Document
Burden Tables
ICR 202611-2060-007 · OMB 2060-0666 · Object 175024000.
Document Viewer [xlsx]
Document Metadata
| File Type | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet |
|---|---|
| File Title | Burden Tables |
| Last Modified By | Calc |
| File Modified | 2026-07-28 |
| File Created | 2026-11-11 |
| Conversion State | complete |
Extracted Text
114.66 Annual Respondent Burden and Cost (40 CFR Part 63 Subpart HHHHHHH) (A)Respondent Hours per Occurrence (Technical Hours) 51.95 Labor rates based on May 2025 data from the Bureuf of Labor Statistics for NAICS 325000 174.03 (B) Number of Occurrences per Respondent per Year (C) Hours per Respondent per Year (C = A x B) (D) Number of Respondents per Year a (E) Technical Hours per Year (E = C x D) (F) Management Hours per Year (F = E x 0.05) 16 1 16 0 0 0 0 $0 a) Stripped Wastewater: TOHAP e -10 12 -117 0 0 0 0 $0 b) Uncontrolled Wastewater: TOHAP e -24 1 -24 0 0 0 0 $0 Burden Item 1. Applications not applicable 2. Surveys and Studies not applicable (G)Clerical Hours (H) per Year(G = E x Total Labor Costs 0.1) per Year b 3. Reporting Requirements A. Familiarization with Regulatory Requirements c,d B. Required Activities 1) Periodic Performance Test, Sampling, and Report C. Create Information Incl. in 3.B D. Gather Information Incl. in 3.E E. Report Preparation not applicable g Subtotal for Reporting Requirements 0 $0 4. Recordkeeping Requirements A. Familiarization with Regulatory Requirements Incl. in 3.A B. Implement Activities not applicable C. Develop Record System not applicable D. Record Information 1) Records of TOHAP Wastewater Requirements E. Personnel Training F. Time for Audits TOTAL LABOR BURDEN AND COSTS (rounded) GRAND TOTAL (rounded) f 1 -15 0 0 0 0 $0 not applicable Subtotal for Recordkeeping Requirements TOTAL CAPITAL AND O&M COST (rounded) -15 Incl. in 3.B f f 0 $0 0 $0 $0 $0 2026: 58.62 79.01 31.73 (E) (F) Technical PersonManagement Hours per Year Person-Hours per (E = C x D) Year (F = E x 0.05) (G) Clerical PersonHours per Year (G = E x 0.1) Annual EPA Burden and Cost (40 CFR Part 63 Subpart HHHHHHH) (A) (B) (C) EPA Person-Hours Number of EPA Person-Hours per Occurrence Occurrences per per Plant per Year Plant per Year (C = A x B) Burden Item 1. Applications (D) Plants per Year not applicable 2. Familiarization with Rule Requirements 2 1 2 10 20 1 2 A. Observe initial performance tests 48 1 48 0 0 0 0 B. Excess emissions -- Enforcement Activities 24 1 24 0 0 0 0 1 32 0 0 0 0 a 3. Required Activities C. Create Information not applicable D. Gather Information not applicable not applicable c E. Report Reviews F. Prepare annual summary report 32 d 4. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = TOTAL ANNUAL BURDEN AND COST (rounded) e n/a per trip 23 ATTACHMENT E: RECORDKEEPING AND REPORTING COST ALGORITHM February 9, 2012 Record Keeping and Reporting Burden by Emission Point Note: This table is used to caluclate the record keeping and reporting burden by emission point for the PVC NESHAP. The costs presented in the table below represent costs not otherwise included in the PVC NESHAP Impact estimate (i.e., testing and monitoring costs are already included in the PVC NESHAP impacts estimate, therefore, they are not included in the table below). The costs presented in the table below should be added to the previously calculated PVC Impacts to obtain an impacts estimate which includes record keeping and reporting. Record Keeping and Reporting Burden By Emission Point Annual Cost ($/yr) Initial Cost Initial Notes Annual Notes ($) Yr 1 Yr 2 Yr 3 Resins #REF! a,b,d #REF! #REF! #NAME? e,f,g Process Vents #REF! a,b,c,d #REF! #REF! #NAME? e,f,g Wastewater #REF! a,b,d #REF! #REF! #NAME? e,f,g Equipment Leaks #REF! a,b,d #REF! #REF! #NAME? e,f,g,h Storage Vessels #REF! a,d #REF! #REF! #NAME? e,f,g Heat Exchange Systems #REF! a,b,d #REF! #REF! #NAME? e,f,g Other Sources #REF! a,d #REF! #REF! #NAME? e,f,g Total #REF! #REF! #REF! #NAME? a Labor/Non Labor Costs to "Read/Understand Rule Requirements" divided by 7 emission points b Initial Performance Test/Sampling/Report c Establishment of operating parameters and monitoring plan d Report preparation for item 3.E.1-6 divided by 7 emission points e Periodic sampling/testing/and monitoring (not applicable for process vents in year 1) f Years 2 and 3 include items 3.E.5 and 3.E.6 divided by 7 emission points g In year 2 and 3, recordkeeping items under 4.D are included h includes annual labor cost for PRD monitoring system Emission Point Equipment Leaks BTF Costs Calculation on a Facility Basis Equipment Leaks #REF! Equipment Leaks #REF! Equipment Leaks #REF! #REF! #REF! #REF! #REF! #REF! #REF! #NAME? Facilities going from V to UU #NAME? MACT #NAME? Incremental BTF Costs for Facilities going from V to UU 2. Required activities a. Perf. spec. tests (certif.) for CMS 11 1 11 Notes: 2. Person-hours per occurrence for CMS performance specification costs are based on the performance specification costs to certify CMS ($700) divided by the composite hourly labor rate ($66.41/hr). Sources: 1. Bureau of Labor Statistics, Occupational Employment Statistics, May 2008 National Industry-Specific Occupational Employment and Wage Estimates. 2. Hospital/Medical/Infectious Waste Incinerators (HMIWI) [EPA-HQ-OAR2006-0534] Testing and Monitoring Options and Costs Memo (IV-B-66). Capital/Startup vs. Operation and Maintenance (O&M) Costs (A) Capital/Startup Cost for One Respondent (B) Number of New Respondents (C) (D) Total Annual O&M Costs Capital/Startup/O&M Item Capital/Startup for One Cost Respondent (C = A x B) $820 0 $0 -$9,840 Stripped Wastewater: TOHAP Testing 1 2 $2,091 0 $0 -$2,091 Uncontrolled Wastewater: TOHAP Testing Total $0 Note: Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. O&M costs shown as negative to reflect savings from no longer performing TOHAP wastewater testing. 1 Average cost for TOHAP testing is approximately $820 per major source, and 1 test per major source per month. 2 TOHAP testing on uncontrolled streams is performed annually. There are an average of 3 uncontrolled streams per facility. (E) Number of Respondents with O&M 0 0 (F) Total O&M (F = D x E) $0 $0 $0