This ICR is approved pursuant to 5 CFR 1320. However, upon renew al of this ICR EPA should consult with OMB regarding two issues. First, EPA should verify that labor rates used reflect both compe nsation-related benefits (such as paid leave, health insurance, e tc.), as well as overhead. Second, EPA should investigate whethe r requirements such as the reading of the regulation by existing sources needs to be accounted for annually.
Inventory as of this Action
Requested
Previously Approved
09/30/2002
09/30/2002
06/30/1999
44
0
41
1,760
0
2,185
14,000
0
630,000
The New Source Performance Standards (NSPS) for Metallic Mineral Processing Plants, subpart LL, were proposed on August 24, 1982, and promulgated on February 21, 1984. These standards apply to the following facilities in Metallic Mineral Processing Plants: Each crusher and screen in open-pit mines; each crusher, screen, bucket elevator, conveyor belt transfer point, thermal dryer, product packaging stations, storage bin, enclosed storage area, truck loading and unloading station at the mill or concentrator, commencing construction, modification, or reconstruction after the date of proposal.
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.