Document

Pollution Prevention (P2) Program

ICR 202609-2090-001 · OMB 2090-0038 · Object 175132700.

Document Viewer [xlsx]

Status: Original and derived artifacts are available for this document.

Download: xlsx | pdf | html

Primary: spreadsheetSource: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
Loading document viewer…

Document Metadata

Record metadata
application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
Pollution Prevention (P2) Program
José Zambrana
Calc
2026-02-04
2026-11-21
complete

Extracted Text

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to Indivi

Welcome

How to Choose Among the Template
Workbooks

Getting Started in the Template 1
Workbook:

Calculating Outcomes in the Facility
Tabs

EPA Form 9600-047
Paperwork Reduction Act Burden Statement

This collection of information is approved by OMB under the Paperwork Reduction Act, 44 U.S.C. 3501 et seq. (OMB C
mandatory for certain persons, as specified at 42 U.S.C 13101 and 15 U.S.C.3701. An agency may not conduct or sponsor, and a p
currently valid OMB control number. The public reporting and recordkeeping burden for this collection of information is estimate
hours per response on average for Template #2. Send comments on the Agency’s need for this information, the accuracy of the p
burden to the Regulatory Support Division Director, U.S. Environmental Protection Agency (2821T), 1200 Pennsylvania Ave., NW,
Do not send the completed form to this address.

mplate 1: Facility-Level Reporting for Direct P2 Technical Assistance to Individual Facilities

This Excel file is one of two template files offered by EPA to recipients of Pollution Prevention (P2) Grants. Each file is called
spreadsheets (worksheets) for entering your data. Using these workbooks will allow you to track and report all required ou
tabulate many of your required outputs, and update and resubmit the file for sequential annual reporting. Using these wor
easily import this information into a P2 Grants Database which helps EPA aggregate P2 grant performance information acr
will also be available to all P2 grantees so you can search and find what P2 actions are being recommended and implemen
See https://www.epa.gov/p2/grant-reporting

Choose from among the template workbooks according to the type of grant project (activity category) you are reporting on
providing P2 technical assistance recommendations to individual facilities. Template 2: For a grant project supporting a gre
leadership program or providing P2 technical assistance to broad audiences (training webinars, roundtables, etc.).NOTE: A
for each type of project. If you enter facilities from two projects in a single workbook, the workbook cannot aggregate resu

If you have a grant project providing technical P2 recommendations to individual facilities, Template 1 is the right format f
Number your grant projects with your project officer. You and your EPA grant project officer should work togeth
under your grant. The project number is the grant number preceded by a P1-, or a P2-, and so on. For exam
has two projects, one project will be P1-XYZ1234 and the other will be P2-XYZ1234. Project numbers help r

Start a new workbook file using Template 1. Enter your assigned grant project number in the Grant Project Dat
project number then auto-populated in the Facility tabs. As you go about your data entry, PLEASE DO NOT M
FEATURES OR FUNCTIONS. Any modification will interfere with EPA’s ability to import this file into a grant repo
calculating national P2 performance measures and sharing information with P2 technical assistance provid
recommended and implemented. When you save the file, include the grant project number in the name of

Overview of workbook functionality: Use the tabs below from left to right. Full instructions appear in each tab
The Grant Project Data Tab combines data entry and an automatic list. On top is the data entry area for grant
that is an auto-generated tracking list that will pull in facility names you've entered in numbered facility ta
the correct numbered facility tabs.
The Aggregate Results Tab is an auto-calculator that aggregates results automatically from data entered in nu
The Sample Facility Tab shows a facility tab filled in sufficiently to serve as an example.
The Numbered Facility Tabs are for data entry of facility-level data, one facility per numbered tab. While entry
optional, it is handy to provide one because the Grant Project Data Tab can pull it and associate it with the
This list associating numbered tabs to facility names will help you later when you need to find the correct t
update the status of follow-up, implementation and results achieved. Template 1 has 75 Facility Tabs; plea
more Facility Tabs.
Data Validation This template has built-in validation to help ensure the accuracy of the data. This data valida
information is key entered; however, we recognize that you will likely populate this template using data fro
are going to be copying data into this template, please take the following precautions: • When copying da
“Paste Values” instead of “Paste.” • If you need to move data within the template, use “Copy” instead of “C

EPA's P2 calculators are designed to help you measure environmental and economic outcomes from pollution prevention a

For help with calculating Metric Tons of Carbon Dioxide Equivalent (MTCO2e), the required reporting unit for reductions i
gases, please use the EPA P2 Greenhouse Gas Calculator. The calculator allows you to calculate your GHG reductions from
substitution (green energy), stationary sources, mobile sources, reduced water use, reduced chemical use, chemical substi
remanufacturing. The calculator will also provide associated cost savings for the first five listed above (electricity managem
and mobile sources, and reduced water use).
For help with calculating cost savings, please use the P2 Cost Savings Calculator. This calculator estimates the a
realized from avoided fees and expenses associated with buying fewer hazardous inputs, shipping less ha
fewer regulated air emissions, using less water, sending less wastewater through pre-treatment and treat
fuel and energy. The cost differences of buying greener materials, fuel and energy is also calculated. Users
estimate prospective cost savings.

To calculate pounds of water pollution that facilities reduce, either use the facility’s permit methodology or multi
8.35 to get pounds and divide by 10,000 to eliminate water content.

For help with converting gallons of hazardous materials to pounds of hazardous materials, please use the P2 Gallons

Burden Statement

is approved by OMB under the Paperwork Reduction Act, 44 U.S.C. 3501 et seq. (OMB Control No. 2090-0038). Responses to this col
s, as specified at 42 U.S.C 13101 and 15 U.S.C.3701. An agency may not conduct or sponsor, and a person is not required to respond to, a collection
umber. The public reporting and recordkeeping burden for this collection of information is estimated to be approximately 20 hours per response on
e for Template #2. Send comments on the Agency’s need for this information, the accuracy of the provided burden estimates and any suggested me
port Division Director, U.S. Environmental Protection Agency (2821T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB contr
rm to this address.

ated: 9/28/2023

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistan

P2 Grant Project Data

How to Use This Tab:

Grant Recipient:
Grant Project Number:
Grant Award Date:
Grantee Contact Name:
Grantee Contact Phone Number:
Grantee Contact E-mail:
EPA Region:
EPA Technical Contact Name:
EPA Technical Contact Phone Number:
EPA Technical Contact Email:

Facility 1:
Facility 2:
Facility 3:
Facility 4:
Facility 5:
Facility 6:
Facility 7:
Facility 8:
Facility 9:
Facility 10:
Facility 11:
Facility 12:
Facility 13:
Facility 14:
Facility 15:
Facility 16:
Facility 17:
Facility 18:
Facility 19:
Facility 20:
Facility 21:
Facility 22:
Facility 23:
Facility 24:
Facility 25:
Facility 26:

