U.S. Environmental Protection Agency
Information Collection Request
Title: NSPS for Ammonium Sulfate Manufacturing Plants (40 CFR Part 60, Subpart PP) (Renewal)
OMB Control Number: 2060-0032
EPA ICR Number: 1066.11
Abstract: The New Source Performance Standards (NSPS) Ammonium Sulfate Manufacturing Plants (40 CFR Part 60, Subpart PP) were proposed on February 4, 1980, promulgated on November 12, 1980, and amended on October 17, 2000. These regulations apply to ammonium sulfate dryers located at both existing and new ammonium sulfate manufacturing plants in the caprolactam by-product, synthetic, and coke oven by-products sectors of the ammonium sulfate manufacturing industry. New facilities include those that commenced construction, modification or reconstruction after the date of proposal. This information is being collected to assure compliance with 40 CFR Part 60, Subpart PP.
In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NSPS.
The active (previous) ICR had the following Terms of Clearance (TOC):
“In accordance with 5 CFR 1320, EPA is required to include the following information in its submission for information collection request review and approval: (1) supporting statements to show compliance with requirements and other associated laws; (2) a description of the regulatory text applicable to the ICR including submission specifications; (3) a clear description of the data elements being collected under the ICR; (4) copies of the data collection instrument and/or screen shots of the electronic portal where the reporting requirements are submitted to EPA (with the control number and burden statement included); (5) a detailed discussion of how information is submitted and the extent to which electronic reporting is available; (6) evidence of consultation with respondents (by actively reaching out to stakeholders as permitted by the PRA) to ensure the supporting statement's accuracy on availability of data, frequency of collection, clarity of instructions, accuracy of burden estimate, relevance of data elements, and similar PRA matters; and (7) discussion of how EPA addressed substantive concerns raised by respondents and other stakeholders during consultation and in response to comments received on FR notices. In addition, supporting statement A should use the standard 18 question SS-A format.”
The relevant regulatory text is referenced in section 12(b) of this document. We have created a supplementary document including the regulatory text that describes the ICR requirements as identified in section 12(b) of this document as requested. This NSPS does not require electronic reporting, and the Agency has not developed specific reporting forms for these subparts for use within CEDRI. The list of rules and required reports available in CEDRI are available at https://www.epa.gov/electronic-reporting-air-emissions/cedri. The notifications and reports required of respondents may be submitted to the authority by any appropriate method such as paper letter or electronic data file. A description of the EPA’s consultation with respondents and how EPA responded to any concerns raised by respondents or other stakeholders is discussed in section 8 of this document. Per the Terms of Clearance on the previous ICR, this supporting statement follows the standard 18-question format.
Supporting Statement A
Explain the circumstances that make the collection of information necessary. Identify any legal or administrative requirements that necessitate the collection.
The EPA is charged under Section 111 of the Clean Air Act (CAA), as amended, to establish standards of performance for new stationary sources that reflect:
. . . application of the best technological system of continuous emissions reduction which (taking into consideration the cost of achieving such emissions reduction, or any non-air quality health and environmental impact and energy requirements) the Administrator determines has been adequately demonstrated. Section 111(a)(l).
The Agency refers to this charge as selecting the best demonstrated technology (BDT). Section 111 also requires that the Administrator review and, if appropriate, revise such standards every eight years. In addition, section 114(a) states that the Administrator may require any owner/operator subject to any requirement of this Act to:
(A) Establish and maintain such records; (B) make such reports; (C) install, use, and maintain such monitoring equipment, and use such audit procedures, or methods; (D) sample such emissions (in accordance with such procedures or methods, at such locations, at such intervals, during such periods, and in such manner as the Administrator shall prescribe); (E) keep records on control equipment parameters, production variables or other indirect data when direct monitoring of emissions is impractical; (F) submit compliance certifications in accordance with Section 114(a)(3); and (G) provide such other information as the Administrator may reasonably require.
