Document
Section 319 Nonpoint Source Program
ICR 202609-2090-001 · OMB 2090-0038 · Object 172425500.
Document Viewer [pdf]
Status: Original and derived artifacts are available for this document.
Download: pdf
Loading document viewer…
Document Metadata
| File Type | application/pdf |
|---|---|
| File Title | Section 319 Nonpoint Source Program |
| Author | Curtis, Cynthia (she/her/hers) |
| Last Modified By | Acrobat PDFMaker 24 for Word |
| File Modified | 2024-05-29 |
| File Created | 2024-04-12 |
| Conversion State | complete |
Extracted Text
Section 319 Grants - Grants Reporting and Tracking System. Table of Contents Page Content 1 User interface home page 2 State and Territory 319 project screenshot (data is fictional and does not relate to any actual projects) 6 State and Territory Terms and Conditions for reporting 7 Tribal 319 projects 12 Tribal Terms and Conditions NNotes: • The Grants Reporting and Tracking System (GRTS) is regularly being improved to streamline data entry and access.for all grantees: The database is used to capture annual progress, status updates or attachments are added incrementally to the project each year. • The final report is added as an attachment (see page 4). • Tribal 319 projects are a subset of reporting elements that states and territories complete. Grants Reporting and Tracking system home page: ( the home page is for 319 grants and success stories) Burden Statement block added here - above GRTS announcements ( see full text below) Text that will be added in text box above: This collec�on of informa�on is approved by OMB under the Paperwork Reduc�on Act, 44 U.S.C. 3501 et seq. OMB Control Number: 2090NEW. Responses to this collec�on of informa�on are mandatory [2 CFR Part 200]. An agency may not conduct or sponsor, and a person is not required to respond to, a collec�on of informa�on unless it displays a currently valid OMB control number. The public repor�ng and recordkeeping burden for this collec�on of informa�on is es�mated to be 8-16 hours per response. Send comments on the Agency’s need for this informa�on, the accuracy of the provided burden es�mates and any suggested methods for minimizing respondent burden to Director, Informa�on Engagement Division; U.S. Environmental Protec�on Agency (2821T); 1200 Pennsylvania Ave., NW; Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address. Screen shot of user interface for each project in a grant ( see full list of ques�ons on the “project print” below) Botom of the project entry form - see placeholder OMB control language below. OMB Control Number = 2090.NEW, Expira�on Date = mm/dd/yyyy. Test project example with all questions below, Questions with a red asterisk* are required, all the rest are optional 4/9/24, 2:21 PM Project Print Project Information Region: 07 Grant #: 00740721 State: MO Appropriation Year: 2015 Project #: 16 General Information 50/50 Funding Split: Watershed Project Funds Project Title: TEST ttttttttttttttt now marked parent. add a word State Project Number: 45 This Project Does Not Have a Subgrantee Subgrantee(s): Description: This project is being used to test the enhancements to the GRTS application. Statewide: Y This Project Will / Did Y Result in Pollutant Load Reductions: Project Manager: Phone: State Project Manager: Phone: Status of TMDL for Waterbody/Watershed: 51% or More of Y Project Budget Used to Protect Unimpaired / High Quality Waterbodies: Budget Grant Summary Total 319 Grant Funds: $0 Total 319(h) Funds for all Projects: - $1,738,072 Grant Funds Remaining: = -$1,738,072 Project Budget Appropriation Year: 2015 Project budget includes 3 319(h) Federal Funds: $0 EPA Other: $0 Other Federal: $0 State Funds: $0 State In-Kind: $0 Local Funds: $0 Local In-Kind: $0 Other Funds: $0 Total Budget: $0 Comments: Work Categories Category of Work Primary 319(h) National Monitoring Project Y NPS State Staff Activities N Quality Assurance Project Plan Does the Project require a Quality Assurance Project Plan Yes No NPS Staffing https://grts.epa.gov/ords/grts/f?p=109:195:13882876971044:::195:P195_PRJ_ID:108021&cs=17RD5zrc4bNRMJcPD5ATyPdbtl7s&p_dialog_cs=PoC… 1/3 4/9/24, 2:21 PM Project Print Please describe the type of NPS staffing. NPS staffing percentage totaling 100% is required. Sources of NPS Pollution Category Type Secondary Percent (%) Construction Land Development or Redevelopment Agriculture Grazing-Related Sources 10 70 80 Key Partners Organization Type Partner Name Partner Contribution Description of Role/Notes <> SOIL HEALTH ACADEMY County/Municipal Agencies CITY OF MARYVILLE $0 $0 Related Projects No Related Projects found. Attachments Attachment Name File Size Document Type Goofy file two.docx 11.8KB [Other] Goofy file.docx 11.8KB [Other] Pretend final report - Copy.docx 11.8KB Final Report (Closeout) Pretend final report.docx 11.8KB Final Report (Closeout) State_GWS84.shp 0.3KB Final Report (Closeout) State_GWS84.prj 0.1KB [Other] Correspondence pretend.docx 11.8KB Final Report (Closeout) Pretend WBP as final product.docx 11.8KB [Other] Project Workplan test.docx 11.8KB Work Plan PIP 1.docx 75.1KB [Other] Final report attached here. Planning Watershed Plans Status Plan Name Attachment Implementing a Watershed Based Plan Lake of the Ozarks Watershed Management Plan Developing a Watershed Based Plan this is the pretend name Pretend WBP.docx Project Status Status Type Current Status Status Date Comment Editor Edited Date Current On Schedule 03/08/2024 - HVALLE 03/06/2024 History Pending 03/06/2024 - HVALLE 03/06/2024 History Never Initiated 02/13/2024 - JBLOUNT 02/13/2024 History Ahead of Schedule 02/02/2002 from joebu account JOEBU History Behind Schedule 01/01/2001 overwrite ? instead of new JBLOUNT 01/08/2024 History Pending 01/08/2024 amnt JBLOUNT 01/08/2024 History Completed 01/04/2024 - HVALLE 01/04/2024 History Behind Schedule - - HVALLE 12/28/2023 History Never Initiated 08/08/2008 old dash not showing. JBLOUNT 12/27/2023 01/08/2024 Schedule Project Start 09/03/2020 Date: Project End Date: 09/08/2033 Comments: schedule comments go here https://grts.epa.gov/ords/grts/f?p=109:195:13882876971044:::195:P195_PRJ_ID:108021&cs=17RD5zrc4bNRMJcPD5ATyPdbtl7s&p_dialog_cs=PoC… 2/3 4/9/24, 2:21 PM Project Print Waterbody Information No Waterbodies found. Pollutants to be Addressed Load Reduction Goal (Numeric, Total for ENTIRE Project) Pollutant Units TONS/YR Sedimentation-Siltation Phosphorus 12 LBS/YR 1-2 Planned Activities BMP Type Quantity Planned Contour Farming Units of Measure 14 AC Critical Area Planting AC Denitrifying Bioreactor N/A Tasks No Tasks found. Project Evaluations Evaluation Evaluation Type filler eval Final Product Reporting From Reporting To - - Creation Date 12/27/2023 Attachments Final product pretend in eval332.docx Environmental Results Drainage Areas Drainage number Drainage area 1 Stick Branch-Pomme de Terre Lake (102901070205) - Bmps Pollutants - Drainage Area Pollutants Best Management Practices Ecoregions Ecoregion Ozark Highlands Counties County Name State HICKORY MO POLK MO STATEWIDE - OMB Control Number = 2090.NEW, Expira�on Date = mm/dd/yyyy. https://grts.epa.gov/ords/grts/f?p=109:195:13882876971044:::195:P195_PRJ_ID:108021&cs=17RD5zrc4bNRMJcPD5ATyPdbtl7s&p_dialog_cs=PoC… 3/3 Grant Terms and Conditions excerpt describes reporting expectations, A.1. Project Reports The recipient agrees to submit reports for all projects identified in the approved work plan, including those performed by the recipient, subgrantees, contractors, and through interagency agreements. Reports shall include a comparison of actual accomplishments to the outputs/outcomes established in the work plan for that period, the reasons for slippage if those outputs/outcomes could not be met, and any other pertinent information, such as cost overruns. Reports are due annually/semiannually on insert date each year until the grant is closed. Reports should be submitted in GRTS. In accordance with 2 CFR 200.329, the recipient agrees to inform the EPA as soon as problems, delays, or adverse conditions arise that will materially impair the ability to meet the outputs/outcomes specified in the assistance agreement work plan. In addition, reports should include three essential elements: • • • Strategic Plan Goal 5.0, Strategic Plan Objective 5.2, and Work plan commitments, plus a timeframe. A final project report is due to the EPA project officer within 120 days after the end of the Assistance Agreement Project Period. The report must describe project activities and identify and discuss the extent to which project goals have been achieved and the amount of funds spent on the project. The report should emphasize successes, failures, lessons learned, and load reduction data, and it should include any available water quality and habitat data demonstrating project results. Acceptance and approval of final project reports is the responsibility of the recipient. Final project reports will be provided electronically as attachments in GRTS and submitted in hard copy if required. In addition, the GRTS database should be updated to reflect the project status as complete. A.2. Annual Nonpoint Source Program Report The recipient agrees to provide information required under Section 319(h)(11)(B) for the purpose of annual reporting on progress under the state’s NPSMP. The Section 319 Annual Program Report will be due by insert date. At a minimum, the report shall contain a summary of progress, including rationale/evidence, in meeting the schedule of milestones in the approved management program and reductions in NPS pollutant loading