Facility 27:
Facility 28:
Facility 29:
Facility 30:
Facility 31:
Facility 32:
Facility 33:
Facility 34:
Facility 35:
Facility 36:
Facility 37:
Facility 38:
Facility 39:
Facility 40:
Facility 41:
Facility 42:
Facility 43:
Facility 44:
Facility 45:
Facility 46:
Facility 47:
Facility 48:
Facility 49:
Facility 50:
Facility 51:
Facility 52:
Facility 53:
Facility 54:
Facility 55:
Facility 56:
Facility 57:
Facility 58:
Facility 59:
Facility 60:
Facility 61:
Facility 62:
Facility 63:
Facility 64:
Facility 65:
Facility 66:
Facility 67:
Facility 68:
Facility 69:
Facility 70:
Facility 71:
Facility 72:
Facility 73:
Facility 74:

Facility 75:

1: Facility-Level Reporting for Direct P2 Technical Assistance to Individual Facilities

1. Fill in Rows 7 - 16. Rows 7 and 8 will be used to populate rows 7 and 8 in the Facility tabs.
2. The tracking list starting in Row 20 is automatically populated as you enter facility names in numbered
This list will help you later when you need to find the facility to return to for updating the status of follow
implementation, and results achieved.

Facility Names on Facility Tabs (populated automatically)

Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab

Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab
Go to Tab

Go to Tab

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistan

Aggregate of Verified Implemented Results From All Facility Tabs

How to Use This Tab:

1. This is a read-only tab where you can track the agg
facilities covered in this grant project. A background
tabs. Informational messages on the Facility tabs wil
Action Recommendations row (and "Y" in Column I).
2. You can also track the aggregate of output measu

Grant Recipient:
Grant Project Number:
Totals for All Facilities:
$

Annual Red

Annual Savings
Hazardous
Fiscal One-time Cost to from P2 Action Material Input
Year
Implement ($)
($)
(lbs)

Hazardous
Waste
(lbs)

2023

$0

$0

0

0

2024

$0

$0

0

0

2025

$0

$0

0

0

2026

$0

$0

0

0

2027

$0

$0

0

0

2028

$0

$0

0

0

Aggregate of Output Measures From All Facility Tabs
Number of business facilities provided technical assistance.

Percentage of business facilities provided technical assistance that the grantee follows up with (e.g.
email) to determine which P2 practices were implemented (should be 100%).

Percentage of business facilities that implemented at least one new P2 practice as a result of the tec
the grantee.

Number of business facilities with case studies describing specific P2 best practices implemented th

ct P2 Technical Assistance to Individual Facilities

ity Tabs

where you can track the aggregate outcome values being achieved by all
ant project. A background formula pulls reported values from the Facility
ages on the Facility tabs will remind you to select a Fiscal Year in the given P2
row (and "Y" in Column I).
ggregate of output measures from all facilities in this grant project.

Annual Reductions
Water
Air Emissions
Pollution
(lbs)
(lbs)

MTCO2e
Emissions
(tons)

Water Use
(gallons)

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

rantee follows up with (e.g., phone call, visit, letter or
0%).

ractice as a result of the technical assistance provided by

t practices implemented through the grant.

0
0%

0%

0

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
indicated as "Y" ("Was the Recommendatio
actual implementation at the facility.

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column L, enter “quantity” information associated with implementation. In
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).- If column J i
ed as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be updated based o
implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column LM, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).- If column J is
annual reductions must be updated based on the

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ted action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
Outcomes," enter each P2 recom
annual savings and annual reduc
which P2 recommendations it im
select a federal Fiscal Year (the O
see the section in the “Getting Sta
study covers this implemented ac
"Y," and Column J has a Fiscal Yea
confirms that a P2 recommendat
Column N, if the facility has no pl
barrier, etc.).5. The cell will be hig
to remove the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
comes," enter each P2 recommendation provided to the facility during technical assistance in Column A, one recomm
ual savings and annual reductions per recommendation in Columns B – H. 3. Once you have followed up with a facili
ch P2 recommendations it implemented. 4.a. When your follow-up confirms a P2 recommendation was implemented
ect a federal Fiscal Year (the Oct. 1 - Sept. 30 period when implementation occurred). In Columns B - H, enter updated
the section in the “Getting Started” Tab on “Calculating Outcomes in the Facility Tabs.” In Column K, enter “quantity”
dy covers this implemented action. Please note: Columns B - H values for a row will tally in this tab’s Total rows and in
and Column J has a Fiscal Year selected. If more steps of a recommendation get implemented in a second year, add
firms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In Column M, enter "Y "if the
umn N, if the facility has no plans to implement the recommendation and can tell you why, enter the barrier(s) to imp
rier, etc.).5. The cell will be highlighted yellow if your response is different than the expected input type (e.g., letters i
emove the highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs. 2. Under "P2 Actions and
assistance in Column A, one recommendation per row. You may, at your option, enter initial estimates of costs,
ce you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn
recommendation was implemented, in Column I select “Y“ (yes it was implemented at this facility) and in Column J
d). In Columns B - H, enter updated cost, savings and outcome values. For calculating MTCO2e and water pollution,
abs.” In Column K, enter “quantity” information associated with implementation. In Column L, select “Y” if a case
ll tally in this tab’s Total rows and in the Aggregate Results tab only if Row 20 has a follow-up date, Column I has a
mplemented in a second year, add a row for phase 2 steps and complete Columns B – K. 4.b. When your follow-up
umn I. In Column M, enter "Y "if the facility plans to implement the recommendation within the next 5 years. In
you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not feasible, a regulatory
e expected input type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

r "P2 Actions and
imates of costs,
he facility to learn
ty) and in Column J
and water pollution,
select “Y” if a case
ate, Column I has a
hen your follow-up
next 5 years. In
asible, a regulatory
e appropriate format

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
indicated as "Y" ("Was the Recommendatio
actual implementation at the facility.

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).- If column J i
ed as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be updated based o
implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).- If column J is
annual reductions must be updated based on the

