This ICR is approved for six months. Before submitting this ICR for renewal, EPA shall submit to OMB a written information analysis identifying all duplicative and unnecessarily burdensome requirements. In particular, the analysis should consider how EPA and approved State can use the RCRIS data base and thus eliminate additional requests for data already collected. During the information analysis, EPA shall se help from the public, including representatives of the regulated community, to identify problems with current requirements. EPA shall document these efforts and submit them with the information analysis. addition, any previous, additional terms of clearance for this ICR als must be considered before this ICR is submitted for renewal.
Inventory as of this Action
Requested
Previously Approved
09/30/1992
09/30/1992
4,443
0
0
404,850
0
0
0
0
0
THE ICR CONSOLIDATES THE GENERAL FACILITY REQUIREMENTS FOR OWNERS/ OPERATORS OF TSDFS, WHICH INCLUDES MAINTAINING RECORDS OF WASTES HANDLED, OPERATING METHODS, LOCATION, DESIGN AND CONSTRUCTION OF FACILITIES, CONTINGENCY PLANS, OPERATIONAL CONSIDERATIONS, AND FINANCIAL REQUIREMENTS.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.