able
to reasonably anticipate the outcome of technical studies that a transmitting utility would
perform in assessing the availability of transmission capacity to satisfy a request for
transmission service.
Therefore, the Commission requires each transmitting utility, or its designated agent, to:

Submit
The Commission requires each transmitting utility, or its designated agent, to submit an
annual report that includes:
1.  Power flow base cases for its transmission system, or if the transmitting utility belongs to a
regional or subregional transmission planning or reliability organization, power flow base
cases for that region or subregion.
2. System maps and one-line diagrams.
3. A description of their reliability criteria and transmission planning assessment practices.
4. An evaluation under the reliability criteria of the current and future performance of their
transmission system.

Designate Entity to Submit Power Flow Cases
The Commission requires each transmitting utility, or its agent, to designate any regional or
subregional transmission planning or reliability organizations to which it belongs or any other
single entity to submit to the Commission any regional or subregional power flow base cases
developed for the purposes of members' transmission planning.

Fee Schedule
If Respondents make CEII directly available to the requesting public and desire to impose
copying charges for this service, they shall provide a fee schedule.

The Importance of Power Flow Cases in the Evaluation of System
Performance
The Commission assumes that most transmitting utilities participate in the development, by a
regional or subregional organization to which they belong, of regional or subregional power
flow base cases. The purpose of this process is to ensure consistency of assumptions and
accuracy of data.

Individual members of regional or subregional organizations use these power flow cases as the
starting place for their own transmission planning studies. A detailed description of a
transmitting utility's reliability criteria and planning practices and an evaluation of system
performance are essential to perform planning studies, to assess the availability of
transmission, to identify potential constraints, and to anticipate the outcome of transmitting
utility technical studies made in response to an actual request for service.

III.     Terms and Definitions
Transmission Planning Reliability Criteria
The measuring systems and performance standards that are used for assessing the actual or
projected ability of the bulk electric transmission system to deliver power to load reliably.
Failure to attain a specified performance standard indicates the need to consider adding or
rearranging facilities, changing operating modes, or other responses.
Examples of criteria that might apply to simulated testing of the bulk electric transmission
system are:
1. No cascading outage following any specified set of contingencies.
2. No overloaded facilities following a specified contingency.
3. All voltages within prescribed limits.

Transmitting Utility
Any electric utility, qualifying cogeneration facility (section 3(18)(B), FPA), qualifying small
power production facility (section 3(17)(C), FPA), or Federal power marketing agency (section
3(19), FPA) that owns or operates electric power transmission facilities that are used for the
sale of electric energy at wholesale. (section 3(23), FPA)

IV.     Specific Instructions
Part 1: Identification and Certification
Provide the following information:
1. Transmitting Utility Name
2. Transmitting Utility Mailing Address
3. Contact Person Name
4. Contact Person Title
5. Contact Person Telephone Number

6. Contact Person Facsimile Number
7. Certification by an authorized official of the Transmitting Utility regarding the accuracy of
the information submitted.
8. Certifying Official Signature
9. Certifying Official Name
10. Certifying Official Title

Part 2:  Power Flow Base Cases
A Respondent participating in a regional or subregional process (for consolidating and
ensuring the consistency and accuracy of the power flow information used by the Respondent
for transmission planning) must submit the most current regional or subregional input data to
solved power flow base cases that the transmitting utility would ordinarily use as the starting
point for its transmission planning studies or, where these data are unavailable from a regional
organization, submit such data itself.
If the Respondent participates in such a regional or subregional process, it must submit the
following items:
1. Regional or subregional organization name.
2. Regional or subregional organization mailing address.
3. Regional or subregional organization contact person.
4. Regional or subregional organization contact person title.
5. Regional or subregional organization contact person telephone number.
6. Regional or subregional organization contact person facsimile number.
7. Description of process for public access to regional or subregional power flow information.
8. Description of power flow cases currently available from regional or subregional
organization, including time frame, conditions, format, media, and the fees, if any, for
copying data for the public.
If a Respondent does not participate in the development of regional or subregional
transmission planning power flow base cases, the Respondent must submit its own equivalent
power flow base cases directly to the Commission.
Each Respondent must submit for each solved power flow base case: the input data file (in
formats described below) and the corresponding output data file (in ASCII format) showing the
solved real and reactive power flows, voltages, real and reactive generation and loads, solution
parameters, and other relevant output information; or, in the alternative, at a minimum, a oneline diagram showing real and reactive power flows, bus voltages and angles, generator