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
Outcomes," enter each P2 recom
annual savings and annual reduc
which P2 recommendations it im
select a federal Fiscal Year (the O
see the section in the “Getting Sta
study covers this implemented ac
"Y," and Column J has a Fiscal Yea
confirms that a P2 recommendat
Column N, if the facility has no pl
barrier, etc.).5. The cell will be hig
to remove the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
comes," enter each P2 recommendation provided to the facility during technical assistance in Column A, one recomm
ual savings and annual reductions per recommendation in Columns B – H. 3. Once you have followed up with a facili
ch P2 recommendations it implemented. 4.a. When your follow-up confirms a P2 recommendation was implemented
ect a federal Fiscal Year (the Oct. 1 - Sept. 30 period when implementation occurred). In Columns B - H, enter updated
the section in the “Getting Started” Tab on “Calculating Outcomes in the Facility Tabs.” In Column K, enter “quantity”
dy covers this implemented action. Please note: Columns B - H values for a row will tally in this tab’s Total rows and in
and Column J has a Fiscal Year selected. If more steps of a recommendation get implemented in a second year, add
firms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In Column M, enter "Y "if the
umn N, if the facility has no plans to implement the recommendation and can tell you why, enter the barrier(s) to imp
rier, etc.).5. The cell will be highlighted yellow if your response is different than the expected input type (e.g., letters i
emove the highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs. 2. Under "P2 Actions and
assistance in Column A, one recommendation per row. You may, at your option, enter initial estimates of costs,
ce you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn
recommendation was implemented, in Column I select “Y“ (yes it was implemented at this facility) and in Column J
d). In Columns B - H, enter updated cost, savings and outcome values. For calculating MTCO2e and water pollution,
abs.” In Column K, enter “quantity” information associated with implementation. In Column L, select “Y” if a case
ll tally in this tab’s Total rows and in the Aggregate Results tab only if Row 20 has a follow-up date, Column I has a
mplemented in a second year, add a row for phase 2 steps and complete Columns B – K. 4.b. When your follow-up
umn I. In Column M, enter "Y "if the facility plans to implement the recommendation within the next 5 years. In
you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not feasible, a regulatory
e expected input type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

r "P2 Actions and
imates of costs,
he facility to learn
ty) and in Column J
and water pollution,
select “Y” if a case
ate, Column I has a
hen your follow-up
next 5 years. In
asible, a regulatory
e appropriate format

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented (Oct.
1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
Outcomes," enter each P2 recom
annual savings and annual reduc
which P2 recommendations it im
select a federal Fiscal Year (the O
see the section in the “Getting Sta
study covers this implemented ac
"Y," and Column J has a Fiscal Yea
confirms that a P2 recommendat
Column N, if the facility has no pl
barrier, etc.).5. The cell will be hig
to remove the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
comes," enter each P2 recommendation provided to the facility during technical assistance in Column A, one recomm
ual savings and annual reductions per recommendation in Columns B – H. 3. Once you have followed up with a facili
ch P2 recommendations it implemented. 4.a. When your follow-up confirms a P2 recommendation was implemented
ect a federal Fiscal Year (the Oct. 1 - Sept. 30 period when implementation occurred). In Columns B - H, enter updated
the section in the “Getting Started” Tab on “Calculating Outcomes in the Facility Tabs.” In Column K, enter “quantity”
dy covers this implemented action. Please note: Columns B - H values for a row will tally in this tab’s Total rows and in
and Column J has a Fiscal Year selected. If more steps of a recommendation get implemented in a second year, add
firms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In Column M, enter "Y "if the
umn N, if the facility has no plans to implement the recommendation and can tell you why, enter the barrier(s) to imp
rier, etc.).5. The cell will be highlighted yellow if your response is different than the expected input type (e.g., letters i
emove the highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs. 2. Under "P2 Actions and
assistance in Column A, one recommendation per row. You may, at your option, enter initial estimates of costs,
ce you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn
recommendation was implemented, in Column I select “Y“ (yes it was implemented at this facility) and in Column J
d). In Columns B - H, enter updated cost, savings and outcome values. For calculating MTCO2e and water pollution,
abs.” In Column K, enter “quantity” information associated with implementation. In Column L, select “Y” if a case
ll tally in this tab’s Total rows and in the Aggregate Results tab only if Row 20 has a follow-up date, Column I has a
mplemented in a second year, add a row for phase 2 steps and complete Columns B – K. 4.b. When your follow-up
umn I. In Column M, enter "Y "if the facility plans to implement the recommendation within the next 5 years. In
you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not feasible, a regulatory
e expected input type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

r "P2 Actions and
imates of costs,
he facility to learn
ty) and in Column J
and water pollution,
select “Y” if a case
ate, Column I has a
hen your follow-up
next 5 years. In
asible, a regulatory
e appropriate format

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
indicated as "Y" ("Was the Recommendatio
actual implementation at the facility.

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).- If column J i
ed as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be updated based o
implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).- If column J is
annual reductions must be updated based on the

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
Outcomes," enter each P2 recom
annual savings and annual reduc
which P2 recommendations it im
select a federal Fiscal Year (the O
see the section in the “Getting Sta
study covers this implemented ac
"Y," and Column J has a Fiscal Yea
confirms that a P2 recommendat
Column N, if the facility has no pl
barrier, etc.).5. The cell will be hig
to remove the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
comes," enter each P2 recommendation provided to the facility during technical assistance in Column A, one recomm
ual savings and annual reductions per recommendation in Columns B – H. 3. Once you have followed up with a facili
ch P2 recommendations it implemented. 4.a. When your follow-up confirms a P2 recommendation was implemented
ect a federal Fiscal Year (the Oct. 1 - Sept. 30 period when implementation occurred). In Columns B - H, enter updated
the section in the “Getting Started” Tab on “Calculating Outcomes in the Facility Tabs.” In Column K, enter “quantity”
dy covers this implemented action. Please note: Columns B - H values for a row will tally in this tab’s Total rows and in
and Column J has a Fiscal Year selected. If more steps of a recommendation get implemented in a second year, add
firms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In Column M, enter "Y "if the
umn N, if the facility has no plans to implement the recommendation and can tell you why, enter the barrier(s) to imp
rier, etc.).5. The cell will be highlighted yellow if your response is different than the expected input type (e.g., letters i
emove the highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs. 2. Under "P2 Actions and
assistance in Column A, one recommendation per row. You may, at your option, enter initial estimates of costs,
ce you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn
recommendation was implemented, in Column I select “Y“ (yes it was implemented at this facility) and in Column J
d). In Columns B - H, enter updated cost, savings and outcome values. For calculating MTCO2e and water pollution,
abs.” In Column K, enter “quantity” information associated with implementation. In Column L, select “Y” if a case
ll tally in this tab’s Total rows and in the Aggregate Results tab only if Row 20 has a follow-up date, Column I has a
mplemented in a second year, add a row for phase 2 steps and complete Columns B – K. 4.b. When your follow-up
umn I. In Column M, enter "Y "if the facility plans to implement the recommendation within the next 5 years. In
you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not feasible, a regulatory
e expected input type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

r "P2 Actions and
imates of costs,
he facility to learn
ty) and in Column J
and water pollution,
select “Y” if a case
ate, Column I has a
hen your follow-up
next 5 years. In
asible, a regulatory
e appropriate format

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
indicated as "Y" ("Was the Recommendatio
actual implementation at the facility.

