Document
30-day notice
ICR 202607-1014-004 · OMB 1014-0034 · Object 175176700.
Document Viewer [pdf]
Status: Original and derived artifacts are available for this document.
Download: pdf
Loading document viewer…
Document Metadata
| File Type | application/pdf |
|---|---|
| File Title | 30-day notice |
| Last Modified By | govinfo, U. S. Government Publishing Office |
| File Modified | 2026-11-18 |
| File Created | 2026-11-18 |
| Conversion State | complete |
Extracted Text
Federal Register / Vol. 91, No. 221 / Wednesday, November 18, 2026 / Notices modifications. Upon issuance of this notice, the draft Directive will be available on DHS.gov at https:// www.dhs.gov/ocrso/eed/epb/nepa. Tracey L. Watkins, Chief Readiness Support Officer, Department of Homeland Security. [FR Doc. 2026–23515 Filed 11–17–26; 8:45 am] BILLING CODE 9112–FF–P DEPARTMENT OF THE INTERIOR Geological Survey [Docket No. USGS–FACA–2026; GX27GK009970000] Call for Nominations to the Advisory Committee on Landslides AGENCY: U.S. Geological Survey, Department of the Interior. ACTION: Call for Nominations. SUMMARY: The U.S. Geological Survey seeks nominations for individuals to be considered for current and future membership to serve on the Advisory Committee on Landslides (ACL). DATES: All nominations must be received no later than December 18, 2026. khammond on DSK9W7S144PROD with NOTICE ADDRESSES: Please email nominations to Dr. Jonathan Godt, Designated Federal Officer, Advisory Committee on Landslides, at [email protected]. FOR FURTHER INFORMATION CONTACT: Dr. Jonathan Godt, Landslide Hazards Program Coordinator and Designated Federal Officer, via email at jgodt@ usgs.gov, or by telephone at 303–905– 9468. Individuals in the United States who are deaf, deafblind, hard of hearing, or have a speech disability may dial 711 (TTY, TDD, or TeleBraille) to access telecommunications relay services. Individuals outside the United States should use the relay services offered within their country to make international calls to the point-ofcontact in the United States. SUPPLEMENTARY INFORMATION: The ACL is established under the National Landslide Preparedness Act (Pub. L. 116–323) and regulated by the Federal Advisory Committee Act, 5 U.S.C. Ch. 10. The ACL provides advice and recommendations to the Secretary of the Interior through the Interagency Coordinating Committee on Landslide Hazard on the implementation of the National Landslide Preparedness Act. The ACL will be composed of no fewer than 11 representative members and will meet 1–4 times per year. Members of the ACL will be individuals not employed by the VerDate Sep<11>2014 18:07 Nov 17, 2026 Jkt 271001 Federal Government who are qualified in landslide hazard and risk or related fields. The ACL membership will be representative of: • States, including State geological organizations; • territories, including territorial geological organizations; • Indian Tribes, including Tribal geological organizations; • research institutions and institutions of higher education qualified to provide advice regarding landslide hazard and risk reduction, and representing related scientific, architectural, engineering, and planning disciplines; • industry standards development organizations; and • State, territorial, local, and Tribal emergency management agencies. Selection of members will ensure a reasonable cross-section of views and expertise is represented on the ACL, including a range of geographies and communities impacted by landslide hazards in the United States. Each member will serve a term of up to 3 years with terms staggered to ensure continuity. Nominations received through this call may be used to fill current and future vacancies on the ACL. Members of the ACL serve without compensation. However, while away from their homes or regular places of business, ACL and subcommittee members engaged in ACL or subcommittee business that the Designated Federal Official approves may be allowed travel expenses, including per diem in lieu of subsistence, as authorized by 5 U.S.C. 5703, in the same manner as persons employed intermittently in Federal Government service. Nominations should include a resume that provides contact information and a description of the nominee’s qualifications that would enable the Department of the Interior to make an informed decision regarding the candidate’s suitability to serve on the ACL. Send nominations to the Designated Federal Officer at the email provided in ADDRESSES. Additional information about the ACL may be found online at: https://www.usgs.gov/ programs/landslide-hazards/advisorycommittee-landslides-acl. Authority: 5 U.S.C. Ch. 10. Matthew Arsenault, Information Management Specialist, USGS Records Officer. [FR Doc. 2026–23471 Filed 11–17–26; 8:45 am] BILLING CODE 4338–11–P PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 74187 DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs [278A2100DDAAKE200000/ A0A501010.000000] Indian Gaming; Extension of TribalState Class III Gaming Compact Between the Picayune Rancheria of Chukchansi Indians, California, and the State of California AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the extension of the Class III gaming compact between the Picayune Rancheria of Chukchansi Indians, California, and the State of California. DATES: The extension takes effect on November 18, 2026. FOR FURTHER INFORMATION CONTACT: Mr. Troy Woodward, Acting Director, Office of Indian Gaming, Office of the Assistant Secretary—Indian Affairs, Washington, DC 20240, IndianGaming@ bia.gov; (202) 219–4066. SUPPLEMENTARY INFORMATION: An extension to an existing Tribal-State Class III gaming compact does not require approval by the Secretary if the extension does not modify any other terms of the compact. 