In the Administrator's judgment, particulate matter emissions from the ammonium sulfate manufacturing industry cause or contribute to air pollution that may reasonably be anticipated to endanger public health or welfare. Therefore, the NSPS were promulgated for this source category at 40 CFR Part 60, Subpart PP.
Indicate how, by whom, and for what purpose the information is to be used. Except for a new collection, indicate the actual use the agency has made of the information received from the current collection.
The recordkeeping and reporting requirements in these standards ensure compliance with the applicable regulations which were promulgated in accordance with the Clean Air Act. The collected information is also used for targeting inspections and as evidence in legal proceedings.
Performance tests are required in order to determine an affected facility’s initial capability to comply with the emission standards. Continuous emission monitors are used to ensure compliance with these standards at all times. During the performance test, a record of the operating parameters under which compliance was achieved may be recorded and used to determine compliance in place of a continuous emission monitor.
The notifications required in the standards are used to inform the Agency or delegated authority when a source becomes subject to the requirements of the regulations. The reviewing authority may then inspect the source to check if the pollution control devices are properly installed and operated, leaks are being detected and repaired, and that the standards are being met. The performance test may also be observed.
The required semiannual reports are used to determine periods of excess emissions, identify problems at the facility, verify operation/maintenance procedures, and for compliance determinations.
Describe whether, and to what extent, the collection of information involves the use of automated, electronic, mechanical, or other technological collection techniques or other forms of information technology, e.g., permitting electronic submission of responses, and the basis for the decision for adopting this means of collection. Also describe any consideration of using information technology to reduce burden.
Some of the respondents are using monitoring equipment that automatically records parameter data. Although personnel at the affected facility must still evaluate the data, internal automation has significantly reduced the burden associated with monitoring and recordkeeping at a plant site.
Electronic copies of records may also be maintained in order to satisfy federal recordkeeping requirements. For additional information on the Paperwork Reduction Act requirements for CEDRI and ERT for this rule, see: https://www.epa.gov/electronic-reporting-air-emissions/paperwork-reduction-act-pra-cedri-and-ert.
Describe efforts to identify duplication. Show specifically why any similar information already available cannot be used or modified for use for the purposes described in Item 2 above.
For reports required to be submitted electronically, the information is sent through the EPA's CDX, using CEDRI, where the appropriate EPA regional office can review it, as well as state and local agencies that have been delegated authority. If a state or local agency has adopted under its own authority its own standards for reporting or data collection, adherence to those non-Federal requirements does not constitute duplication.
For all other reports, if the subject standards have not been delegated, the information is sent directly to the appropriate EPA regional office. Otherwise, the information is sent directly to the delegated state or local agency. If a state or local agency has adopted its own standards to implement the Federal standards, a copy of the report submitted to the state or local agency can be sent to the Administrator in lieu of the report required by the Federal standards. Therefore, duplication does not exist.
If the collection of information impacts small businesses or other small entities, describe any methods used to minimize burden.
There are no small entities (i.e., small businesses) affected by this regulation. However, the impact on small entities (i.e., small businesses) was taken into consideration during the development of the regulation. Due to technical considerations involving the process operations and the types of control equipment employed, the recordkeeping and reporting requirements are the same for both small and large entities. The Agency considers these to be the minimum requirements needed to ensure compliance and, therefore, cannot reduce them further for small entities. To the extent that larger businesses can use economies of scale to reduce their burden, the overall burden will be reduced.
Describe the consequence to Federal program or policy activities if the collection is not conducted or is conducted less frequently, as well as any technical or legal obstacles to reducing burden.
Less frequent information collection would decrease the margin of assurance that facilities are continuing to meet the standards. Requirements for information gathering and recordkeeping are useful techniques to ensure that good operation and maintenance practices are applied, and emission limitations are met. If the information required by these standards was collected less frequently, the proper operation and maintenance of control equipment and the possibility of detecting violations would be less likely.
Explain any special circumstances that require the collection to be conducted in a manner inconsistent with OMB guidelines.
These reporting or recordkeeping requirements do not violate any of the regulations promulgated by OMB under 5 CFR Part 1320, Section 1320.5.