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).- If column J i
ed as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be updated based o
implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).- If column J is
annual reductions must be updated based on the

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave 5 years? (Y or
What was the barrier
N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented (Oct.
1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave 5 years? (Y or
What was the barrier to
N)
blank)
implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
Outcomes," enter each P2 recom
annual savings and annual reduc
which P2 recommendations it im
select a federal Fiscal Year (the O
see the section in the “Getting Sta
study covers this implemented ac
"Y," and Column J has a Fiscal Yea
confirms that a P2 recommendat
Column N, if the facility has no pl
barrier, etc.).5. The cell will be hig
to remove the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
comes," enter each P2 recommendation provided to the facility during technical assistance in Column A, one recomm
ual savings and annual reductions per recommendation in Columns B – H. 3. Once you have followed up with a facili
ch P2 recommendations it implemented. 4.a. When your follow-up confirms a P2 recommendation was implemented
ect a federal Fiscal Year (the Oct. 1 - Sept. 30 period when implementation occurred). In Columns B - H, enter updated
the section in the “Getting Started” Tab on “Calculating Outcomes in the Facility Tabs.” In Column K, enter “quantity”
dy covers this implemented action. Please note: Columns B - H values for a row will tally in this tab’s Total rows and in
and Column J has a Fiscal Year selected. If more steps of a recommendation get implemented in a second year, add
firms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In Column M, enter "Y "if the
umn N, if the facility has no plans to implement the recommendation and can tell you why, enter the barrier(s) to imp
rier, etc.).5. The cell will be highlighted yellow if your response is different than the expected input type (e.g., letters i
emove the highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs. 2. Under "P2 Actions and
assistance in Column A, one recommendation per row. You may, at your option, enter initial estimates of costs,
ce you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn
recommendation was implemented, in Column I select “Y“ (yes it was implemented at this facility) and in Column J
d). In Columns B - H, enter updated cost, savings and outcome values. For calculating MTCO2e and water pollution,
abs.” In Column K, enter “quantity” information associated with implementation. In Column L, select “Y” if a case
ll tally in this tab’s Total rows and in the Aggregate Results tab only if Row 20 has a follow-up date, Column I has a
mplemented in a second year, add a row for phase 2 steps and complete Columns B – K. 4.b. When your follow-up
umn I. In Column M, enter "Y "if the facility plans to implement the recommendation within the next 5 years. In
you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not feasible, a regulatory
e expected input type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

r "P2 Actions and
imates of costs,
he facility to learn
ty) and in Column J
and water pollution,
select “Y” if a case
ate, Column I has a
hen your follow-up
next 5 years. In
asible, a regulatory
e appropriate format

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
indicated as "Y" ("Was the Recommendatio
actual implementation at the facility.

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).- If column J i
ed as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be updated based o
implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).- If column J is
annual reductions must be updated based on the

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
indicated as "Y" ("Was the Recommendatio
actual implementation at the facility.

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).- If column J i
ed as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be updated based o
implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).- If column J is
annual reductions must be updated based on the

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
Outcomes," enter each P2 recom
annual savings and annual reduc
which P2 recommendations it im
select a federal Fiscal Year (the O
see the section in the “Getting Sta
study covers this implemented ac
"Y," and Column J has a Fiscal Yea
confirms that a P2 recommendat
Column N, if the facility has no pl
barrier, etc.).5. The cell will be hig
to remove the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
comes," enter each P2 recommendation provided to the facility during technical assistance in Column A, one recomm
ual savings and annual reductions per recommendation in Columns B – H. 3. Once you have followed up with a facili
ch P2 recommendations it implemented. 4.a. When your follow-up confirms a P2 recommendation was implemented
ect a federal Fiscal Year (the Oct. 1 - Sept. 30 period when implementation occurred). In Columns B - H, enter updated
the section in the “Getting Started” Tab on “Calculating Outcomes in the Facility Tabs.” In Column K, enter “quantity”
dy covers this implemented action. Please note: Columns B - H values for a row will tally in this tab’s Total rows and in
and Column J has a Fiscal Year selected. If more steps of a recommendation get implemented in a second year, add
firms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In Column M, enter "Y "if the
umn N, if the facility has no plans to implement the recommendation and can tell you why, enter the barrier(s) to imp
rier, etc.).5. The cell will be highlighted yellow if your response is different than the expected input type (e.g., letters i
emove the highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs. 2. Under "P2 Actions and
assistance in Column A, one recommendation per row. You may, at your option, enter initial estimates of costs,
ce you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn
recommendation was implemented, in Column I select “Y“ (yes it was implemented at this facility) and in Column J
d). In Columns B - H, enter updated cost, savings and outcome values. For calculating MTCO2e and water pollution,
abs.” In Column K, enter “quantity” information associated with implementation. In Column L, select “Y” if a case
ll tally in this tab’s Total rows and in the Aggregate Results tab only if Row 20 has a follow-up date, Column I has a
mplemented in a second year, add a row for phase 2 steps and complete Columns B – K. 4.b. When your follow-up
umn I. In Column M, enter "Y "if the facility plans to implement the recommendation within the next 5 years. In
you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not feasible, a regulatory
e expected input type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

r "P2 Actions and
imates of costs,
he facility to learn
ty) and in Column J
and water pollution,
select “Y” if a case
ate, Column I has a
hen your follow-up
next 5 years. In
asible, a regulatory
e appropriate format

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave 5 years? (Y or
What was the barrier
N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
Outcomes," enter each P2 recom
annual savings and annual reduc
which P2 recommendations it im
select a federal Fiscal Year (the O
see the section in the “Getting Sta
study covers this implemented ac
"Y," and Column J has a Fiscal Yea
confirms that a P2 recommendat
Column N, if the facility has no pl
barrier, etc.).5. The cell will be hig
to remove the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
comes," enter each P2 recommendation provided to the facility during technical assistance in Column A, one recomm
ual savings and annual reductions per recommendation in Columns B – H. 3. Once you have followed up with a facili
ch P2 recommendations it implemented. 4.a. When your follow-up confirms a P2 recommendation was implemented
ect a federal Fiscal Year (the Oct. 1 - Sept. 30 period when implementation occurred). In Columns B - H, enter updated
the section in the “Getting Started” Tab on “Calculating Outcomes in the Facility Tabs.” In Column K, enter “quantity”
dy covers this implemented action. Please note: Columns B - H values for a row will tally in this tab’s Total rows and in
and Column J has a Fiscal Year selected. If more steps of a recommendation get implemented in a second year, add
firms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In Column M, enter "Y "if the
umn N, if the facility has no plans to implement the recommendation and can tell you why, enter the barrier(s) to imp
rier, etc.).5. The cell will be highlighted yellow if your response is different than the expected input type (e.g., letters i
emove the highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs. 2. Under "P2 Actions and
assistance in Column A, one recommendation per row. You may, at your option, enter initial estimates of costs,
ce you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn
recommendation was implemented, in Column I select “Y“ (yes it was implemented at this facility) and in Column J
d). In Columns B - H, enter updated cost, savings and outcome values. For calculating MTCO2e and water pollution,
abs.” In Column K, enter “quantity” information associated with implementation. In Column L, select “Y” if a case
ll tally in this tab’s Total rows and in the Aggregate Results tab only if Row 20 has a follow-up date, Column I has a
mplemented in a second year, add a row for phase 2 steps and complete Columns B – K. 4.b. When your follow-up
umn I. In Column M, enter "Y "if the facility plans to implement the recommendation within the next 5 years. In
you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not feasible, a regulatory
e expected input type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

r "P2 Actions and
imates of costs,
he facility to learn
ty) and in Column J
and water pollution,
select “Y” if a case
ate, Column I has a
hen your follow-up
next 5 years. In
asible, a regulatory
e appropriate format

