Document
2017 Construction General Permit – Appendix J
ICR 202607-2040-001 · OMB 2040-0004 · Object 171201700.
Document Viewer [pdf]
Status: Original and derived artifacts are available for this document.
Download: pdf
Loading document viewer…
Document Metadata
| File Type | application/pdf |
|---|---|
| File Title | 2017 Construction General Permit – Appendix J |
| Subject | The final 2017 CGP was signed on January 11, 2017 and takes effect on February 16, 2017. This final 2017 CGP replaces the previo |
| Keywords | 2017 cgp, construction general permit, construction stormwater |
| Author | US EPA, OW, OWM, Water Permits Division, Municipal Branch |
| Last Modified By | Acrobat PDFMaker 11 for Word |
| File Modified | 2017-02-10 |
| File Created | 2017-02-02 |
| Conversion State | complete |
Extracted Text
2017 Construction General Permit (CGP) Appendix J - Notice of Intent (NOI) Form and Instructions Part 1.4.1 requires you to use the NPDES eReporting Tool, or “NeT” system, to prepare and submit your NOI electronically. However, if the EPA Regional Office grants you a waiver to use a paper NOI form, and you elect to use it, you must complete and submit the following form. Page J-1 of 10 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, DC 20460 NOTICE OF INTENT FOR THE 2017 NPDES CONSTRUCTION GENERAL PERMIT NPDES FORM 3510-9 Form Approved. OMB No. 2040-0004 Submission of this Notice of Intent (NOI) constitutes notice that the operator identified in Section III of this form requests authorization to discharge pursuant to the NPDES Construction General Permit (CGP) permit number identified in Section II of this form. Submission of this NOI also constitutes notice that the operator identified in Section III of this form meets the eligibility requirements of Part 1.1 CGP for the project identified in Section IV of this form. Permit coverage is required prior to commencement of construction activity until you are eligible to terminate coverage as detailed in Part 8 of the CGP. To obtain authorization, you must submit a complete and accurate NOI form. Discharges are not authorized if your NOI is incomplete or inaccurate or if you were never eligible for permit coverage. Refer to the instructions at the end of this form. I. Approval to Use Paper NOI Form Have you been granted a waiver from electronic reporting from the Regional Office *? YES NO If yes, check which waiver you have been granted, , the name of the EPA Regional Office staff person who granted the waiver, and the date of approval: Waiver granted: The owner/operator’s headquarters is physically located in a geographic area (i.e., ZIP code or census tract) that is identified as under-served for broadband Internet access in the most recent report from the Federal Communications Commission. The owner/operator has issues regarding available computer access or computer capability. Name of EPA staff person that granted the waiver: / Date approval obtained: / * Note: You are required to obtain approval from the applicable Regional Office prior to using this paper NOI form. If you have not obtained a waiver, you must file this form electronically using the NPDES eReporting Tool (NeT). NPDES ID (EPA Use Only): II. Permit Information Master Permit Number: (see Appendix B of the CGP for the list of eligible permit numbers) III. Operator Information Operator Information Operator Name: Are you requesting coverage under this NOI as a “federal operator” as defined in Appendix A? YES NO Mailing Address: Street: City: State: ZIP Code: - County or Similar Government Division: Phone: - - Ext. E-mail: Operator Point of Contact Information: First Name, Middle Initial, Last Name: Title: NOI Preparer (Complete if NOI was prepared by someone other than the certifier): First Name, Middle Initial, Last Name: Organization: Phone: - - Ext. E-mail: EPA Form 3510-9 Page 1 of 8 IV. Project/Site Information Project/Site Name: Project/Site Address: Street/Location: City: State: - ZIP Code: County or Similar Government Subdivision: For the project/site you are seeking permit coverage, provide the following information: Latitude/Longitude (Use decimal degrees and specify method): Latitude: ___ ___. ___ ___ ___ ___° N (decimal degrees) Latitude/Longitude Data Source: Map GPS Longitude: ___ ___ ___. ___ ___ ___ ___° W (decimal degrees) Other _______________________ Horizontal Reference Datum: NAD 27 Is your project/site located in Indian country lands, or located on a property of religious or cultural significance to an Indian tribe? NAD 83 YES WGS 84 NO If yes, provide the name of the Indian tribe associated with the area of Indian country (including name of Indian reservation, if applicable), or if not in Indian country, provide the name of the Indian tribe associated with the property: Estimated Project Start Date: / / Estimated Area to be Disturbed (to the nearest quarter