25 CFR 293.5. The Picayune Rancheria of Chukchansi Indians, California, and the State of California have reached an agreement to extend the expiration date of their existing Tribal-State Class III gaming compact to December 31, 2027. This publication provides notice of the new expiration date of the compact. William Henry Kirkland III, Assistant Secretary—Indian Affairs. [FR Doc. 2026–23404 Filed 11–17–26; 8:45 am] BILLING CODE 4337–15–P DEPARTMENT OF THE INTERIOR Marine Minerals Administration [Docket ID BSEE–2026–0034; EEAA021000 278E1700D2 ET1SF0000.EAQ000OMB Control Number 1014–0034] Agency Information Collection Activities; Submission to the Office of Management and Budget for Review and Approval; Renewable Energy and Alternate Uses of Existing Facilities on the Outer Continental Shelf AGENCY: Marine Minerals Administration, Interior. ACTION: Notice of Information Collection; request for comment. E:\FR\FM\18NON1.SGM 18NON1 74188 Federal Register / Vol. 91, No. 221 / Wednesday, November 18, 2026 / Notices SUMMARY: In accordance with the khammond on DSK9W7S144PROD with NOTICE Paperwork Reduction Act (PRA) of 1995, the Marine Minerals Administration (MMA) proposes to renew an information collection. DATES: Interested persons are invited to submit comments on or before December 18, 2026. ADDRESSES: Written comments and recommendations for the proposed information collection should be sent within 30 days of publication of this notice to www.reginfo.gov/public/do/ PRAMain. Find this particular information collection by selecting ‘‘Currently under 30-day Review—Open for Public Comments’’ or by using the search function. Please provide a copy of your comments to Kelly Odom, Deputy MMA ICCO, 45600 Woodland Road, Sterling, VA 20166; or by email to [email protected]. Please reference OMB Control Number 1014–0034 in the subject line of your comments. FOR FURTHER INFORMATION CONTACT: To request additional information about this ICR, contact Kelly Odom by email at [email protected], or by telephone at (703) 787–1775. Individuals in the United States who are deaf, deafblind, hard of hearing, or have a speech disability may dial 711 (TTY, TDD, or TeleBraille) to access telecommunications relay services. Individuals outside the United States should use the relay services offered within their country to make international calls to the point-ofcontact in the United States. You may also view the ICR at http:// www.reginfo.gov/public/do/PRAMain. SUPPLEMENTARY INFORMATION: Secretary’s Order 3451 established the Marine Minerals Administration (MMA), which replaced BSEE, and provided for a transition period during which existing MMA officials retain operational authority necessary for the uninterrupted accomplishment of its mission. That transition period is ongoing. Accordingly, this notice references both BSEE and MMA but is issued under the authority of the MMA. In accordance with the PRA and 5 CFR 1320.8(d)(1), we provide the general public and other Federal agencies with an opportunity to comment on new, proposed, revised, and continuing collections of information. This helps us assess the VerDate Sep<11>2014 18:07 Nov 17, 2026 Jkt 271001 impact of our information collection requirements and minimize the public’s reporting burden. It also helps the public understand our information collection requirements and provide the requested data in the desired format. A Federal Register notice with a 60day public comment period soliciting comments on this collection of information was published on April 2, 2026 [91 FR 16742]. We received one comment, but it was not germane to this information collection. As part of our continuing effort to reduce paperwork and respondent burdens, we are again soliciting comments from the public and other Federal agencies on the proposed ICR that is described below. We are especially interested in public comment addressing the following: (1) Whether or not the collection of information is necessary for the proper performance of the functions of the agency, including whether or not the information will have practical utility; (2) The accuracy of our estimate of the burden for this collection of information, including the validity of the methodology and assumptions used; (3) Ways to enhance the quality, utility, and clarity of the information to be collected; and (4) How might the agency minimize the burden of the collection of information on those who are to respond, including through the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology, e.g., permitting electronic submission of response. Comments that you submit in response to this notice are a matter of public record. Before including your address, phone number, email address, or other personal identifying information in your comment, you should be aware that your entire comment—including your