Pursuant to 5
CFR 1320 and PRA this ICR is approved through December 1991. OMB is
concerned that the emmissions data on this form may not meet the
practical utility requirements in our regulations. Before
submitting the ICR for renewal, EIA must describe in detail how the
information on pollution controls was actually used.
Inventory as of this Action
Requested
Previously Approved
12/31/1991
12/31/1991
11/30/1990
2,079
0
2,800
4,719
0
9,310
0
0
0
EIA-867 IS REQUIRED ANNUALLY FROM
NONUTILITY POWER PRODUCERS WHO OWN OR PLAN ON INSTALLING ELECTRIC
GENERATION EQUIPMENT WITH A TOTAL CAPACITY OF 5 MEGAWATTS OR MORE
AT AN EXISTING OR PROPOSED SITE. THE DATA WILL BE USED TO AUGMENT
EXISTING ELECTRIC UTILITY DATA, AND FOR ELECTRIC POWER FORECASTS
AND ANALYSES.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.