acre): Type of Construction Site (check all that apply): / Estimated Project Completion Date: . Single-Family Residential Institutional Multi-Family Residential Highway or Road Will there be demolition of any structure built or renovated before January 1, 1980? Utility YES Commercial NO YES Was the pre-development land use used for agriculture (see Appendix A for definition of “agricultural land”)? YES If yes, is your project an “emergency-related project” (see Appendix A)? Industrial Other If yes, do any of the structures being demolished have at least 10,000 square feet of floor space? Have earth-disturbing activities commenced on your project/site? / NO YES NO NO YES NO Have stormwater discharges from your project/site been covered previously under an NPDES permit? YES NO If yes, provide the NPDES ID ( if you had coverage under EPA’s 2012 CGP or the NPDES permit number if you had coverage under an EPA individual permit: V. Discharge Information By indicating “Yes” below, I confirm that I understand that the CGP only authorizes the allowable stormwater discharges in Part 1.2.1 and the allowable nonstormwater discharges listed in Part 1.2.2. Any discharges not expressly authorized in this permit cannot become authorized or shielded from liability under CWA section 402(k) by disclosure to EPA, state, or local authorities after issuance of this permit via any means, including the Notice of Intent (NOI) to be covered by the permit, the Stormwater Pollution Prevention Plan (SWPPP), during an inspection, etc. If any discharges requiring NPDES permit coverage other than the allowable stormwater and non-stormwater discharges listed in Parts 1.2.1 and 1.2.2 will be discharged, they must be covered under another NPDES permit. YES Does your project/site discharge stormwater into a Municipal Separate Storm Sewer System (MS4)? Are there any waters of the U.S. within 50 feet of your project’s earth disturbances? EPA Form 3510-9 YES YES NO NO Page 2 of 9 Receiving Waters Information: (Attach a separate list if necessary) Point of Discharge ID For each point of discharge, provide the following receiving water information: Provide the name of the first water of the U.S. that receives stormwater If the receiving water is impaired (on directly from the point of discharge the CWA 303(d) list), list the pollutants and/or from the MS4 that the point of that are causing the impairment: discharge discharges to: If a TMDL been completed for this receiving waterbody, providing the following information: TMDL Name and ID: Pollutant(s) for which there is a TMDL: TMDL Name and ID: Pollutant(s) for which there is a TMDL: TMDL Name and ID: Pollutant(s) for which there is a TMDL: TMDL Name and ID: Pollutant(s) for which there is a TMDL: EPA Form 3510-9 Page 3 of 9 TMDL Name and ID: Pollutant(s) for which there is a TMDL: TMDL Name and ID: Pollutant(s) for which there is a TMDL: Are any of the waters of the U.S. to which you discharge designated by the state or tribal authority under its antidegradation policy as a Tier 2 (or Tier 2.5) water (water quality exceeds levels necessary to support propagation of fish, shellfish, and wildlife and recreation in and on the water) or as a Tier 3 water (Outstanding National Resource Water)? (See Appendix F). YES NO If yes, name(s) of receiving water(s) and its designation (Tier 2, Tier 2.5 or Tier 3): VI. Chemical Treatment Information Will you use polymers, flocculants, or other treatment chemicals at your construction site? If yes, will you use cationic treatment chemicals at your construction site*? YES YES NO NO If yes, have you been authorized to use cationic treatment chemicals by your applicable EPA Regional Office in advance of filing your NOI*? YES NO If you have been authorized to use cationic treatment chemicals by your applicable EPA Regional Office, attach a copy of your authorization letter and include documentation of the appropriate controls and implementation procedures designed to ensure that your use of cationic treatment chemicals will not lead to a violation of water quality standards. Please indicate the treatment chemicals that you will use: * Note: You are ineligible for coverage under this permit unless you notify your applicable EPA Regional Office in advance and the EPA office authorizes coverage under this permit after you have included appropriate controls and implementation procedures designed to ensure that your use of cationic treatment chemicals will not lead to a violation of water quality standards. VII. Stormwater Pollution Prevention Plan (SWPPP) Information Has the SWPPP been prepared in advance of filing this NOI, as required? YES NO SWPPP Contact Information: First Name, Middle Initial Last Name: Professional Title: Phone: - - Ext. E-mail: EPA Form 3510-9 Page 4 of 9 VIII. Endangered Species Protection Using the instructions in Appendix D of the CGP, under which