7 CFR Part 1; 43 CFR Part 45: 50 CFR Part 221; The Alternatives Process in Hydropower Licensing

OMB 1094-0001 · DOI/OHA.

OMB 1094-0001

Under FPA section 33, the Secretary of the Department involved must accept the proposed alternative if the Secretary determines, based on substantial evidence provided by a party to the license proceeding or otherwise available to the Secretary, (a) that the alternative condition provides for the adequate protection and utilization of the reservation, or that the alternative prescription will be no less protective than the fishway initially proposed by the Secretary, and (b) that the alternative will either cost significantly less to implement or result in improved operation of the project works for electricity production. In order to make this determination, the regulations require that all of the following information be collected: (1) a description of the alternative, in an equivalent level of detail to the Department’s preliminary condition or prescription; (2) an explanation of how the alternative: (i) if a condition, will provide for the adequate protection and utilization of the reservation; or (ii) if a prescription, will be no less protective than the fishway prescribed by the bureau; (3) an explanation of how the alternative, as compared to the preliminary condition or prescription, will: (i) cost significantly less to implement; or (ii) result in improved operation of the project works for electricity production; (4) an explanation of how the alternative or revised alternative will affect: (i) energy supply, distribution, cost, and use; (ii) flood control; (iii) navigation; (iv) water supply; (v) air quality; and (vi) other aspects of environmental quality; and (5) specific citations to any scientific studies, literature, and other documented information relied on to support the proposal. This notice of proposed renewal of an existing information collection is being published by the Office of Environmental Policy and Compliance, Department of the Interior, on behalf of all three Departments, and the data provided below covers anticipated responses (alternative conditions/prescriptions and associated information) for all three Departments.

The latest form for 7 CFR Part 1; 43 CFR Part 45: 50 CFR Part 221; The Alternatives Process in Hydropower Licensing expires 2027-11-30 and can be found here.