personal identifying information—may be made publicly available at any time. While you can ask us in your comment to withhold your personal identifying information from public review, we cannot guarantee that we will be able to do so. Abstract: The authority for 30 CFR part 285, Renewable Energy and Alternate Uses of Existing Facilities on the Outer Continental Shelf, derives PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 from amendments to section 8 of the Outer Continental Shelf Lands Act (OCS Lands Act) (43 U.S.C. 1337), as set forth in section 388(a) of the Energy Policy Act of 2005 (EPAct) (Pub. L.109–58). The Secretary of the Interior delegated to the Marine Minerals Administration (MMA) the authority to regulate certain activities under section 388(a) of the EPAct. These regulations specifically apply to activities that: (a) Produce or support production, transportation, or transmission of energy from sources other than oil and gas; or (b) Use, for energy-related purposes or for other authorized marine-related purposes, facilities currently or previously used for activities authorized under the OCS Lands Act. MMA uses the information collected under 30 CFR part 285 to oversee facility design, fabrication, installation, and safety management systems; ensure the safety of operations, including inspection programs and incident reporting and investigations; enforce compliance with all applicable safety, environmental, and other laws and regulations through enforcement actions (such as noncompliance notices, cessation orders, and certain lease suspensions); and oversee decommissioning activities. Specifically, MMA needs the information to: • Enforce provisions under 30 CFR part 285, subpart D, various information submittal requirements under Subpart F, as well as provisions governing activities conducted under an approved plan, including the design, construction, operation, and decommissioning of facilities under Subparts G, H, and I. • Evaluate FDR and FIR for consistency with the Construction and Operations Plan (COP) and applicable engineering standards. • Maintain the decommissioning requirements related to rights-of-use and easement for alternate uses of existing OCS facilities (Alternate Use RUE). Title of Collection: 30 CFR 285, Renewable Energy and Alternate Uses of Existing Facilities on the Outer Continental Shelf. OMB Control Number: 1014–0034. Form Number(s): Form MMA–1835 Notice(s) of Noncompliance (NONCs) Form and E:\FR\FM\18NON1.SGM 18NON1 Federal Register / Vol. 91, No. 221 / Wednesday, November 18, 2026 / Notices 74189 Average number of annual responses Annual burden hours Reporting and recordkeeping requirement 1 Citations in 30 CFR 285 Hour burden Non-hour cost burdens Subpart A—General Provisions 102; 105; 110 .......................... These sections contain general references to submitting electronic comments, requests, applications, plans, notices, reports, and/or supplemental information for MMA approval—burdens covered under specific requirements. 103; 904; ................................. Request general departures not specifically covered elsewhere in part 285. .5 .............................. 6 requests ................ 3 105(c) ...................................... Make oral requests or notifications and submit written follow up within 3 business days not specifically covered elsewhere in part 285. 1 ............................... 2 requests ................ 2 111(b)(3); (b)(5); (b)(6) ........... Within 30 days of receiving bill, submit processing fee payments for MMA document or study preparation to process applications and other requests. .5 .............................. 2 submissions .......... 1 2 payments × $4,000 = $8,000 111(b)(2), (3) ........................... Submit comments on proposed processing fee or request approval to perform or directly pay contractors for all or part of any document, study, or other activity, to reduce MMA processing costs. 2 ............................... 2 requests ................ 4 111(b)(3) ................................. Perform, conduct, develop, etc., all or part of any document, study, or other activity; and provide results to MMA to reduce MMA processing fee. Pay processing fee for all or part of any document, study, or other activity, and provide results to MMA to reduce MMA processing costs. 6,000 ........................ 1 submission ............ 6,000 1 contractor payment × $950,000 = $950,000 111(b)(7) ................................. Appeal MMA estimated processing costs, decisions, or orders pursuant to 30 CFR 290. Exempt under 5 CFR 1320.4(a)(2), (c). 0 115 .......................................... Request approval to use later edition of a document incorporated by reference or alternative compliance. 1 ............................... 1 request .................. 1 116 .......................................... Respond to request for information in FR ............................... Requirement not considered IC under 5 CFR 1320.3(h)(4). 0 118 .......................................... Request appeal or request reconsideration of bid decision or rejection.. Requirement not considered IC under 5 CFR 1320.3(h)(9) 0 Subpart B—Reserved Subpart C—Reserved Subpart D—Lease and Grant Administration 400; 401; 402 NONCs ............ These sections contain references to information submissions, approvals, requests, applications, plans, payments, etc., the burdens for which are covered elsewhere in part 285. 0 401(b) ...................................... Take measures directed by MMA in cessation order and submit reports to resume activities. 100 ........................... 1 report .................... 100 417(b) ...................................... Conduct, and if required pay for, site-specific study to evaluate cause of harm or damage; and submit copies of study and results, in format specified. 110 ........................... 1 study/submission .. 110 437 .......................................... Provide information for reconsideration of MMA decision to contract or cancel lease or grant area. Requirement not considered IC under 5 CFR 1320.3(h)(9). 1 study × $950,000 = $950,000 0 Subpart E—Reserved Subpart F—Plans and Information Requirements khammond on DSK9W7S144PROD with NOTICE ** indicate the primary cites for Site Assessment Plans (SAPs), Construction and Operations Plans (COPs), and General Activities Plans (GAPs); and the burdens include any previous or subsequent references throughout part 285 to submission and approval. This subpart contains references to other information submissions, approvals, requests, applications, plans, etc., the burdens for which are covered elsewhere in part 285. 602 .......................................... Maintain, and provide to MMA if requested, all data and information related to compliance with required terms of lease, grant, reports submitted under this Part, and approved plans. 2 ............................... 9 records/submissions. 18 ** 614; 810 .............................. Submit copies of SAP, including required information to assist MMA to comply with NEPA/CZMA such as hazard info, air quality, SMS, and all required information, certifications, requests, etc., in format specified. 48 ............................. 2 SAPs ..................... 96 E:\FR\FM\18NON1.SGM 18NON1 VerDate Sep<11>2014 18:07 Nov 17, 2026 Jkt 271001 PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 74190 Federal Register / Vol. 91, No. 221 / Wednesday, November 18, 2026 / Notices Reporting and recordkeeping requirement 1 Citations in 30 CFR 285 Hour burden Average number of annual responses Annual burden hours Non-hour cost burdens ** 637(a), (b); 810 .................... If requesting an operations term for commercial lease, within time specified before the end of site assessment term, submit copies of COP, or FERC license application, including required information to assist MMA to comply with NEPA/CZMA such as hazard info, air quality, commissioning records, verification statements, CSSE, and all required information, surveys and/or their results, reports, certifications, project easements, supporting data and information, requests, etc., in format specified. 200 ........................... 2 COPs .................... 400 ** 641; 651; 810 ...................... Within time specified after issuance of a competitive lease or grant, or within time specified after determination of no competitive interest, submit copies of GAP, including required information to assist MMA to comply with NEPA/ CZMA such as hazard info, air quality, SMS, and all required information, surveys and reports, certifications, project easements, requests, etc., in format specified. 48 ............................. 2 GAPs .................... 96 ** 632(c); 907 .......................... Submit revised or modified COPs, including project easements, and all required additional information. 10 ............................. 1 revised or modified COP. 10 615; 800(b) .............................. Submit annual, or at other time periods as MMA determines, SAP compliance certification, effectiveness statement, recommendations, reports, supporting documentation, etc. 40 ............................. 4 certifications .......... 160 633; 800(b) .............................. Submit annual, or at other time periods as MMA determines, COP compliance certification, effectiveness statement, recommendations, reports, supporting documentation, etc. 45 ............................. 9 certifications .......... 405 636(a) ...................................... Notify MMA in writing no later than 30 days after commencing activities associated with placement of facilities on lease area. 1 ............................... 2 notices .................. 2 636(b) ...................................... Notify MMA in writing no later than 30 days after completion of construction and installation activities. 1 ............................... 2 notices .................. 2 636(c) ...................................... Notify MMA in writing at least 7 days before commencing commercial operations. 1 ............................... 1 notice .................... 1 637(c) ...................................... Notify MMA 10-business days after commencing commercial operations.. 1 ............................... 1 notice ................... 1 651 .......................................... Submit and demonstrate operational SMS identified in GAP before beginning construction of OCS facility, submit initial findings. 27.5 .......................... 2 notices .................. 