criterion listed below are you eligible for coverage under this permit? Check only 1 box, include the required information and provide a sound basis for supporting the criterion selected. You must consider Endangered Species Act listed threatened or endangered species (ESA-listed) and/or designated critical habitat(s) under the jurisdiction of both the U.S. Fish and Wildlife Service (USFWS) and National Marine Fisheries Service (NMFS) and select the most conservative criterion that applies. A No ESA-listed species and/or designated critical habitat present in action area. Using the process outlined in Appendix D of this permit, you certify that ESA-listed species and designated critical habitat(s) under the jurisdiction of the USFWS or NMFS are not likely to occur in your site’s “action area” as defined in Appendix A of this permit. [Basis statement content: A basis statement supporting the selection of this criterion should identify the USFWS and NMFS information sources used. Attaching aerial image(s) of the site to this NOI is helpful to EPA, USFWS, and NMFS in confirming eligibility under this criterion. Please Note: NMFS’ jurisdiction includes ESA-listed marine and estuarine species that spawn in inland rivers.] B Eligibility requirements met by another operator under the 2017 CGP. The construction site’s discharges and discharge-related activities were already addressed in another operator’s valid certification of eligibility for your “action area” under eligibility Criterion A, C, D, E, or F of the 2017 CGP and you have confirmed that no additional ESA-listed species and/or designated critical habitat under the jurisdiction of USFWS and/or NMFS not considered in the that certification may be present or located in the “action area.” To certify your eligibility under this criterion, there must be no lapse of NPDES permit coverage in the other CGP operator’s certification. By certifying eligibility under this criterion, you agree to comply with any conditions upon which the other CGP operator's certification was based. You must include in your NOI the NPDES ID from the other 2017CGP operator’s notification of authorization under this permit. If your certification is based on another 2017 CGP operator’s certification under criterion C, you must provide EPA with the relevant supporting information required of existing dischargers in criterion C in your NOI form. [Basis statement content: A basis statement supporting the selection of this criterion should identify the eligibility criterion of the other CGP NOI, the authorization date, and confirmation that the authorization is effective.] If you select criterion B, provide the NPDES ID from the other operator’s notification of authorization under this permit: C Discharges not likely to adversely affect ESA-listed species and/or designated critical habitat. ESA-listed species and/or designated critical habitat(s) under the jurisdiction of the USFWS and/or NMFS are likely to occur in or near your site’s “action area,” and you certify to EPA that your site’s discharges and discharge-related activities are not likely to adversely affect ESA-listed threatened or endangered species and/or designated critical habitat. This certification may include consideration of any stormwater controls and/or management practices you will adopt to ensure that your discharges and discharge-related activities are not likely to adversely affect ESA-listed species and/or designated critical habitat. To certify your eligibility under this criterion, indicate 1) the ESA-listed species and/or designated habitat located in your “action area” using the process outlined in Appendix D of this permit; 2) the distance between the site and the listed species and/or designated critical habitat in the action area (in miles); and 3) a rationale describing specifically how adverse effects to ESA-listed species will be avoided from the discharges and discharge-related activities. You must also include a copy of your site map from your SWPPP showing the upland and in-water extent of your “action area” with this NOI. [Basis statement content: A basis statement supporting the selection of this criterion should identify the information resources and expertise (e.g., state or federal biologists) used to arrive at this conclusion. Any supporting documentation should explicitly state that both ESA-listed species and designated critical habitat under the jurisdiction of the USFWS and/or NMFS were considered in the evaluation.] What ESA-listed species and/or designated critical habitat are located in your “action area”: Distance between your site and the ESA-listed species and/or designated critical habitat within the action area (in miles, state “on site” if the ESAlisted species and/or designated critical habitat is within the area to be disturbed): D Coordination with USFWS and/or NMFS has successfully