Cost burden has
been set to zero because burden hours should not be included in the
cost burden calculation.
Inventory as of this Action
Requested
Previously Approved
06/30/1999
06/30/1999
06/30/1996
2
0
2
10,000
0
30,000
0
0
0
Utilities that proposed to build and
operate nuclear power plants are required to design, construct, and
maintain those power plants to withstand geologic hazards, such as
faulting, seismic hazards, and maximum credible earthquate, to
protect the health and safety of the public and the
environment.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.