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
has not yet been implemented, e
implement the recommendation
yellow if your response is differen

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
not yet been implemented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recom
lement the recommendation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.
ow if your response is different than the expected input type (e.g., letters instead of numbers). Delete the response a

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K. 4.b. When your follow-up confirms that a P2 recommendation
acility plans to implement the recommendation within the next 5 years. In Column N, if the facility has no plans to
entation identified by the facility (e.g., high cost, not feasible, a regulatory barrier, etc.).5. The cell will be highlighted
of numbers). Delete the response and re-enter in the appropriate format to remove the highlighting.

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year
a P2 recommendation
ity has no plans to
ell will be highlighted
ghting.

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
Outcomes," enter each P2 recom
annual savings and annual reduc
which P2 recommendations it im
select a federal Fiscal Year (the O
see the section in the “Getting Sta
study covers this implemented ac
"Y," and Column J has a Fiscal Yea
confirms that a P2 recommendat
Column N, if the facility has no pl
barrier, etc.).5. The cell will be hig
to remove the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
comes," enter each P2 recommendation provided to the facility during technical assistance in Column A, one recomm
ual savings and annual reductions per recommendation in Columns B – H. 3. Once you have followed up with a facili
ch P2 recommendations it implemented. 4.a. When your follow-up confirms a P2 recommendation was implemented
ect a federal Fiscal Year (the Oct. 1 - Sept. 30 period when implementation occurred). In Columns B - H, enter updated
the section in the “Getting Started” Tab on “Calculating Outcomes in the Facility Tabs.” In Column K, enter “quantity”
dy covers this implemented action. Please note: Columns B - H values for a row will tally in this tab’s Total rows and in
and Column J has a Fiscal Year selected. If more steps of a recommendation get implemented in a second year, add
firms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In Column M, enter "Y "if the
umn N, if the facility has no plans to implement the recommendation and can tell you why, enter the barrier(s) to imp
rier, etc.).5. The cell will be highlighted yellow if your response is different than the expected input type (e.g., letters i
emove the highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs. 2. Under "P2 Actions and
assistance in Column A, one recommendation per row. You may, at your option, enter initial estimates of costs,
ce you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn
recommendation was implemented, in Column I select “Y“ (yes it was implemented at this facility) and in Column J
d). In Columns B - H, enter updated cost, savings and outcome values. For calculating MTCO2e and water pollution,
abs.” In Column K, enter “quantity” information associated with implementation. In Column L, select “Y” if a case
ll tally in this tab’s Total rows and in the Aggregate Results tab only if Row 20 has a follow-up date, Column I has a
mplemented in a second year, add a row for phase 2 steps and complete Columns B – K. 4.b. When your follow-up
umn I. In Column M, enter "Y "if the facility plans to implement the recommendation within the next 5 years. In
you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not feasible, a regulatory
e expected input type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

r "P2 Actions and
imates of costs,
he facility to learn
ty) and in Column J
and water pollution,
select “Y” if a case
ate, Column I has a
hen your follow-up
next 5 years. In
asible, a regulatory
e appropriate format

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
indicated as "Y" ("Was the Recommendatio
actual implementation at the facility.

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).- If column J i
ed as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be updated based o
implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).- If column J is
annual reductions must be updated based on the

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave 5 years? (Y or
What was the barrier to
N)
blank)
implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
indicated as "Y" ("Was the Recommendatio
actual implementation at the facility.

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).- If column J i
ed as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be updated based o
implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).- If column J is
annual reductions must be updated based on the

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented (Oct.
1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
Outcomes," enter each P2 recom
annual savings and annual reduc
which P2 recommendations it im
select a federal Fiscal Year (the O
see the section in the “Getting Sta
study covers this implemented ac
"Y," and Column J has a Fiscal Yea
confirms that a P2 recommendat
Column N, if the facility has no pl
barrier, etc.).5. The cell will be hig
to remove the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
comes," enter each P2 recommendation provided to the facility during technical assistance in Column A, one recomm
ual savings and annual reductions per recommendation in Columns B – H. 3. Once you have followed up with a facili
ch P2 recommendations it implemented. 4.a. When your follow-up confirms a P2 recommendation was implemented
ect a federal Fiscal Year (the Oct. 1 - Sept. 30 period when implementation occurred). In Columns B - H, enter updated
the section in the “Getting Started” Tab on “Calculating Outcomes in the Facility Tabs.” In Column K, enter “quantity”
dy covers this implemented action. Please note: Columns B - H values for a row will tally in this tab’s Total rows and in
and Column J has a Fiscal Year selected. If more steps of a recommendation get implemented in a second year, add
firms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In Column M, enter "Y "if the
umn N, if the facility has no plans to implement the recommendation and can tell you why, enter the barrier(s) to imp
rier, etc.).5. The cell will be highlighted yellow if your response is different than the expected input type (e.g., letters i
emove the highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs. 2. Under "P2 Actions and
assistance in Column A, one recommendation per row. You may, at your option, enter initial estimates of costs,
ce you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn
recommendation was implemented, in Column I select “Y“ (yes it was implemented at this facility) and in Column J
d). In Columns B - H, enter updated cost, savings and outcome values. For calculating MTCO2e and water pollution,
abs.” In Column K, enter “quantity” information associated with implementation. In Column L, select “Y” if a case
ll tally in this tab’s Total rows and in the Aggregate Results tab only if Row 20 has a follow-up date, Column I has a
mplemented in a second year, add a row for phase 2 steps and complete Columns B – K. 4.b. When your follow-up
umn I. In Column M, enter "Y "if the facility plans to implement the recommendation within the next 5 years. In
you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not feasible, a regulatory
e expected input type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

r "P2 Actions and
imates of costs,
he facility to learn
ty) and in Column J
and water pollution,
select “Y” if a case
ate, Column I has a
hen your follow-up
next 5 years. In
asible, a regulatory
e appropriate format