concluded. Coordination between you and the USFWS and/or NMFS has concluded. The coordination must have addressed the effects of your site’s discharges and discharge-related activities on ESA-listed species and/or designated critical habitat under the jurisdiction of USFWS and/or NMFS, and resulted in a written concurrence from USFWS and/or NMFS that your site’s discharges and discharge-related activities are not likely to adversely affect listed species and/or critical habitat. You must include copies of the correspondence with the participating agencies in your SWPPP and this NOI. [Basis statement content: A basis statement supporting the selection of this criterion should identify whether USFWS or NMFS or both agencies participated in coordination, the field office/regional office(s) providing that coordination, and the date that coordination concluded.] E ESA Section 7 consultation has successfully concluded. Consultation between a Federal Agency and the USFWS and/or NMFS under section 7 of the ESA has concluded. The consultation must have addressed the effects of the construction site’s discharges and discharge-related activities on ESAlisted species and/or designated critical habitat under the jurisdiction of USFWS and/or NMFS. To certify eligibility under this criterion, Indicate the result of the consultation: biological opinion from USFWS and/or NMFS that concludes that the action in question (taking into account the effects of your site’s discharges and discharge-related activities) is not likely to jeopardize the continued existence of listed species, nor the destruction or adverse modification of critical habitat; or written concurrence from USFWS and/or NMFS with a finding that the site’s discharges and discharge-related activities are not likely to adversely affect ESA-listed species and/or designated critical habitat. You must include copies of the correspondence between yourself and the USFWS and/or NMFS in your SWPPP and this NOI. [Basis statement content: A basis statement supporting the selection of this criterion should identify the federal action agencie(s) involved, the field office/regional office(s) providing that consultation, any tracking numbers of identifiers associated with that consultation (e.g., IPaC number, PCTS number), and the date the consultation was completed.] EPA Form 3510-9 Page 5 of 9 F Issuance of section 10 permit. Potential take is authorized through the issuance of a permit under section 10 of the ESA by the USFWS and/or NMFS, and this authorization addresses the effects of the site’s discharges and discharge-related activities on ESA-listed species and designated critical habitat. You must include copies of the correspondence between yourself and the participating agencies in your SWPPP and your NOI. [Basis statement content: A basis statement supporting the selection of this criterion should identify whether USFWS or NMFS or both agencies provided a section 10 permit, the field office/regional office(s) providing permit(s), any tracking numbers of identifiers associated with that consultation (e.g., IPaC number, PCTS number), and the date the permit was granted.] Provide a brief summary of the basis for criterion selection listed above [the necessary content for a supportive basis statement is provided under the criterion you selected.]. IX. Historic Preservation Are you installing any stormwater controls as described in Appendix E that require subsurface earth disturbance? (Appendix E, Step 1) YES NO If yes, have prior surveys or evaluations conducted on the site have already determined historic properties do not exist, or that prior disturbances have precluded the existence of historic properties? (Appendix E, Step 2) YES NO If no, have you determined that your installation of subsurface earth-disturbing stormwater controls will have no effect on historic properties? (Appendix E, Step 3) YES NO If no, did the SHPO, THPO, or other tribal representative (whichever applies) respond to you within the 15 calendar days to indicate whether the subsurface earth disturbances caused by the installation of stormwater controls affect historic properties? (Appendix E, Step 4) YES NO If yes, describe the nature of their response: Written indication that no historic properties will be affected by the installation of stormwater controls. Written indication that adverse effects to historic properties from the installation of stormwater controls can be mitigated by agreed upon actions. No agreement has been reached regarding measures to mitigate effects to historic properties from the installation of stormwater controls. Other: X. Certification Information I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I have no personal knowledge that the information submitted is other than true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. First Name, Middle Initial, Last