SECTION 73.546 REQUIRES THAT ALL
NONCOMMERCIAL FM LICENSEES WISHING TO ESTABLISH AN ATS MONITORING
AND ALARM POINT OTHER THAN AT THE STATION TRANSMITTER, MAIN STUDIO,
OR AN AUTHORIZED REMOTE CONTROL POINT SUBMIT AN INFORMAL REQUEST TO
THE FCC WITH A DESCRIPTION OF THE LOCATION OF THE POINT AND STATING
THE BASIS FOR ITS SELECTION. THIS REQUEST (NOTIFICATION) IS TO
ASSURE THE COMMISSION THAT GOOD ENGINEERING PRACTICES ARE
APPLIED.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.