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
Outcomes," enter each P2 recom
annual savings and annual reduc
which P2 recommendations it im
select a federal Fiscal Year (the O
see the section in the “Getting Sta
study covers this implemented ac
"Y," and Column J has a Fiscal Yea
confirms that a P2 recommendat
Column N, if the facility has no pl
barrier, etc.).5. The cell will be hig
to remove the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
comes," enter each P2 recommendation provided to the facility during technical assistance in Column A, one recomm
ual savings and annual reductions per recommendation in Columns B – H. 3. Once you have followed up with a facili
ch P2 recommendations it implemented. 4.a. When your follow-up confirms a P2 recommendation was implemented
ect a federal Fiscal Year (the Oct. 1 - Sept. 30 period when implementation occurred). In Columns B - H, enter updated
the section in the “Getting Started” Tab on “Calculating Outcomes in the Facility Tabs.” In Column K, enter “quantity”
dy covers this implemented action. Please note: Columns B - H values for a row will tally in this tab’s Total rows and in
and Column J has a Fiscal Year selected. If more steps of a recommendation get implemented in a second year, add
firms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In Column M, enter "Y "if the
umn N, if the facility has no plans to implement the recommendation and can tell you why, enter the barrier(s) to imp
rier, etc.).5. The cell will be highlighted yellow if your response is different than the expected input type (e.g., letters i
emove the highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs. 2. Under "P2 Actions and
assistance in Column A, one recommendation per row. You may, at your option, enter initial estimates of costs,
ce you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn
recommendation was implemented, in Column I select “Y“ (yes it was implemented at this facility) and in Column J
d). In Columns B - H, enter updated cost, savings and outcome values. For calculating MTCO2e and water pollution,
abs.” In Column K, enter “quantity” information associated with implementation. In Column L, select “Y” if a case
ll tally in this tab’s Total rows and in the Aggregate Results tab only if Row 20 has a follow-up date, Column I has a
mplemented in a second year, add a row for phase 2 steps and complete Columns B – K. 4.b. When your follow-up
umn I. In Column M, enter "Y "if the facility plans to implement the recommendation within the next 5 years. In
you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not feasible, a regulatory
e expected input type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

r "P2 Actions and
imates of costs,
he facility to learn
ty) and in Column J
and water pollution,
select “Y” if a case
ate, Column I has a
hen your follow-up
next 5 years. In
asible, a regulatory
e appropriate format

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
Outcomes," enter each P2 recom
annual savings and annual reduc
which P2 recommendations it im
select a federal Fiscal Year (the O
see the section in the “Getting Sta
study covers this implemented ac
"Y," and Column J has a Fiscal Yea
confirms that a P2 recommendat
Column N, if the facility has no pl
barrier, etc.).5. The cell will be hig
to remove the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
comes," enter each P2 recommendation provided to the facility during technical assistance in Column A, one recomm
ual savings and annual reductions per recommendation in Columns B – H. 3. Once you have followed up with a facili
ch P2 recommendations it implemented. 4.a. When your follow-up confirms a P2 recommendation was implemented
ect a federal Fiscal Year (the Oct. 1 - Sept. 30 period when implementation occurred). In Columns B - H, enter updated
the section in the “Getting Started” Tab on “Calculating Outcomes in the Facility Tabs.” In Column K, enter “quantity”
dy covers this implemented action. Please note: Columns B - H values for a row will tally in this tab’s Total rows and in
and Column J has a Fiscal Year selected. If more steps of a recommendation get implemented in a second year, add
firms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In Column M, enter "Y "if the
umn N, if the facility has no plans to implement the recommendation and can tell you why, enter the barrier(s) to imp
rier, etc.).5. The cell will be highlighted yellow if your response is different than the expected input type (e.g., letters i
emove the highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs. 2. Under "P2 Actions and
assistance in Column A, one recommendation per row. You may, at your option, enter initial estimates of costs,
ce you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn
recommendation was implemented, in Column I select “Y“ (yes it was implemented at this facility) and in Column J
d). In Columns B - H, enter updated cost, savings and outcome values. For calculating MTCO2e and water pollution,
abs.” In Column K, enter “quantity” information associated with implementation. In Column L, select “Y” if a case
ll tally in this tab’s Total rows and in the Aggregate Results tab only if Row 20 has a follow-up date, Column I has a
mplemented in a second year, add a row for phase 2 steps and complete Columns B – K. 4.b. When your follow-up
umn I. In Column M, enter "Y "if the facility plans to implement the recommendation within the next 5 years. In
you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not feasible, a regulatory
e expected input type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

r "P2 Actions and
imates of costs,
he facility to learn
ty) and in Column J
and water pollution,
select “Y” if a case
ate, Column I has a
hen your follow-up
next 5 years. In
asible, a regulatory
e appropriate format

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
Outcomes," enter each P2 recom
annual savings and annual reduc
which P2 recommendations it im
select a federal Fiscal Year (the O
see the section in the “Getting Sta
study covers this implemented ac
"Y," and Column J has a Fiscal Yea
confirms that a P2 recommendat
Column N, if the facility has no pl
barrier, etc.).5. The cell will be hig
to remove the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
indicated as "Y" ("Was the Recommendatio
actual implementation at the facility.

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
comes," enter each P2 recommendation provided to the facility during technical assistance in Column A, one recomm
ual savings and annual reductions per recommendation in Columns B – H. 3. Once you have followed up with a facili
ch P2 recommendations it implemented. 4.a. When your follow-up confirms a P2 recommendation was implemented
ect a federal Fiscal Year (the Oct. 1 - Sept. 30 period when implementation occurred). In Columns B - H, enter updated
the section in the “Getting Started” Tab on “Calculating Outcomes in the Facility Tabs.” In Column K, enter “quantity”
dy covers this implemented action. Please note: Columns B - H values for a row will tally in this tab’s Total rows and in
and Column J has a Fiscal Year selected. If more steps of a recommendation get implemented in a second year, add
firms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In Column M, enter "Y "if the
umn N, if the facility has no plans to implement the recommendation and can tell you why, enter the barrier(s) to imp
rier, etc.).5. The cell will be highlighted yellow if your response is different than the expected input type (e.g., letters i
emove the highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).- If column J i
ed as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be updated based o
implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs. 2. Under "P2 Actions and
assistance in Column A, one recommendation per row. You may, at your option, enter initial estimates of costs,
ce you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn
recommendation was implemented, in Column I select “Y“ (yes it was implemented at this facility) and in Column J
d). In Columns B - H, enter updated cost, savings and outcome values. For calculating MTCO2e and water pollution,
abs.” In Column K, enter “quantity” information associated with implementation. In Column L, select “Y” if a case
ll tally in this tab’s Total rows and in the Aggregate Results tab only if Row 20 has a follow-up date, Column I has a
mplemented in a second year, add a row for phase 2 steps and complete Columns B – K. 4.b. When your follow-up
umn I. In Column M, enter "Y "if the facility plans to implement the recommendation within the next 5 years. In
you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not feasible, a regulatory
e expected input type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format

NAICS Search (website)

nded P2 Action (not required).- If column J is
annual reductions must be updated based on the

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

r "P2 Actions and
imates of costs,
he facility to learn
ty) and in Column J
and water pollution,
select “Y” if a case
ate, Column I has a
hen your follow-up
next 5 years. In
asible, a regulatory
e appropriate format

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave 5 years? (Y or
What was the barrier
N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
indicated as "Y" ("Was the Recommendatio
actual implementation at the facility.