Name: Title: Signature: Date: / / Email: EPA Form 3510-9 Page 6 of 9 Instructions for Completing EPA Form 3510-9 Notice of Intent for the 2017 NPDES Construction General Permit NPDES Form Date (2/17) This Form Replaces Form 3510-9 (02/12) Who Must File an NOI Form Under the provisions of the Clean Water Act, as amended (33 U.S.C. 1251 et. seq.; the Act), federal law prohibits stormwater discharges from certain construction activities to waters of the U.S. unless that discharge is covered under a National Pollutant Discharge Elimination System (NPDES) permit. Operators of construction sites where one or more acres are disturbed, smaller sites that are part of a larger common plan of development or sale where there is a cumulative disturbance of at least one acre, or any other site specifically designated by the Director, must obtain coverage under an NPDES general permit. For coverage under the 2017 CGP, each person, firm, public organization, or any other entity that meets either of the following criteria must file a Notice of Intent form: (1) they have operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications; or (2) they have day-to-day operational control of those activities at the project necessary to ensure compliance with the permit conditions. If you have questions about whether you need a NPDES stormwater permit, or if you need information to determine whether EPA or your state agency is the permitting authority, contact your EPA Regional Office. Completing the Form Obtain and read a copy of the 2017 CGP, viewable at https://www.epa.gov/npdes/stormwater-dischargesconstruction-activities#cgp. To complete this form, type or print uppercase letters, in the appropriate areas only. Please place each character between the marks (abbreviate if necessary to stay within the number of characters allowed for each item). Use one space for breaks between words, but not for punctuation marks unless they are needed to clarify your response. If you have any questions on this form, telephone EPA’s NOI Processing Center at (866) 352-7755. Please submit the original document with signature in ink - do not send a photocopied signature. Section I. Approval to Use Paper NOI Form You must indicate whether you have been granted a waiver from electronic reporting from the EPA Regional Office. Note that you are not authorized to use this paper NOI form unless the EPA Regional Office has approved its use. Where you have obtained approval to use this form, indicate the waiver that you have been granted, the name of the EPA staff person who granted the waiver, and the date that approval was provided. See https://www.epa.gov/npdes/contact-usstormwater#regional for a list of EPA Regional Office contacts. Section II. Permit Number Provide the master permit number of the permit under which you are applying for coverage (see Appendix B of the general permit for the list of eligible master permit numbers) Section III. Operator Information Provide the legal name of the person, firm, public organization, or any other entity that operates the project described in this NOI. Refer to Appendix A of the permit for the definition of “operator”. Indicate whether you are seeking coverage under this permit as a “federal operator” as defined in Appendix A. EPA Form 3510-9 Form Approved OMB No. 2040-0004 Also provide a point of contact, the operator’s mailing address, county, telephone number, and e-mail address (to be notified via e-mail of NOI approval when available). Correspondence for the NOI will be sent to this address. If the NOI was prepared by someone other than the certifier (for example, if the NOI was prepared by the facility SWPPP contact or a consultant for the certifier’s signature), include the full name, organization, phone number, and email address of the NOI preparer. Section IV. Project/Site Information Enter the official or legal name and complete street address, including city, state, ZIP code, and county or similar government subdivision of the project or site. If the project or site lacks a street address, indicate the general location of the site (e.g., Intersection of State Highways 61 and 34). Complete site information must be provided for permit coverage to be granted. Provide the latitude and longitude of your facility in decimal degrees format. The latitude and longitude of your facility can be determined in several different ways, including through the use of global positioning system (GPS) receivers, U.S. Geological Survey (U.S.G.S.) topographic or quadrangle maps, and web-based siting tools, among others. For consistency, EPA requests that measurements be taken from the approximate center of the construction site. For linear construction sites, the measurement should be taken midpoint of the site. If known, enter the horizontal reference datum for your latitude and longitude. The horizontal reference datum