OMB control number
Congestion Mitigation and Air Quality Improvement Program
OMB 2125-0614 · DOT/FHWA.
The development and maintenance of a cumulative database of all CMAQ projects is required by 23 U.S.C. 149(i)(1). This database must include specific information about each project such as name, location, sponsor, cost, and to the extent already measured by the project sponsor, cost-effectiveness based on reductions in emissions and congestion. The database must be readily available for public review either by publication or in electronically accessible format and means. States provide annual reports on all CMAQ obligations and deobligations taking place in each fiscal year. These reports include obligations of program funds; descriptions of individual projects; and potential impacts on air quality and congestion. The data provided in the annual reports and the CMAQ Public Access System allows for transparency, showing that the program continues to provide incremental benefits through enhanced regional and local air quality improvement, and through contributions to congestion relief. In order to populate the database, FHWA division offices, State DOTs, and MPOs develop a process for entering and approving project data in a timely manner. State DOTs submit the annual report to be approved by the FHWA Division by March 1 and FHWA HQ approves it by July 1 following the end of the previous Federal fiscal year (September 30). The annual report covers all CMAQ obligations for that previous fiscal year. Thus, State DOTs and MPOs report the data early enough that FHWA has time to review and comment on the report.
The latest form for Congestion Mitigation and Air Quality Improvement Program expires 2028-07-31 and can be found here.
Document Name |
|---|
Supplementary Document |
Supplementary Document |
Supplementary Document |
Public Comments |
Supporting Statement A |
| Reinstatement without change of a previously approved collection | 2025-06-16 | ||
|
Improperly submitted and continue |
Extension without change of a currently approved collection | 2025-05-09 | |
|
Approved without change |
Extension without change of a currently approved collection | 2022-02-22 | |
|
Approved without change |
Extension without change of a currently approved collection | 2018-06-25 | |
|
Approved with change |
Reinstatement without change of a previously approved collection | 2015-05-07 | |
|
Approved without change |
Reinstatement without change of a previously approved collection | 2011-02-28 | |
|
Improperly submitted |
Reinstatement with change of a previously approved collection | 2008-11-25 | |
|
Approved with change |
New collection (Request for a new OMB Control Number) | 2007-03-13 |