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).- If column J i
ed as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be updated based o
implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).- If column J is
annual reductions must be updated based on the

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
Outcomes," enter each P2 recom
annual savings and annual reduc
which P2 recommendations it im
select a federal Fiscal Year (the O
see the section in the “Getting Sta
study covers this implemented ac
"Y," and Column J has a Fiscal Yea
confirms that a P2 recommendat
Column N, if the facility has no pl
barrier, etc.).5. The cell will be hig
to remove the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
comes," enter each P2 recommendation provided to the facility during technical assistance in Column A, one recomm
ual savings and annual reductions per recommendation in Columns B – H. 3. Once you have followed up with a facili
ch P2 recommendations it implemented. 4.a. When your follow-up confirms a P2 recommendation was implemented
ect a federal Fiscal Year (the Oct. 1 - Sept. 30 period when implementation occurred). In Columns B - H, enter updated
the section in the “Getting Started” Tab on “Calculating Outcomes in the Facility Tabs.” In Column K, enter “quantity”
dy covers this implemented action. Please note: Columns B - H values for a row will tally in this tab’s Total rows and in
and Column J has a Fiscal Year selected. If more steps of a recommendation get implemented in a second year, add
firms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In Column M, enter "Y "if the
umn N, if the facility has no plans to implement the recommendation and can tell you why, enter the barrier(s) to imp
rier, etc.).5. The cell will be highlighted yellow if your response is different than the expected input type (e.g., letters i
emove the highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs. 2. Under "P2 Actions and
assistance in Column A, one recommendation per row. You may, at your option, enter initial estimates of costs,
ce you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn
recommendation was implemented, in Column I select “Y“ (yes it was implemented at this facility) and in Column J
d). In Columns B - H, enter updated cost, savings and outcome values. For calculating MTCO2e and water pollution,
abs.” In Column K, enter “quantity” information associated with implementation. In Column L, select “Y” if a case
ll tally in this tab’s Total rows and in the Aggregate Results tab only if Row 20 has a follow-up date, Column I has a
mplemented in a second year, add a row for phase 2 steps and complete Columns B – K. 4.b. When your follow-up
umn I. In Column M, enter "Y "if the facility plans to implement the recommendation within the next 5 years. In
you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not feasible, a regulatory
e expected input type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

r "P2 Actions and
imates of costs,
he facility to learn
ty) and in Column J
and water pollution,
select “Y” if a case
ate, Column I has a
hen your follow-up
next 5 years. In
asible, a regulatory
e appropriate format

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier to
(Y or N)
blank)
implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
2. Under "P2 Actions and Outcom
estimates of costs, annual saving
3. Once you have followed up wit
4.a. When your follow-up confirm
period when implementation occ
“Calculating Outcomes in the Fac
note: Columns B - H values for a
selected. If more steps of a recom
4.b. When your follow-up confirm
the next 5 years. In Column N, if
feasible, a regulatory barrier, etc
5. The cell will be highlighted yell
the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
Under "P2 Actions and Outcomes," enter each P2 recommendation provided to the facility during technical assistance
mates of costs, annual savings and annual reductions per recommendation in Columns B – H.
Once you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn w
When your follow-up confirms a P2 recommendation was implemented, in Column I select “Y“ (yes it was implement
iod when implementation occurred). In Columns B - H, enter updated cost, savings and outcome values. For calculati
culating Outcomes in the Facility Tabs.” In Column K, enter “quantity” information associated with implementation. I
e: Columns B - H values for a row will tally in this tab’s Total rows and in the Aggregate Results tab only if Row
ected. If more steps of a recommendation get implemented in a second year, add a row for phase 2 steps and comp
When your follow-up confirms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In C
next 5 years. In Column N, if the facility has no plans to implement the recommendation and can tell you why, enter
sible, a regulatory barrier, etc.).
he cell will be highlighted yellow if your response is different than the expected input type (e.g., letters instead of nu
highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs.
e facility during technical assistance in Column A, one recommendation per row. You may, at your option, enter initia
lumns B – H.
lowed up with the facility to learn which P2 recommendations it implemented.
mn I select “Y“ (yes it was implemented at this facility) and in Column J select a federal Fiscal Year (the Oct. 1 - Sept. 30
gs and outcome values. For calculating MTCO 2e and water pollution, see the section in the “Getting Started” Tab on
n associated with implementation. In Column L, select “Y” if a case study covers this implemented action. Please
Aggregate Results tab only if Row 20 has a follow-up date, Column I has a "Y," and Column J has a Fiscal Year
d a row for phase 2 steps and complete Columns B – K.
emented, enter "N" in Column I. In Column M, enter "Y "if the facility plans to implement the recommendation within
ndation and can tell you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not

nput type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format to remove

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

ur option, enter initial

r (the Oct. 1 - Sept. 30
ing Started” Tab on
ed action. Please
n J has a Fiscal Year

commendation within
g., high cost, not

e format to remove

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
Outcomes," enter each P2 recom
annual savings and annual reduc
which P2 recommendations it im
select a federal Fiscal Year (the O
see the section in the “Getting Sta
study covers this implemented ac
"Y," and Column J has a Fiscal Yea
confirms that a P2 recommendat
Column N, if the facility has no pl
barrier, etc.).5. The cell will be hig
to remove the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
comes," enter each P2 recommendation provided to the facility during technical assistance in Column A, one recomm
ual savings and annual reductions per recommendation in Columns B – H. 3. Once you have followed up with a facili
ch P2 recommendations it implemented. 4.a. When your follow-up confirms a P2 recommendation was implemented
ect a federal Fiscal Year (the Oct. 1 - Sept. 30 period when implementation occurred). In Columns B - H, enter updated
the section in the “Getting Started” Tab on “Calculating Outcomes in the Facility Tabs.” In Column K, enter “quantity”
dy covers this implemented action. Please note: Columns B - H values for a row will tally in this tab’s Total rows and in
and Column J has a Fiscal Year selected. If more steps of a recommendation get implemented in a second year, add
firms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In Column M, enter "Y "if the
umn N, if the facility has no plans to implement the recommendation and can tell you why, enter the barrier(s) to imp
rier, etc.).5. The cell will be highlighted yellow if your response is different than the expected input type (e.g., letters i
emove the highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs. 2. Under "P2 Actions and
assistance in Column A, one recommendation per row. You may, at your option, enter initial estimates of costs,
ce you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn
recommendation was implemented, in Column I select “Y“ (yes it was implemented at this facility) and in Column J
d). In Columns B - H, enter updated cost, savings and outcome values. For calculating MTCO2e and water pollution,
abs.” In Column K, enter “quantity” information associated with implementation. In Column L, select “Y” if a case
ll tally in this tab’s Total rows and in the Aggregate Results tab only if Row 20 has a follow-up date, Column I has a
mplemented in a second year, add a row for phase 2 steps and complete Columns B – K. 4.b. When your follow-up
umn I. In Column M, enter "Y "if the facility plans to implement the recommendation within the next 5 years. In
you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not feasible, a regulatory
e expected input type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

r "P2 Actions and
imates of costs,
he facility to learn
ty) and in Column J
and water pollution,
select “Y” if a case
ate, Column I has a
hen your follow-up
next 5 years. In
asible, a regulatory
e appropriate format

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!

