This ICR is approved for use through December 31, 1992, as requested. However, the agency must make the following changes to the form to clarify that a respondent need not answer Schedule III, Section A, Ite 6 if the information is not readily available: 1) On the form, to the right of the question, the agency shall place a box entitled "Information Not Readily Available." 2) The directions for this question should be changed to clarify that if this data is not readily available, it is not necessary to conduct additional analysis on the fuel.
Inventory as of this Action
Requested
Previously Approved
12/31/1992
12/31/1992
12/31/1992
893
0
908
16,514
0
16,380
0
0
0
ELECTRIC POWER GENERATION, ELECTRIC POWER PLANTS, NUCLEAR POWER PLANT FORM EIA-767 IS A CONSOLIDATION OF DATA REQUIREMENTS OF FERC, EPA, BEA, DOE(PE), AND DOE(FE). DATA ARE COLLECTED ANNUALLY FROM STEAM-ELECTRIC POWER PLANTS OF 10 MEGAWATTS(MW) OR MORE. DATA CONCERN AIR EMISSION AND WATER QUALITY AND ARE USED FOR ECONOMIC, REGULATORY, AND ENVIRONMENTAL ANALYSIS. POWER PLANTS BETWEEN 10 MW AND 100 MW FIL PAGES 6, 13, AND 14 FUEL AND FGD DATA.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.