outputs, transformer tap settings and loads. Formats that combine the input and output data
in a single file, such as the PTI SAV format, are also acceptable. Such formats should allow
users to access the output data without having to solve the case.
Regional and subregional organizations authorized by their members to provide access to
solved power flow cases should make them available electronically on CDs or DVDs, or via a
secure computer bulletin board, when practical, in the input data format associated with the
power flow program that the regional or subregional organizations use in their transmission
studies. The Commission expects that, in nearly all cases, the format will be one of the
following:
1. The Raw Data File or Saved Case formats of the PTI (Power Technologies, Inc.) PSS/E Power
flow program.
2. The Card Deck Image format of the Philadelphia Electric Power flow program.
3. The Card Deck format of the WSCC Power flow program.
4. The Raw Data File format of the General Electric PSLF power flow program.
5. The IEEE Common Format for Exchange of Solved Power Flows.
6. The Binary or Project File format of the PowerWorld simulator.
Respondents submitting their own cases must supply the solved base cases and associated
output data on CDs or DVDs in the format associated with the power flow program used by the
Respondents in the course of their transmission studies, as described above.
The power flow cases may also be submitted via eFiling, if they are available in an acceptable
file format. A list of acceptable file formats is available on the FERC eFiling website.
The input data to the solved power flow base cases must be forward-looking. For example, the
power flow base cases submitted and made available might include:
1. One, two, five, and ten-year forecasts under summer and winter peak conditions.
2. A one-year forecast under light load/heavy transfers condition.
This example is similar to a schedule of base cases proposed by North American Electric
Reliability Corporation's (NERC) Multiregional Modeling Working Group for development at the
time this form was created. A regional or subregional organization may develop, depending on
its needs, a different number of power flow base cases than those described above.
The power flow base cases must be in sufficient detail that network equivalents, if used, extend
sufficiently beyond the electrical borders of the transmitting utility that potential transmission
users could simulate power transfers within a reasonable market area without significant loss
of accuracy.

The power flow base cases should include all branch circuit ratings (that is, normal, long-term
and short-term emergency, or other relevant ratings) that a Respondent uses. Each
Respondent must also submit or make available a data-dictionary that cross-references the
bus or line terminal names. Energy Information Administration (EIA) codes must be included
for each generating plant referenced. | EIA Plant Codes.

Part 3:  Transmitting Utility Maps and Diagrams
1. Each Respondent must submit general transmission maps and single-line schematic
diagrams. The maps and diagrams should be those prepared in the general course of
business for planning and operating purposes. The guidelines provided below indicate the
type of information and the level of detail desired; however, the Commission is not
requiring the Respondent to specifically prepare new maps and diagrams to satisfy this
requirement. If the Respondent has readily available more than one set of maps and/or
diagrams, the Commission requests that the set submitted best provide the level of detail
described below.
2. The transmitting utility's general maps should show the geographic locations and names
of:
Generating plants
Switching stations
Substations
Service areas
Interconnections with other utilities
3. The transmitting utility's single-line schematic diagrams should show and identify:
AC and DC transmission lines and facilities, including their nominal operating and
design voltages.
Electrical connections
Generating plants
Transformation facilities
Phase angle transformers
VAR control equipment; (i.e., shunt and series capacitors and inductors, etc.).
4. On the maps or in separate documentation, each Respondent should provide a legend that
shows the symbols used on the map or diagram to represent generators, transmission lines,
transformers, capacitors, reactors, buses, etc.
5. Respondents must submit new maps or diagrams each year regardless of its revision.
6. The FERC prefers all maps and diagrams be submitted electronically in a format such that
any text is searchable. For example, these maps typically list many substations, and FERC

prefers that the format support a search for specific substation names. The Adobe PDF
format is an example of a common file type that provides this feature.