If applicable, provide a copy and identify the date and page number of publication in the Federal Register of the Agency's notice, required by 5 CFR 1320.8(d), soliciting comments on the information collection prior to submission to OMB. Summarize public comments received in response to that notice and describe actions taken by the Agency in response to these comments. Specifically address comments received on cost and hour burden.
An announcement of a public comment period for the renewal of this ICR was published in the Federal Register (89 FR 63933) on August 6, 2024. No comments were received on the burden published in the Federal Register for this renewal.
8b. Consultations
Describe efforts to consult with persons outside the Agency to obtain their views on the availability of data, frequency of collection, the clarity of instructions and recordkeeping, disclosure, or reporting format (if any), and on the data elements to be recorded, disclosed, or reported. Consultation with representatives of those from whom information is to be obtained or those who must compile records should occur at least once every 3 years - even if the collection of information activity is the same as in prior periods. There may be circumstances that may preclude consultation in a specific situation. These circumstances should be explained.
The Agency has consulted industry experts and internal data sources to project the number of affected facilities and industry growth over the next three years. The primary source of information as reported by industry, in compliance with the recordkeeping and reporting provisions in the standard, is the Integrated Compliance Information System (ICIS). ICIS is EPA’s database for the collection, maintenance, and retrieval of compliance data for industrial and government-owned facilities. The growth rate for the industry is based on our consultations with the Agency’s internal industry experts. Approximately two respondents will be subject to the standard over the three-year period covered by this ICR.
Industry trade association(s) and other interested parties were provided an opportunity to comment on the burden associated with the standard as it was being developed and the standard has been previously reviewed to determine the minimum information needed for compliance purposes. In developing this ICR, we contacted both The Fertilizer Institute at (202) 962-0490, and the American Chemical Society at (800) 227-5558. In this case, no comments were received.
It is our policy to respond after a thorough review of comments received since the last ICR renewal as well as those submitted in response to the first Federal Register notice. In this case, no comments were received.
Explain any decisions to provide payments or gifts to respondents, other than remuneration of contractors or grantees.
No payments or gifts are made to respondents.
ASSURANCE OF CONFIDENTIALITY
Describe any assurance of confidentiality provided to respondents and the basis for the assurance in statute, regulation, or Agency policy. If the collection requires a systems of records notice (SORN) or privacy impact assessment (PIA), those should be cited and described here.
Any information submitted to the Agency for which a claim of confidentiality is made will be safeguarded according to the Agency policies set forth in Title 40, chapter 1, part 2, subpart B - Confidentiality of Business Information (see 40 CFR 2; 41 FR 36902, September 1, 1976; amended by 43 FR 40000, September 8, 1978; 43 FR 42251, September 20, 1978; 44 FR 17674, March 23, 1979).
Provide additional justification for any questions of a sensitive nature, such as sexual behavior and attitudes, religious beliefs, and other matters that are commonly considered private. This justification should include the reasons why the Agency considers the questions necessary, the specific uses to be made of the information, the explanation to be given to persons from whom the information is requested, and any steps to be taken to obtain their consent.
The reporting or recordkeeping requirements in the standard do not include sensitive questions.
Provide estimates of the hour burden of the collection of information. The statement should:
Indicate the number of respondents, frequency of response, annual hour burden, and an explanation of how the burden was estimated. Generally, estimates should not include burden hours for customary and usual business practices.
If this request for approval covers more than one form, provide separate hour burden estimates for each form and the aggregate the hour burdens.
Provide estimates of annualized cost to respondents for the hour burdens for collections of information, identifying and using appropriate wage rate categories. The cost of contracting out or paying outside parties for information collection activities should not be included here. Instead, this cost should be included as O&M costs under non-labor costs covered under question 13.
The respondents to the recordkeeping and reporting requirements are ammonium sulfate manufacturing facilities. The United States Standard Industrial Classification (SIC) code for the respondents affected by the standards is SIC 2873 which corresponds to the North American Industry Classification System (NAICS) 325311 for Nitrogenous Fertilizer Manufacturing.