is shown on the bottom left corner of USGS topographic maps; it is also available for GPS receivers. Indicate whether the project is in Indian country lands or located on a property of religious or cultural significance to an Indian tribe, and if so, provide the name of the Indian tribe associated with the area of Indian country (including name of Indian reservation, if applicable), or if not in Indian country, provide the name of the Indian tribe associated with the property. Enter the estimated construction start and completion dates using four digits for the year (i.e., 10/06/2012). Indicate to the nearest quarter acre the estimated area to be disturbed. Indicate the type of construction site, if demolition is occurring, and if so, if the structure has at least 10,000 square feet of floor space. Indicate whether the pre-development land use of the site was used for agriculture Appendix A defines “agricultural land” as cropland, grassland, rangeland, pasture, and other agricultural land, on which agricultural and forest-related products or livestock are produced and resource concerns may be addressed. Agricultural lands include cropped woodland, marshes, incidental areas included in the agricultural operation, and other types of agricultural land used for the production of livestock. Indicate whether earth-disturbing activities have already commenced on your project/site. If earth-disturbing activities have commenced on your site because stormwater discharges from the site have been previously covered under a NPDES permit, you must provide the 2012 CGP NPDES ID or the NPDES permit number if coverage was under an individual permit. Section V. Discharge Information You must confirm that you understand that the CGP only authorizes the allowable stormwater discharges listed in Part 1.2.1 and the allowable non-stormwater discharges listed in Part 1.2.2. Page 7 of 9 Instructions for Completing EPA Form 3510-9 Notice of Intent for the 2017 NPDES Construction General Permit NPDES Form Date (2/17) This Form Replaces Form 3510-9 (02/12) Any discharges not expressly authorized under the CGP are not covered by the CGP or the permit shield provision of the CWA Section 402(k) and they cannot become authorized or shielded by disclosure to EPA, state, or local authorities via the NOI to be covered by the permit or by any other means (e.g., in the SWPPP or during an inspection). If any discharges requiring NPDES permit coverage other than the allowable stormwater and nonstormwater discharges listed in Parts 1.2.1 and 1.2.2 will be discharged, they must either be eliminated or covered under another NPDES permit. Indicate whether discharges from the site will enter into a municipal separate storm sewer system (MS4), as defined in Appendix A. Also, indicate whether any waters of the U.S. exist within 50 feet from your site. Note that if “yes”, you are required to comply with the requirement in Part 2.2.1 of the permit to provide natural buffers or equivalent erosion and sediment controls. For each unique point of discharge you list, you must specify the name of the first water of the U.S. that receives stormwater directly from the point of discharge and/or from the MS4 that the point of discharge discharges to. You must specify whether any waters of the U.S. that you discharge to are listed as ”impaired” as defined in Appendix A, and the pollutants for which the water is impaired. You must identify any Total Maximum Daily Loads (TMDL) that have been completed for any of the waters of the U.S. that you discharge to. Indicate whether discharges from the site will enter into a water of the U.S. that is designated as a Tier 2, Tier 2.5, or Tier 3 water. A list of Tier 2, 2.5, and 3 waters is provided as Appendix F. If the answer is “yes”, name all waters designated as Tier 2, Tier 2.5, or Tier 3 to which the site will discharge. Section VI. Chemical Treatment Information Indicate whether the site will use polymers, flocculants, or other treatment chemicals. Indicate whether the site will employ cationic treatment chemicals. If the answer is “yes” to either question, indicate which chemical(s) you will use. Note that you are not eligible for coverage under this permit to use cationic treatment chemicals unless you notify your applicable EPA Regional Office in advance and the EPA office authorizes coverage under this permit after you have included appropriate controls and implementation procedures designed to ensure that your use of cationic treatment chemicals will not lead to a violation of water quality standards. If you have been authorized to use cationic treatment chemicals by your applicable EPA Regional Office, attach a copy of your authorization letter and include documentation of the appropriate controls and implementation procedures designed to ensure that your use of cationic treatment chemicals will not lead to a