OMB control number
Building American Production Capacity for Electric Port Equipment and other Port Infrastructure Items
OMB 2133-0556 · DOT/MARAD.
The Building American Production Capacity for Electric Port Equipment and other Port Infrastructure Items collection is essential to identify the demand for electrically powered port equipment and infrastructure items supported by pooled procurement. This initiative, which is comprised of an online survey and interview with diverse American port stakeholders, will also support Buy American/Buy America objectives and American manufacturers of electrically powered port equipment. Survey responses will also help to identify a suitable port through which the procurement of electrically powered port equipment and infrastructure can be initiated. This survey is being conducted through a cooperative agreement between the Maritime Administration (MARAD) and the American Association of Port Authorities (AAPA). Currently, many U.S. port authorities and marine terminal operators purchase diesel-powered dockside equipment, necessary for loading, unloading, and organizing shipping containers. Much of this equipment is foreign made, in short supply, and increases exposure to dangerous emissions that contribute to climate change. The recent passage of the Infrastructure Investment and Jobs Act (IIJA), commonly referred to as the Bipartisan Infrastructure Bill, which was signed into law on November 15, 2021, provides a federal grant stream that will modernize U.S. ports infrastructure over the next five years. Specifically, this Bill assures resources for the development of a domestic capacity of clean electric-powered American alternatives to replace and reduce emissions by predominantly foreign-made diesel port equipment.
The latest form for Building American Production Capacity for Electric Port Equipment and other Port Infrastructure Items expires 2026-12-31 and can be found here.
Document Name |
|---|
Form and Instruction |
Form and Instruction |
Form and Instruction |
Form and Instruction |
Justification for No Material/Nonsubstantive Change |
Supplementary Document |
Supplementary Document |
Supplementary Document |
Supplementary Document |
Supplementary Document |
Supplementary Document |
Supporting Statement B |
Supporting Statement A |
Supporting Statement A |
|
Approved with change |
No material or nonsubstantive change to a currently approved collection | 2024-07-03 | |
|
Approved with change |
New collection (Request for a new OMB Control Number) | 2023-06-09 |
Building American Production Capacity for Electric Port Equipment and other Port Infrastructure Items
Federal Enterprise Architecture: Transportation - Water Transportation
| Form MA-2002 | AAPA-MARAD Equipment Survey | Fillable Fileable | Form and instruction |
| Form MA-2003 | AAPA-MARAD Manufacturer Interview Guide | Fillable Fileable | Form and instruction |
Review document collections for all forms, instructions, and supporting documents - including paper/printable forms.