Based on our research for this ICR, on average over the next three years, approximately two existing respondents will be subject to the standard. It is estimated that no additional respondents per year will become subject, for an overall total of two respondents per year. The number of respondents is calculated using the table Number of Respondents that addresses the three years covered by this ICR. None of the facilities in the United States are owned by either state, local, or tribal entities or by the Federal government. They are all owned and operated by privately-owned, for-profit businesses. We assume that they will all respond to EPA inquiries. Based on our consultations with industry representatives, there is an average of one affected facility at each plant site and each plant site has only one respondent (i.e., the owner/operator of the plant site).
The total number of annual responses per year is calculated using the table Total Annual Responses shown below. The number of Total Annual Responses is four.
In this ICR, all the data that are recorded or reported is required by the NSPS. Any owner/operator subject to the provisions of this part shall maintain a file of these measurements and retain the file for at least two years following the date of such measurements, maintenance reports, and records.
A source must make the following reports:
Notifications |
|
Notification of construction or modification |
§60.7(a)(1) |
Notification of initial startup |
§60.7(a)(3) |
Notification of initial performance test |
§60.8(d) |
Reports |
|
Semiannual report |
§60.7(c) |
A source must keep the following records:
Recordkeeping |
|
Initial performance test results |
§60.8(a) |
Startup, shutdowns, and malfunctions |
§60.8(c) |
Control device operating parameters (continuous) |
§60.7(f) |
Records should be retained for two years |
§60.7(f) |
Respondent Activities |
Familiarization with the regulatory requirements. |
Install, calibrate, maintain, and operate a flow monitoring device to determine the mass-flow of ammonium sulfate feed material to the process. |
Install, calibrate, maintain, and operate CMS for particulate matter (PM) and a CMS for pressure drop across the emission control system. |
Perform initial performance test, Reference Method 5 and 9 tests, and repeat performance tests if necessary. |
Write the notifications and reports listed above. |
Enter information required to be recorded above. |
Submit the required reports developing, acquiring, installing, and utilizing technology and systems for collecting, validating, and verifying information. |
Develop, acquire, install, and utilize technology and systems for processing and maintaining information. |
Develop, acquire, install, and utilize technology and systems for disclosing and providing information. |
Train personnel to be able to respond to a collection of information. |
Transmit, or otherwise disclose the information. |
12d. Respondent Burden Hours and Labor Costs
Table 1 documents the computation of individual burdens for the recordkeeping and reporting requirements applicable to the industry for the subpart included in this ICR. The individual burdens are expressed under standardized headings believed to be consistent with the concept of burden under the Paperwork Reduction Act. Where appropriate, specific tasks and major assumptions have been identified. Responses to this information collection are mandatory.
The average annual burden to industry over the next three years from these recordkeeping and reporting requirements is estimated to be 286 hours (Total Labor Hours from Table 1). These hours are based on Agency studies and background documents from the development of the regulation, Agency knowledge and experience with the NESHAP program, the previously approved ICR, and any comments received.
This ICR uses the following labor rates:
Managerial $172.41 ($82.10 + 110%)
Technical $141.75 ($67.50 + 110%)
Clerical $71.36 ($33.98 + 110%)
These rates are from the United States Department of Labor, Bureau of Labor Statistics, December 2023, “Table 2. Civilian workers by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates are increased by 110 percent to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees.
We assume that burdens for managerial tasks take 5% of the time required for technical tasks because the typical tasks for managers are to review and approve reports. Clerical burdens are assumed to take 10% of the time required for technical tasks because the typical duties of clerical staff are to proofread the reports, make copies and maintain records.
Provide an estimate for the total annual cost burden to respondents or record keepers resulting from the collection of information. (Do not include the cost of any hour burden already reflected on the burden worksheet).