55 653(a), (b); 800(b) ................... Submit annual, or at other time periods as MMA determines, GAP compliance certification, recommendations, reports, etc. 40 ............................. 4 certifications .......... 160 200 ........................... 1 report .................... 200 E:\FR\FM\18NON1.SGM 18NON1 G—Facility Design, Fabrication, and Installation *** indicate the primary cites for the reports discussed in this subpart, and the burdens include any previous or subsequent references throughout part 285 to submitting and obtaining approval. This subpart contains references to other information submissions, approvals, requests, applications, plans, etc., the burdens for which are covered elsewhere in part 285. khammond on DSK9W7S144PROD with NOTICE *** 700(a), (c), (e), (f), 701; 704. VerDate Sep<11>2014 Submit Facility Design Report (FDR), including copies of the cover letter, location plat, summaries, view drawings & structural drawings, summaries, design calculations, studies, descriptions, G&G reports, archaeological reports, verification statements w/justification, design standards, critical safety systems, location of records, and all or any additional required information (paper or electronic copies as specified). 18:07 Nov 17, 2026 Jkt 271001 PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 Federal Register / Vol. 91, No. 221 / Wednesday, November 18, 2026 / Notices 74191 Average number of annual responses Annual burden hours Reporting and recordkeeping requirement 1 Citations in 30 CFR 285 Hour burden Non-hour cost burdens *** 700(a), (c), (e), (f), 702; 704. Submit Fabrication and Installation Report (FIR), including copies of the cover letter, schedules, fabrication, and installation processes, permits, quality assurance, environmental info., commissioning procedures for CSSE, project easement, location plat, location of records, summaries, drawings, design calculations, studies, reports, and verification statements, and all or any additional required information, in format specified. 160 ........................... 1 report .................... 160 700(b) ..................................... Explain to MMA how all integrated asset packages will function together effectively and demonstrate such integration has been verified by CVA. 2 ............................... 5 ............................... 10 700(e); 705(a); 707(a); 712; 637. Certified Verification Agent (CVA) conducts independent assessment of the facility design and submits copies of all reports/certifications to lessee or grant holder and MMA— interim reports if required, in format specified. 100 ........................... 100 ........................... 1 interim report ......... 1 final report ............. 100 100 700(e); 705(a), (b); 707(b), (c); 708; 709; 710; 712;. CVA conducts independent assessments/inspections on the CSSE, fabrication and installation activities and items, informs lessee or grant holder if procedures are changed or design specifications are modified; and submits copies of all reports/verifications to lessee or grant holder and MMA—interim reports if required, in format specified, summaries, any additional information required/requested by MMA. 100 ........................... 100 ........................... 1 interim report ......... 1 final report ............. 100 100 *** 703; 705(a), (b); 712; 815(a). CVA/project engineer monitors major project modifications and repairs, including location of records, and submits copies of all Project Modification or Repair Reports, & verification statements to lessee or grant holder and MMA—interim reports if required, in format specified, summaries, any additional information required. 20 ............................. 15 ............................. 1 interim report ......... 1 final report ............. 20 15 705(c), (d) ............................... Request waiver of CVA requirement in writing; lessee must demonstrate design, fabrication, & installation of structures, standard design, best engineering practices, and major repair or major modification on your facility, include project engineer’s qualifications. 16 ............................. 1 waiver ................... 16 706 .......................................... Submit for approval with SAP, COP, or GAP, initial nominations for a CVA or new replacement CVA nomination and required information. 6.5 ............................ 2 nominations .......... 13 708(b) ...................................... Notify MMA if modifications identified by CVA/project engineer are accepted. 1 ............................... 1 notice .................... 1 709(a); 710 .............................. Make fabrication, quality control, methods, procedures, tolerances, testing, installation towing, and other records available to CVA/project engineer for review (retention required by § 285.714); verify, witness, survey, or check installation and commissioning of items; verify procedures, activities, installations, CSSE functions as designed, structural integrity, stability, ballast, and records. 1 ............................... 3 records .................. 