violation of water quality standards. Examples of cationic treatment chemicals include, but are not limited to, cationic polyacrylamide (C-PAM), PolyDADMAC (POLYDIALLYLDIMETHYLAMMONIUM CHLORIDE), and chitosan. Section VII. Stormwater Pollution Prevention Plan (SWPPP) Information All sites eligible for coverage under this permit are required to prepare a SWPPP in advance of filing the NOI, in accordance with Part 7. Indicate whether the SWPPP has been prepared in advance of filing the NOI. EPA Form 3510-9 Form Approved OMB No. 2040-0004 Indicate the street, city, state, and ZIP code where the SWPPP can be found. Indicate the contact information (name, organization, phone, and email) for the person who developed the SWPPP for this project. Section VIII. Endangered Species Information Using the instructions in Appendix D, indicate under which criterion (i.e., A, B, C, D, E, or F) of the permit the applicant is eligible with regard to protection of ESA-listed endangered and threatened species and designated critical habitat. A description of the basis for the criterion selected must also be provided. If criterion B is selected, provide the NPDES Number for the other operator who had previously certified their eligibility for the CGP under criterion A, C, D, E, or F. The Tracking Number was assigned when the operator received coverage under this permit, and is included in the notice of authorization. If criterion C is selected, you must attach copies of your site map. See Part 7.2.4 of the permit for information about what is required to be in your site map. You must also specify the federally-listed species and/or federally-designated critical habitat that are located in the “action area” of the project, and provide the distance between the construction site and any listed endangered species and/or their designated critical habitat. If criterion D, E, or F is selected, attach copies of any communications between you and the U.S. Fish and Wildlife Service and National Marine Fisheries Service and identify the participating agencies and Field Offices/Regional Offices you worked with in the basis statement of this NOI. Section IX. Historic Preservation Use the instructions in Appendix E to complete the questions on the NOI form regarding historic preservation. Section X. Certification Information The NOI must be signed as follows: For a corporation: By a responsible corporate officer. For the purpose of this Section, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy- or decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. For a partnership or sole proprietorship: By a general partner or the proprietor, respectively; or For a municipality, state, federal, or other public agency: By either a principal executive officer or ranking elected official. For purposes of this Part, a principal executive officer of a federal agency includes (i) the chief executive officer of the agency, or Page 8 of 9 Instructions for Completing EPA Form 3510-9 Notice of Intent for the 2017 NPDES Construction General Permit NPDES Form Date (2/17) This Form Replaces Form 3510-9 (02/12) (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., Regional Administrator of EPA). Include the name and title of the person signing the form and the date of signing. An unsigned or undated NOI form will not be considered eligible for permit coverage. Modifying Your NOI If you have been granted a waiver from your Regional Office from electronic reporting, and if after submitting your NOI you need to correct or update any fields on this NOI form, you may do so by indicating changes on this same form. Paperwork Reduction Act Notice Public reporting burden for this NOI is estimated to average 3.7 hours. This estimate includes time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Send comments regarding the burden estimate, any other aspect of the collection of information, or suggestions for improving this form, including any suggestions which may increase or reduce this burden to: Chief, Information Policy Branch 2136, U.S. Environmental Protection, Agency, 1200 Pennsylvania Avenue, NW, Washington, D.C. 20460. Include the OMB control number on EPA Form 3510-9 Form Approved OMB No. 2040-0004 any correspondence. Do not send the completed form to this address. Submitting Your Form Submit your NOI form by mail to one of the following addresses: For Regular U.S. Mail Delivery: Stormwater Notice Processing Center Mail Code 4203M, ATTN: 2017 CGP U.S. EPA 1200 Pennsylvania Avenue, NW Washington, DC 20460 For Overnight/Express Mail Delivery: Stormwater Notice Processing Center William Jefferson Clinton East Building - Room 7420 ATTN: 2017 CGP U.S. EPA 1201 Constitution Avenue, NW Washington, DC 20004 Visit this website for instructions on how to submit electronically: https://www.epa.gov/npdes/stormwater-dischargesconstruction-activities#ereporting Page 9 of 9