The cost estimate should be split into two components: (a) a total capital and start-up cost
component (annualized over its expected useful life) and (b) a total operation and maintenance and purchase of services component. The estimates should consider costs associated with generating, maintaining, and disclosing or providing the information. Include descriptions of methods used to estimate major cost factors including system and technology acquisition, expected useful life of capital equipment, the discount rate(s), and the period over which costs will be incurred. Capital and start-up costs include, among other items, preparations for collecting information such as purchasing computers and software; monitoring, sampling, drilling, and testing equipment; and record storage facilities.
If cost estimates are expected to vary widely, agencies should present ranges of cost burdens and explain the reasons for the variance. The cost of purchasing or contracting out information collections services should be a part of this cost burden estimate.
Generally, estimates should not include purchases of equipment or services, or portions thereof, made: (1) prior to October 1, 1995, (2) to achieve regulatory compliance with requirements not associated with the information collection, (3) for reasons other than to provide information or keep records for the government, or (4) as part of customary and usual business or private practices.
The only type of industry costs associated with the information collection activity in the regulations are labor costs. There are no capital/startup or operation and maintenance costs.
Provide estimates of annualized costs to the Federal government. Also, provide a description of the method used to estimate cost, which should include quantification of hours, operational expenses (such as equipment, overhead, printing, and support staff), and any other expense that would not have been incurred without this collection of information.
14a. Agency Activities
The EPA conducts the following activities in connection with the acquisition, analysis, storage, and distribution of the required information:
• Review notifications and reports, including performance test reports, and excess emissions reports, required to be submitted by industry.
• Audit facility records.
• Input, analyze, and maintain data in the Enforcement and Compliance History Online (ECHO) and ICIS.
Following notification of startup, the reviewing authority could inspect the source to determine whether the pollution control devices are properly installed and operated. Performance test reports are used by the Agency to discern a source’s initial capability to comply with the emission standard, and note the operating conditions under which compliance was achieved. Data and records maintained by the respondents are tabulated and published for use in compliance and enforcement programs. The semiannual reports are used for problem identification, as a check on source operation and maintenance, and for compliance determinations.
Information contained in the reports is reported by state and local governments in the ICIS Air database, which is operated and maintained by EPA's Office of Compliance. EPA uses ICIS for tracking air pollution compliance and enforcement by local and state regulatory agencies, EPA regional offices and EPA headquarters. EPA and its delegated Authorities can edit, store, retrieve and analyze the data.
14b. Agency Labor Cost
The ‘burden’ to the Federal Government is attributed entirely to work performed by either Federal employees or government contractors. The only costs to the Agency are those costs associated with analysis of the reported information. The EPA's overall compliance and enforcement program includes such activities as the examination of records maintained by the respondents, periodic inspection of sources of emissions, and the publication and distribution of collected information. The average annual Agency burden and cost during the three years of the ICR is estimated to be 37 hours at a cost of $2,050. See Table 2: Average Annual EPA Burden and Cost – NSPS for Ammonium Sulfate Manufacturing Plants (40 CFR Part 60, Subpart PP) (Renewal).
This cost is based on the average hourly labor rate as follows:
Managerial $76.91 (GS-13, Step 5, $48.07 + 60%)
Technical $57.07 (GS-12, Step 1, $35.67 + 60%)
Clerical $30.88 (GS-6, Step 3, $19.30+ 60%)
These rates are from the Office of Personnel Management (OPM), 2024 General Schedule, which excludes locality, rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees. Details upon which this estimate is based appear at the end of this document in Table 2: Average Annual EPA Burden and Cost – NSPS for Ammonium Sulfate Manufacturing Plants (40 CFR Part 60, Subpart PP) (Renewal).
14c. Agency Non-Labor Costs
There are no non-labor costs to the Agency associated with this information collection.
REASONS FOR CHANGE IN BURDEN
Explain the reasons for any program changes or adjustments reported in the burden or capital/O&M cost estimates.
There is no change in burden from the most recently approved ICR as currently identified in the OMB Inventory of Approved Burdens. This is due to two considerations. First, the regulations have not changed over the past three years and are not anticipated to change over the next three years. Second, the growth rate for this industry is very low or non-existent, so there is no significant change in the overall burden. Since there are no changes in the regulatory requirements and there is no significant industry growth, there are also no changes in the capital/startup or operation and maintenance (O&M) costs. There is a slight increase in costs, which is wholly due to the use of updated labor rates. This ICR uses labor rates from the most recent Bureau of Labor Statistics report (December 2023) to calculate respondent burden costs.
