Withdrawn by
agency in order to allow time to prepare detailed assessment of
size of regulated community as required by previous terms of
clearance. Concurrent with withdrawl, OMB is authorizing emergency
extension of existing approval for 3 months When the agency
resubmits this request it must include a notice in the Federal
Register notifying the public of the availability of additional
information and requesting public comment to OMB within 30
days.
Inventory as of this Action
Requested
Previously Approved
10/31/1996
07/31/1999
12/31/1996
236
0
236
104,504
0
0
0
0
0
Owners/operators of Natural Gas
Process Plants must notify EPA of Construction, modification,
startup, shutdowns, malfuncations, dates and, for compliance with
the SO2 standard, result of initial performance tests.
Owner/operators of Onshore Natural Gas Processing Plants that are
potential VOC emitters records must be kept of leaks from presure
relief devices, the date of leak detection, repair method used and
other pertinent details. For potential SO2 emitters records must be
kept of excess SO2 emissions. This information is necessary to
ensure that these standards are being met. Reports are
semi-annual.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.