3 714; 703(b) .............................. Until MMA releases financial assurance, compile, retain, and make available to MMA and/or CVA the as-built drawings, design assumptions/analyses, summary of fabrication and installation examination records, records of commissioning of critical safety systems, inspection results, and location of records of repairs not covered in inspection report. Record original and relevant material test results of all primary structural materials; retain records during all stages of construction.2 100 ........................... 1 lessee ................... 100 khammond on DSK9W7S144PROD with NOTICE H—Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted Under SAPs, COPs, and GAPs 802(a); 902(e) ......................... Notify MMA of archaeological resource within 72 hours of discovery. 3 ............................... 1 notice .................... 3 802(d) ...................................... If applicable, submit payment for MMA costs in carrying out National Historic Preservation Act responsibilities. .5 .............................. 1 payment ................ 1 E:\FR\FM\18NON1.SGM 18NON1 VerDate Sep<11>2014 18:07 Nov 17, 2026 Jkt 271001 PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 74192 Federal Register / Vol. 91, No. 221 / Wednesday, November 18, 2026 / Notices Reporting and recordkeeping requirement 1 Citations in 30 CFR 285 Hour burden Average number of annual responses Annual burden hours Non-hour cost burdens khammond on DSK9W7S144PROD with NOTICE Safety Management Systems 810; 614(b); 632(b); 651 ......... Use a Safety Management System for all activities conducted pursuant to a lease and make available to MMA upon request. Submit safety management system description with the SAP, COP, or GAP to MMA upon request. SMS must include, but not limited to, safety of personnel, remote monitoring, control, and shut down capabilities; emergency response procedures, fire suppression equipment, how and when you will test your SMS, ensure personnel are properly trained. 30 ............................. 2 submissions .......... 60 60 hours current +60 from rule = 120 812(b)(1) Form MMA–0187 ... Submit safety and environmental performance data (Form MMA–0187, Performance Measures Data—Renewable Energy). 82 ............................. 10 Forms ................. 820 812(b)(2) ................................. Provide report summary on SMS audit, corrective actions, and changes to SMS every 3 years. 5 ............................... 1 report ................... 5 813(b)(1) ................................. Report within 24 hours when any required equipment taken out of service for more than 12 hours; provide written confirmation if reported orally. .5 .............................. 1 ............................... 2 reports ................... 1 written confirmation 1 1 813(b)(3) ................................. Notify MMA when equipment returned to service; provide written confirmation if reported orally. .5 .............................. 2 notices .................. 1 815(a), (c) ............................... Submit comprehensive written report when required to analyze cable, P/L, or facility damage or failures to determine cause and as soon as available. 1.5 ............................ 1 report .................... 2 816 .......................................... Submit plan of corrective action plan on observed detrimental effects on cable, P/L, or facility within 30 days of discovery; take remedial action and submit report of remedial action within 30 days after completion. 2 ............................... 1 plan/report ............. 2 822 .......................................... Retain records of design, construction, operation, maintenance, repairs, and investigations on or related to lease or grant (any vessels engaged in activities authorized under this part) area; make available to MMA upon request. 1 ............................... 4 records retention ... 4 823 .......................................... Request reimbursement within 90 days for food, quarters, 2 ............................... and transportation provided to MMA reps during inspection. 1 request .................. 2 824(a) ...................................... Develop annual self-inspection plan covering all facilities; retain records and make available to MMA upon request. 24 ............................. 2 plans ..................... 48 824(b), (c) ............................... Conduct annual self-inspection of facilities and submit report by November 1, develop & retain summary reports for inspections, noting any failures, required maintenance or replacement of CSSE; 36 ............................. 2 reports ................... 72 825 .......................................... Based on API RP 2A–WSD, perform assessment of structures, initiate mitigation actions for structures that do not pass assessment process, retain information, and make available to MMA upon request. 60 ............................. .5 Oral ...................... 2 assessments/actions. 2 incidents ................ 120 1 830(a), (c); 831 thru 833 ......... Immediately report incidents to MMA via oral communications, submit written follow-up report within 15 business days after the incident, and submit any required additional information. 4 Written .................. 1 incident ................. 