and improvements in water quality that have resulted from implementing the NPSMP. Failure to submit the annual NPSMP report may affect the recipient’s eligibility for future Section 319 grant funding. A.3. Grants Reporting and Tracking System The recipient shall enter all mandated data elements into GRTS for NPS projects funded under Section 319 of the CWA and any other data and/or information required by the EPA or according to deadlines specified by the EPA. Initial data entry is due 90 days from the award and includes all mandated data elements except the geographic area (if still to be determined), BMPs, and load reduction data. The recipient will report BMP and load reduction data as projects are implemented. At a minimum, the BMP and load reduction data will be reported by March 31 of each year for projects implementing BMPs in the previous federal fiscal year. 4/12/24, 11:52 AM Tribal Project - Project Information w/ Drainage Areas Sample Tribal GRTS Entry Screen - red Asterisk is required elements indicates mandated element. EPA Home / GRTS Home / Tribal Grants /of 00A00924 / SectionGrants View: &AllProjects Tools Reports Help My Account Grants Reporting and Tracking System (GRTS) Tribal Project 01 / Project Tribal Project Mandated Elements Check Admin Logo Help Project Information Grant #: Region: Grantee: 01 Appropriation Year: DUNS#: 2022 Project #: 01 General Information Project Title: Hydromodification/channel restoration test Short Project Description: sample text Waterbody Name(s): Watershed Name(s): test rive HUC12(s) -Select one or more HUC12s- test river https://grts.epa.gov/ords/grts/f?p=109:2101:4385954913916:::2101:APP_PRJ_ID:129504&cs=1wPKCdlJLHNGpJrKF6c-LEbpVsOk 1/5 4/12/24, 11:52 AM Tribal Project - Project Information w/ Drainage Areas NOTE: Hold down [CTRL] button to select multiple HUC12s Yes No Watershed-based Grants Reporting and Tracking System (GRTS) plan development a part of this project?: Tribal Project Mandated Elements Check Logo Help Contact Email: Tribe Project Contact: Sources of NPS Pollution View/Hide Secondary Sources Delete Selected Category Type Secondary Hydromodification Flow Regulations/Modification Add Source Add Pollutants to be Addressed Add Management Measures Total Pollutants to be Addressed Data entered here reflects POLLUTION REDUCTION GOALS for the project Edit All Data/Add LR Goals Pollutant Alteration (Flow) Delete Selected Load Reduction Goal (Numeric, Total for ENTIRE Project) Units <> 1-1 Management Measures https://grts.epa.gov/ords/grts/f?p=109:2101:4385954913916:::2101:APP_PRJ_ID:129504&cs=1wPKCdlJLHNGpJrKF6c-LEbpVsOk 2/5 4/12/24, 11:52 AM Tribal Project - Project Information w/ Drainage Areas Grants ReportingView andDefinitions Tracking System (GRTS) Delete Selected Tribal Project Mandated Elements Check Help Go Logo Actions Edit BMP Type Stream Channel Restoration (Stream Bed/Habitat) Numb 100 INDIVIDUAL UNITS 1-1 Anticipated Outputs : f Anticipated Outcomes : Budget Project Budget Appropriation Year: 319(h) Competitive Grant Funds: Other EPA Grant Funds: $ https://grts.epa.gov/ords/grts/f?p=109:2101:4385954913916:::2101:APP_PRJ_ID:129504&cs=1wPKCdlJLHNGpJrKF6c-LEbpVsOk 3/5 4/12/24, 11:52 AM Tribal Project - Project Information w/ Drainage Areas Other Federal: $0 Grants Reporting and Tracking System (GRTS) Tribal Project 319(h) Match Funds: Check TribalMandated Elements Help Logo $0 Tribal In-Kind: $0 Other Tribal Funds: $0 Local Funds: $0 Total Budget: $99,342 Comments: Project Partners Edit All Data Add Project Partner Add Attachment Delete Selected No Key Partners found. Attachments Delete Selected Download All Attachments https://grts.epa.gov/ords/grts/f?p=109:2101:4385954913916:::2101:APP_PRJ_ID:129504&cs=1wPKCdlJLHNGpJrKF6c-LEbpVsOk 4/5 4/12/24, 11:52 AM Tribal Project - Project Information w/ Drainage Areas Grants Reporting No Attachments found. and Tracking System (GRTS) Tribal Project Mandated Elements Check Logo Help Drainage Areas View/Add Drainage Areas Delete Selected Go Actions No Drainage Areas found. 3.0 Set Screen Reader Mode On https://grts.epa.gov/ords/grts/f?p=109:2101:4385954913916:::2101:APP_PRJ_ID:129504&cs=1wPKCdlJLHNGpJrKF6c-LEbpVsOk 5/5 Tribal Term and Condition Excerpt GRTS Project Information Applicants selected for award under this announcement will be responsible for providing the EPA with project information due 90 days from award, which will be entered into the EPA’s CWA §319 Grants Reporting and Tracking System (GRTS). Required project information includes a project description, NPS categories of pollution and pollutants to be addressed, proposed BMPs, anticipated environmental outputs and outcomes, project location, project budget information, and project partners contributing to project implementation. Type text here