Part 4:  Transmission Planning Reliability Criteria
Each Respondent is to provide the transmission planning reliability criteria used to assess and
test the strength and limits of its transmission system to meet its load responsibility as well as
to move bulk power between and among other electric systems.
If a transmitting utility subscribes, through its interconnection or pooling agreements with
others, to criteria that are more detailed than the NERC and regional entity standards, then it
must also submit these additional criteria.
The Commission expects that each transmitting utility will have additional detailed criteria.
For example, each utility generally sets its own voltage limit criteria on its bulk system as well
as its lower voltage system, since NERC and the regional entities generally do not. Each
transmitting utility must submit all such additional criteria.
The above criteria will be those which the transmitting utility uses to determine available
transmission capacity needed to meet potential transmission requests as well as its own native
load. A transmitting utility must describe the criteria that it uses in sufficient detail to allow
others to use the criteria when performing their own planning or screening studies and to
better understand the process of determining available transmission capacity.
In subsequent years, Respondents need only identify and file changed criteria. If the criteria
are unchanged from a previous filing, please provide the date of that filing. If this date is prior
to the 2010 filing deadline, Respondents need only state that the previous filing was "prior to
the 2010 filing."

Part 5:  Transmission Planning Assessment Practices
The criteria submitted under Part 4 of this form set the limits of transmission use. However,
assessment practices that a transmitting utility uses in applying these criteria are as important
as the criteria themselves. These practices, developed through experience and study, include
consideration of detailed factors that a transmitting utility may not list in the criteria that it
submits under Part 4. For example, a utility might have certain operating restrictions and
limitations that must be met by appropriate modeling within a simulation study.
Also, through experience and study, each transmitting utility may have developed a list of
various contingencies it typically tests against in the application of its transmission planning
reliability criteria. For example, before testing for the limits of transmission capability that
could be used for firm power transfers on its system, a transmitting utility will assume, based
on experience or realistic expectation, that certain facilities will be unavailable for some period

of time. Each transmitting utility must identify these contingencies and submit them under this
Part.
A description of the Respondent's practices when applying the transmission planning
reliability criteria submitted in Part 4 must be submitted under this part. The description must
include the substantive planning assessment practices that a Respondent follows in the
normal course of business. The information filed should help requesters to perform planning
or screening studies and to better understand the process of determining available
transmission capacity and known constraints.
In subsequent years, Respondents need only identify and file changed assessment practices. If
the practices are unchanged from a previous filing, please provide the date of that filing. If this
date is prior to the 2010 filing deadline, Respondents need only state that the previous filing
was "prior to the 2010 filing."

Part 6:  Evaluation of Transmission System Performance
The transmitting utility must provide a narrative evaluation or assessment of the performance
of its transmission system in future time periods based on the application of its reliability
criteria. It must provide a clear understanding of existing and likely future transmission
constraints, their sources, how it identified these constraints, and a description of any plans to
mitigate the constraints. The evaluation must provide a clear understanding of the existing and
expected system performance of the Respondent's transmission system. The evaluation
should include a description of all existing transmission stability limits that the transmitting
utility has uncovered through dynamic system simulation studies. If, in their studies,
Respondents identify stability as a regional transmission limiting factor, Respondents must, on
request, provide the results of their studies.
The required evaluation is to be drawn from existing utility transmission planning studies and
the experience and judgment of the Respondents' transmission system planners. Respondents
may base the required evaluation, in part, on recently performed operating studies that
determine transfer capabilities for the upcoming peak load season.
 

Quick Links
Form No. 715 Overview
2025 Filing Instructions
Form No. 715 Data
EIA Plant Codes

CEII Information
Report Instructions

Contact Information
Matthew Nutter
Telephone: 202-502-8291
Email: [email protected]
FERC Online Support
Hours of Operation 8:00 -5:00 ET | TTY: 202-502-8659
Telephone: 202-502-6652
Toll-free Telephone: 1-866-208-3676
Email: [email protected]

This page was last updated on January 14, 2025


File Typeapplication/pdf
File TitleForm No. 715 - Annual Transmission Planning and Evaluation Report | Federal Energy Regulatory Commission
File Modified2025-07-02
File Created2025-07-02

© 2025 OMB.report | Privacy Policy