Construction Requirements; Interim Reports, Sections 27.14(g)-(l)

OMB 3060-1161

OMB 3060-1161

On October 29, 2013, the Commission issued a Report and Order and Order of Proposed Modification in WT Docket No. 12-69 and WT Docket No. 12-332, FCC 13-136 (700 MHz Interoperability Order), in which it revised certain technical rules and extended or waived construction deadlines for certain licenses in order to resolve issues resulting from the lack of interoperability in the Lower 700 MHz Band. The Report and Order did not revise any of the information collection requirements that are contained in this collection. It simply waived or revised the dates on which the information collection requirements are required. Interim reports are used by the Commission to determine the progress made by licensees to meet specific performance requirements, and the manner in which their spectrum is being utilized, and to determine whether licensees have complied with the Commission's performance benchmarks. The Commission will also use the information to evaluate whether further assessment of the rules or other actions are necessary in the event spectrum is being stockpiled or warehoused, or if it is otherwise not being made available despite existing demand.

The latest form for Construction Requirements; Interim Reports, Sections 27.14(g)-(l) expires 2023-09-30 and can be found here.

Latest Forms, Documents, and Supporting Material

© 2024 OMB.report | Privacy Policy