For collections of information whose results will be published, outline plans for tabulation and publication. Address any complex analytical techniques that will be used. Provide the time schedule for the entire project, including beginning and ending dates of the collection of information, completion of report, publication dates, and other actions.
Although this rule does not require electronic reporting, respondents could choose to submit notifications or reports electronically. All non-CBI data submitted electronically to the Agency through CEDRI are available to the public for review and printing and are accessible using WebFIRE. Electronically submitted emissions data from performance testing or performance evaluations using the Electronic Reporting Tool or templates attached to CEDRI, as well as data from reports from regulations with electronic templates, are tabulated; data submitted as portable document format (PDF) files attached to CEDRI are neither tabulated nor subject to complex analytical techniques. Electronically submitted emissions data used to develop emissions factors undergo complex analytical techniques and the draft emissions factors are available on the Clearinghouse for Inventories and Emission Factors listserv at https://www.epa.gov/chief/chief-listserv for public review and printing. Electronically submitted emissions data, as well as other data, obtained from one-time or sporadic information collection requests often undergo complex analytical techniques; results of those activities are included in individual rulemaking dockets and are available at https://www.regulations.gov/ for public review and printing.
DISPLAY OF EXPIRATION DATE
If seeking approval to not display the expiration date for OMB approval of the information collection, explain the reasons that display would be inappropriate.
EPA will display the expiration date for OMB approval of the information collection.
Explain each exception to the topics of the certification statement identified in “Certification for Paperwork Reduction Act Submissions.”
There are no exceptions to the topics of the certification statement.
Table 1: Annual Respondent Burden and Cost – NSPS for Ammonium Sulfate Manufacturing Plants (40 CFR Part 60, Subpart PP) (Renewal)
Burden Items |
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
Respondent Hours per Occurrence |
Number of Occurrences per Respondent per Year |
Hours per Respondent per Year (A x B) |
Number of Respondents per Year a |
Technical Hours per Year (C x D) |
Management
Hours per Year |
Clerical Hours per Year (Ex0.1) |
Total Labor Costs per Year, $b |
||
1. Applications |
N/A |
|
|
|
|
|
|
|
|
2. Survey and Studies |
N/A |
|
|
|
|
|
|
|
|
3. Reporting Requirements |
|
|
|
|
|
|
|
|
|
A. Read and understand rule requirements c |
1 |
1 |
1 |
2 |
2 |
0.1 |
0.2 |
$315.01 |
|
New Sources |
|
|
|
|
|
|
|
|
|
B. Required Activities |
|
|
|
|
|
|
|
|
|
Initial performance test |
|
|
|
|
|
|
|
|
|
Ref Method 9 tests d |
29.7 |
4 |
118.8 |
0 |
0 |
0 |
0 |
$0 |
|
Ref Method 5 d |
4 |
1 |
4 |
0 |
0 |
0 |
0 |
$0 |
|
Repeat performance test e |
4 |
0.2 |
0.8 |
0 |
0 |
0 |
0 |
$0 |
|
Existing sources |
|
|
|
|
|
|
|
|
|
Monitoring of operations and emissions |
See 4E |
|
|
|
|
|
|
|
|
C. Create Information |
See 3B |
|
|
|
|
|
|
|
|
D. Gather Existing Information |
See 3E |
|
|
|
|
|
|
|
|
E. Write Report |
|
|
|
|
|
|
|
|
|
New Sources |
|
|
|
|
|
|
|
|
|
Notification of construction/ reconstruction |
2 |
1 |
2 |
0 |
0 |
0 |
0 |
$0 |
|
Notification of actual startup |
2 |
1 |
