This ICR is
approved for four months. This approval period supersedes the three
month extension contained in the Information Collection Worksheet
granted in this ICR on December 30, 1992. As discussed on February
9, 1993, in a meeting between OIRA and EPA staff, OIRA will provide
EPA a detailed list and description of duplicative and excessively
burdensome RCRA reporting requirements during the week of February
22, 1993. EPA staff agreed to address the listed concerns within
the subsequent two weeks. The revised ICR will discuss issues
raised through these discussions and outline to the extent
appropriate the likely next steps. All previous terms of clearance
remain in effect.
Inventory as of this Action
Requested
Previously Approved
06/30/1993
06/30/1993
12/31/1992
4,443
0
4,443
404,850
0
404,850
0
0
0
THIS ICR INCLUDES THE GENERAL FACILITY
REQUIREMENTS FOR OWNERS/OPERATO OF TSDF'S WHICH INCLUDES
MAINTAINING RECORDS OF WASTES HANDLED, OPERATING METHODS, LOCATION,
DESIGN AND CONSTRUCTION OF FACILITIES, CONTINGENCY PLANS,
OPERATIONAL CONSIDERATIONS, AND FINANCIAL REQUIREMENTS.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.