FY22-23 P2 Grants Template 1: Facility-Level Reporting for Direct P2 Technical Assistance to

FACILITY 1

How to Use this Tab:

1. Under "Facility Information," e
Outcomes," enter each P2 recom
annual savings and annual reduc
which P2 recommendations it im
select a federal Fiscal Year (the O
see the section in the “Getting Sta
study covers this implemented ac
"Y," and Column J has a Fiscal Yea
confirms that a P2 recommendat
Column N, if the facility has no pl
barrier, etc.).5. The cell will be hig
to remove the highlighting.

Grant Recipient: Sample Grant Recipient Name
Grant Project Number: Sample Grant Project Number

Facility Information (Only business facilities)
Facility Name (optional) Need some kind of facility description even if generic
EPA Facility ID Number (optional)
Facility Contact (optional)
Facility City (optional)
Facility State (2-letter abbreviation)
EPA Region (based on Facility State)
Facility NAICS Code (3 to 6 digits)
NEA for this Facility (use drop-down)
Date P2 Recommendations Provided to Facility (mm/dd/yyyy)
Date(s) of Follow-up (mm/dd/yyyy)

xx
xx
xx
xx
VA
Region 3
123456
NEA 3 – Automotive Manufacturin
1/31/2022
3/1/2022

P2 Actions and Outcomes
List each P2 recommendation provided to the facility on a separate line. Include the
what, the how, and "quantity" information if that is needed to calculate cost, savings
and annual reductions, e.g., # LEDs, # solar panels.

- You may enter preliminary estimates of c
- If column J is indicated as "Y" ("Was the R
based on the actual implementation at the

$

Recommended P2 Actions
Ex. Reduce water use for cleaning (in coating dept.) by using LVHP
spray nozzles and worker training.
Ex. Reduce paint and solvent use, and thus reduce VOC emissions to
water, by installing electrostatic painting equip. & using infrared
curing.

One-time Cost to
Implement ($)

Ex. Install solar array.

TOTAL IMPLEMENTED
TOTAL IMPLEMENTED 2019
TOTAL IMPLEMENTED 2020
TOTAL IMPLEMENTED 2021
TOTAL IMPLEMENTED 2022
TOTAL IMPLEMENTED 2023
TOTAL IMPLEMENTED 2024

$0
$0
$0
$0
$0
$0
$0

2 Technical Assistance to Individual Facilities

Under "Facility Information," enter data in rows 11-21. On Row 12: Enter any EPA program Facility ID or look up the EP
comes," enter each P2 recommendation provided to the facility during technical assistance in Column A, one recomm
ual savings and annual reductions per recommendation in Columns B – H. 3. Once you have followed up with a facili
ch P2 recommendations it implemented. 4.a. When your follow-up confirms a P2 recommendation was implemented
ect a federal Fiscal Year (the Oct. 1 - Sept. 30 period when implementation occurred). In Columns B - H, enter updated
the section in the “Getting Started” Tab on “Calculating Outcomes in the Facility Tabs.” In Column K, enter “quantity”
dy covers this implemented action. Please note: Columns B - H values for a row will tally in this tab’s Total rows and in
and Column J has a Fiscal Year selected. If more steps of a recommendation get implemented in a second year, add
firms that a P2 recommendation has not yet been implemented, enter "N" in Column I. In Column M, enter "Y "if the
umn N, if the facility has no plans to implement the recommendation and can tell you why, enter the barrier(s) to imp
rier, etc.).5. The cell will be highlighted yellow if your response is different than the expected input type (e.g., letters i
emove the highlighting.

mple Grant Recipient Name
mple Grant Project Number

ion 3
456
A 3 – Automotive Manufacturing and Maintenance
1/2022

may enter preliminary estimates of costs, annual savings and annual reductions for each Recommended P2 Action (not required).
umn J is indicated as "Y" ("Was the Recommendation Implemented at this Facility?"), the cost, annual savings and annual reductions must be u
on the actual implementation at the facility.

$

Annual Reductions
Annual Savings
from P2 Action
($)

Hazardous
Material Input Hazardous Waste
(lbs)
(lbs)

Air Emissions
(lbs)

Water Pollution (lbs)
Select header for help

13,600

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

$0

0

0

0

0

program Facility ID or look up the EPA Registry (facility) ID on https://www.epa.gov/frs. 2. Under "P2 Actions and
assistance in Column A, one recommendation per row. You may, at your option, enter initial estimates of costs,
ce you have followed up with a facility, enter in Row 20 the date(s) when you followed up with the facility to learn
recommendation was implemented, in Column I select “Y“ (yes it was implemented at this facility) and in Column J
d). In Columns B - H, enter updated cost, savings and outcome values. For calculating MTCO2e and water pollution,
abs.” In Column K, enter “quantity” information associated with implementation. In Column L, select “Y” if a case
ll tally in this tab’s Total rows and in the Aggregate Results tab only if Row 20 has a follow-up date, Column I has a
mplemented in a second year, add a row for phase 2 steps and complete Columns B – K. 4.b. When your follow-up
umn I. In Column M, enter "Y "if the facility plans to implement the recommendation within the next 5 years. In
you why, enter the barrier(s) to implementation identified by the facility (e.g., high cost, not feasible, a regulatory
e expected input type (e.g., letters instead of numbers). Delete the response and re-enter in the appropriate format

NAICS Search (website)

nded P2 Action (not required).
al savings and annual reductions must be updated

ons

Include updated "quantity" information, e.g.,
# LEDs, # solar panels, that relates to cost,
annual savings and annual reductions.

Was the Recommendation Implemented at This Facility?
MTCO2e Emissions

(metric tons)

Water Use (gal.)

Y or N

If yes, fiscal year
implemented
(Oct. 1 - Sept. 30)

9,000,000

Y

2022

N

Comments

Washer optimization completed.
Estimated for VOCs.

1,326

1,326

9,000,000

0

0

0

0

0

0

1,326

9,000,000

0

0

0

0

Y

2022

1

1

installed 1.2-megwatt solar array.

1

r "P2 Actions and
imates of costs,
he facility to learn
ty) and in Column J
and water pollution,
select “Y” if a case
ate, Column I has a
hen your follow-up
next 5 years. In
asible, a regulatory
e appropriate format

If Not Implemented:
Case Study
Developed Plan to within
(Y or leave
5 years?
What was the barrier
(Y or N)
blank)
to implementation?

Y

Awaiting permit
amendment.

Y

1

#REF!

#REF!