2 |
0 |
0 |
0 |
0 |
$0 |
|
Notification of initial performance test |
2 |
1 |
2 |
0 |
0 |
0 |
0 |
$0 |
|
Notification of demonstration of CMS |
2 |
1 |
2 |
0 |
0 |
0 |
0 |
$0 |
|
Report of initial performance test |
See 3B |
|
|
|
|
|
|
|
|
Existing Sources |
|
|
|
|
|
|
|
|
|
Notification of operational change |
2 |
1 |
2 |
0 |
0 |
0 |
0 |
$0 |
|
Semiannual reports f |
16 |
2 |
32 |
2 |
64 |
3.2 |
6.4 |
$10,080.42 |
|
Subtotal for Reporting Requirements |
|
|
|
|
76 |
$10,395 |
|||
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
A. Read and understand rule requirements |
See 3A |
|
|
|
|
|
|
|
|
B. Plan activities |
See 3B |
|
|
|
|
|
|
|
|
C. Implement activities |
See 3B |
|
|
|
|
|
|
|
|
D. Develop record system |
N/A |
|
|
|
|
|
|
|
|
E. Time to enter records of operating parameters g |
0.25 |
365 |
91.25 |
2 |
182.5 |
9.13 |
18.25 |
$28,744.94 |
|
F. Audits |
N/A |
|
|
|
|
|
|
|
|
Subtotal for Recordkeeping Requirements |
|
|
|
|
210 |
$28,745 |
|||
Total Labor Burden and Costs (rounded) h |
|
|
|
|
286 |
$39,100 |
|||
Total Capital and O&M Costs (rounded) h |
|
|
|
|
|
|
|
$0 |
|
Grand Total (rounded)h |
$39,100 |
||||||||
|
|
|
|
|
|
|
|
|
|
Assumptions: |
|||||||||
a. We have assumed that there are approximately 2 respondents subject to the rule, with no new sources expected over the next three-years of this ICR. |
|||||||||
b. This ICR uses the following labor rates: $172.41 per hour for Executive, Administrative, and Managerial labor; $141.75 per hour for Technical labor, and $71.36 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, December 2023, “Table 2. Civilian workers by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates are increased by 110 percent to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees. |
|||||||||
c. We assumed that each respondent will spend one hour each year to read and understand the rule requirements. |
|||||||||
d. As specified in the general provisions each performance test shall consist of three separate runs using the applicable test method. Sources are required to use Method 9 published in the 11th edition of the Official Methods of analysis of the Association of Official analytical Chemists dates 1970. Each run shall be conducted for the time and under the conditions specified in the applicable rule. The particulate matter concentration and volumetric flow rate of the effluent gas shall be determined by Method 5 which requires a sampling time and a sample volume for each run of at least 60 minutes and 1.50 dscm (53 dscf). Since there are no new respondents estimated, these requirements do not apply. |
|||||||||
e. We assume that 20 percent of initial performance tests must be repeated due to failure. Since there are no new respondents estimated, these requirements do not apply. |
|||||||||
f. We have assumed that it will take each respondent 16 hours twice per year to complete the semiannual reports. |
|||||||||
g. Sources are required to maintain a daily record of operating parameters. We assume records will be recorded 365 days per year. |
|||||||||
h. Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
|||||||||
Table 2: Average Annual EPA Burden and Cost – NSPS for Ammonium Sulfate Manufacturing Plants (40 CFR Part 60, Subpart PP) (Renewal)
Burden Items |
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
EPA Hours per Occurrence |
Occurrences per Plant per Year |
EPA
Hours per Plant per Year |
Plants per Year a |
Technical
EPA Hours per Year |
Managerial
Hours per Year |
Clerical
Hours per Year |
Cost per year, $b |
|