4 830(d) ...................................... Report oil spills as required by MMA 30 CFR 250.187(d) ...... VerDate Sep<11>2014 18:07 Nov 17, 2026 Jkt 271001 PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 Burden covered under MMA 1014–0007 E:\FR\FM\18NON1.SGM 18NON1 0 Federal Register / Vol. 91, No. 221 / Wednesday, November 18, 2026 / Notices 74193 Average number of annual responses Annual burden hours Reporting and recordkeeping requirement 1 Citations in 30 CFR 285 Hour burden Non-hour cost burdens I—Decommissioning **** indicate the primary cites for the reports discussed in this subpart, and the burdens include any previous or subsequent references throughout part 285 to submitting and obtaining approval. This subpart contains references to other information submissions, approvals, requests, applications, plans, etc., the burdens for which are covered elsewhere in parts 285. **** 902; 905, 906; 907; 908(b), (c); 909; 638(a). Submit for approval, in format specified, copies of the SAP, COP, or GAP decommissioning application and site clearance plan at least 2 years before decommissioning activities begin, 90 days after completion of activities, 90 days after cancellation, relinquishment, other termination of lease or grant, or 90 days after MMA determines facility no longer useful for operations, Include documentation of coordination efforts regarding requests that certain facilities remain in place for other activities, be converted to an artificial reef, or be toppled in place. Submit additional information/evidence requested or modify and resubmit application. 19 ............................. 1 application ............. 19 902(d); 908(a) ......................... Submit a decommissioning notice to MMA at least 60 days before commencing decommissioning activities including description of changes to approved removal methods and procedures in approved decommissioning application, including changes to types of vessels and equipment you will use; updated decommissioning schedule. 1 ............................... 1 notice .................... 1 910(b) ...................................... Within 60 days after removing a facility, verify to MMA that site is cleared. 1 ............................... 1 verification ............. 1 912 .......................................... Within 60 days after removing a facility, cable, or pipeline, submit a written report including summaries of removal activities, including date they were completed; descriptions of mitigation measures taken. 8 ............................... 1 report .................... 8 MMA does not anticipate decommissioning activities for at least 5 years, so the requirements have been given a minimal burden. Total Burden .................... 119 Responses ....... 9,802 Hours khammond on DSK9W7S144PROD with NOTICE $1,908,000 Non-Hour Costs Burdens MMA–0187, Performance Measures Data—Renewable Energy. Type of Review: Extension of a currently approved collection. Respondents/Affected Public: Primary respondents comprise Federal OCS companies that are lessees, designated operators, ROW or RUE grant holders subject to the reporting, and recordkeeping requirements under 30 CFR part 285. Other potential respondents are companies or State and local governments that submit information or comments relative to alternative energy-related uses of the OCS; certified verification agents; and surety or third-party guarantors. Total Estimated Number of Annual Respondents: Currently, there are approximately 35 entities pursuing renewable energy projects on the OCS. Not all the potential respondents would submit information at any given time, and some may submit multiple times. Total Estimated Number of Annual Responses: 119. Estimated Completion Time per Response: Varies from .5 hour to 6,000 hours, depending on activity. Total Estimated Number of Annual Burden Hours: 9,802. VerDate Sep<11>2014 18:07 Nov 17, 2026 Jkt 271001 Respondent’s Obligation: Most responses are mandatory. Frequency of Collection: Submissions are on occasion, monthly, annually, and biennially. Total Estimated Annual Nonhour Burden Cost: 1,908,000. An agency may not conduct, or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number. The authority for this action is the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Kirk Malstrom, Deputy Associate Director, Regulations and Standards Division. [FR Doc. 2026–23455 Filed 11–17–26; 8:45 am] BILLING CODE 4310–VH–P PO 00000 INTERNATIONAL TRADE COMMISSION [Investigation Nos. 701–TA–808 and 731– TA–1809 (Preliminary)] Amine Compounds From China; Determinations On the basis of the record 1 developed in the subject investigations, the United States International Trade Commission (‘‘Commission’’) determines, pursuant to the Tariff Act of 1930 (‘‘the Act’’), that there is a reasonable indication that an industry in the United States is materially injured by reason of imports of amine compounds from China, provided for in subheadings 2921.29.00, 2922.19.96, and 2934.99.90 of the Harmonized Tariff Schedule of the United States, that are alleged to be sold in the United States at less than fair value (‘‘LTFV’’) and imports of the subject merchandise from China that are 1 The record is defined in § 207.2(f) of the Commission’s Rules of Practice and Procedure (19 CFR 207.2(f)). Frm 00048 Fmt 4703 Sfmt 4703 E:\FR\FM\18NON1.SGM 18NON1