Required Activities |
|
|
|
|
|
|
|
|
New Plant |
|
|
|
|
|
|
|
|
Initial performance tests c |
24 |
1 |
24 |
0 |
0 |
0 |
0 |
$0 |
Repeat performance tests d |
24 |
0.2 |
4.8 |
0 |
0 |
0 |
0 |
$0 |
Report Review |
|
|
|
|
|
|
|
|
New Plant |
|
|
|
|
|
|
|
|
Notification of construction |
2 |
1 |
2 |
0 |
0 |
0 |
0 |
$0 |
Notification of initial startup |
0.5 |
1 |
0.5 |
0 |
0 |
0 |
0 |
$0 |
Notification of actual startup |
0.5 |
1 |
0.5 |
0 |
0 |
0 |
0 |
$0 |
Notification of initial test |
0.5 |
1.2 |
0.6 |
0 |
0 |
0 |
0 |
$0 |
Review test results |
8 |
1.2 |
9.6 |
0 |
0 |
0 |
0 |
$0 |
Notification of demonstration of CMS |
0.5 |
1 |
0.5 |
0 |
0 |
0 |
0 |
$0 |
Existing Plants |
|
|
|
|
|
|
|
|
Semiannual reports e |
8 |
2 |
16 |
2 |
32 |
1.6 |
3.2 |
$2,048.11 |
Total Annual Burden and Cost (rounded) f |
|
|
|
|
37 |
$2,050 |
||
|
|
|
|
|
|
|
|
|
Assumptions: |
|
|
|
|
|
|
|
|
a. We have assumed that there are approximately 2 respondents subject to the rule, with no new sources expected over the next three-years of this ICR. |
||||||||
b. This cost is based on the average hourly labor rate as follows: Managerial $76.91 (GS-13, Step 5, $48.07 + 60%); Technical $57.07 (GS-12, Step 1, $35.67 + 60%); and Clerical $30.88 (GS-6, Step 3, $19.30+ 60%). This ICR assumes that Managerial hours are 5 percent of Technical hours, and Clerical hours are 10 percent of Technical hours. These rates are from the Office of Personnel Management (OPM), 2024 General Schedule, which excludes locality, rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees. |
||||||||
c. We assume that EPA personnel will attend initial performance tests. |
||||||||
d. We assume that 20 percent of initial performance test must be repeated due to failure. |
||||||||
e. We have assumed that it will take 8 hours to review each semiannual report. |
||||||||
f. Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
||||||||
Number of Respondents
|
Respondents That Submit Reports |
Respondents That Do Not Submit Any Reports |
|
||
|
(A) |
(B) |
(C) |
(D) |
(E) |
Year |
Number of New Respondents a |
Number of Existing Respondents |
Number of Existing Respondents that keep records but do not submit reports |
Number of Existing Respondents That Are Also New Respondents |
Number of Respondents (E=A+B+C-D) |
1 |
0 |
2 |
0 |
0 |
2 |
2 |
0 |
2 |
0 |
0 |
2 |
3 |
0 |
2 |
0 |
0 |
2 |
Average |
0 |
2 |
0 |
0 |
2 |
a New respondents include sources with constructed and reconstructed affected facilities. |
|
|
|||
Total Annual Responses
(A) |
(B) |
(C) |
(D) |
(E) |
|
|
Information Collection Activity |
Number of Respondents a |
Number of Responses |
Number of Existing Respondents That Keep Records But Do Not Submit Reports |
Total Annual Responses E=(BxC)+D |
|
|
Notification of construction/ reconstruction |
0 |
1 |
0 |
0 |
|
|
Notification of actual startup |
0 |
1 |
0 |
0 |
|
|
Notification of initial performance test |
0 |
1 |
0 |
0 |
|
|
Notification of demonstration of CMS |
0 |
1 |
0 |
0 |
|
|
Report of initial performance test |
0 |
1 |
0 |
0 |
|
|
Notification of operational change |
0 |
1 |
0 |
0 |
|
|
Semiannual report |
2 |
2 |
0 |
4 |
|
|
|
|
|
Total |
4 |
|
|
a We have assumed that there are approximately 2 respondents subject to the rule, with no new sources expected over the next three-years of this ICR. |
|
|||||
|
||||||
| File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document |
| File Title | 18Q Supporting Statement Instructions_draft |
| Author | McGrath, Daniel |
| File Modified | 0000-00-00 |
| File Created | 2025-11-26 |