IEPS Programs Current and Planned Reporting Schedule

Att_IEPS Programs Current and Planned Reporting Schedule KV.xls

The International Education Program Service Program System of 14 foreign language programs

IEPS Programs Current and Planned Reporting Schedule

OMB: 1840-0759

Document [xlsx]
Download: xlsx | pdf
IEPS PROGRAMS CURRENT AND PLANNED REPORTING SCHEDULE












The following spreadsheet outlines IEPS program report due dates: both the current schedule of report due dates and any planned changes to the reporting schedule. The reports covered are the non-competitive continuation (NCC) reports, interim reports, and final reports. For the purposes of this spreadsheet, NCC reports are those submitted in the spring, which are then used to make NCC awards. Interim reports are those submitted in the fall or winter throughout the duration of the grant. Final reports are due within 90 days of the grant end date. The one program that does not follow this framework is FLAS, which has Academic Year interim (AY I) and final reports (AY F), and Summer interim (S I) and final (S F) reports.
Some projects have variance in the grant begin and end dates, and thus, the scheduled report due dates. Those used most frequently are listed separately in the event that future grants will follow approximately the same variations in begin, end, and report due dates.















CURRENT SCHEDULE PLANNED SCHEDULE
Program Grant Begin Date Grant End Date Report Due Date Fiscal Year NCC/ Interim/ Final Narrative/ Data/ Budget Report Due Date Fiscal Year NCC/ Interim/ Final Narrative/ Data/ Budget Comments
AORC 10/1 9/30 4/1 1 NCC N/D/B 4/1 1 NCC N/B
4/1 2 NCC N/D/B 11/30 1 I N/D/B
4/1 3 NCC N/D/B 4/1 2 NCC N/B
12/31 4 F N/D/B 11/30 2 I N/D/B




4/1 3 NCC N/B




12/31 4 F N/D/B

BIE 7/1 6/30 4/27 1 NCC N/D/B 4/30 1 NCC N/B
8/31 1 I N/D 8/31 1 I N/D/B
9/28 2 F N/D/B 9/30 2 F N/D/B

CIBE 10/1 9/30 3/3 1 NCC N/D/B 3/15 1 NCC N/B
12/31 1 I N/D/B 12/31 1 I N/D/B
3/3 2 NCC N/D/B 3/15 2 NCC N/B
12/31 2 I N/D/B 12/31 2 I N/D/B
3/3 3 NCC N/D/B 3/15 3 NCC N/B
12/31 3 I N/D/B 12/31 3 I N/D/B
3/3 4 NCC N/D/B 12/31 4 F N/D/B
12/31 4 F N/D/B




DDRA DIRECTOR 7/1 12/31 3/31 1 F D 3/31 1 F N/D
DDRA FELLOW varies varies set/entered by Project Directors 1 I N/D/B set/entered by Project Directors 1 I N/D/B The Project Director sets the due dates for the fellow reports in their entirety to be completed. For the purpose of this spreadsheet, the pre-fellowship report is listed as the interim report (to be completed prior to the trip), and the post-fellowship report is listed as the final report (to be completed upon return).
set/entered by Project Directors 1 F N/D/B set/entered by Project Directors 1 F N/D/B

FLAS DIRECTOR 8/15 8/14 11/17 1 AY I N/D/B 9/1 1 AY I N/D/B For FLAS, reports focus on the Summer (S) or the Academic Year (AY), and are either Interim (I) or Final (F).
6/1 1 AY F N/D/B 6/1 1 AY F N/B
6/1 1 S I N/D/B 6/1 1 S I N/D/B
9/30 1 S F N/D/B 9/1 1 S F N/B
9/30 2 AY I N/D/B 9/1 2 AY I N/D/B
6/1 2 AY F N/D/B 6/1 2 AY F N/B
6/1 2 S I N/D/B 6/1 2 S I N/D/B
9/1 2 S F N/D/B 9/1 2 S F N/B
9/1 3 AY I N/D/B 9/1 3 AY I N/D/B
6/1 3 AY F N/D/B 6/1 3 AY F N/B
6/1 3 S I N/D/B 6/1 3 S I N/D/B
9/1 3 S F N/D/B 9/1 3 SF N/B




9/1 4 AY I N/D/B




6/1 4 AY F N/B




6/1 4 S I N/D/B




9/1 4 S F N/B
FLAS FELLOW (Academic Yr) 9/1 6/1 6/1 1, 2, &/or 3 AY F N/D/B 6/1 1, 2, &/or 3 AY F N/D
FLAS FELLOW (Summer) 6/1 9/1 9/1 1, 2, &/or 3 S F N/D/B 9/1 1, 2, &/or 3 S F N/D

FRA DIRECTOR 7/1 12/31 3/31 1 F D 3/31 1 F N/D
FRA FELLOW varies varies set/entered by Project Directors: pre-fellowship 1 I N/D/B set/entered by Project Directors: pre-fellowship 1 I N/D/B The Project Director sets the due dates for the fellow reports in their entirety to be completed. For the purpose of this spreadsheet, the pre-fellowship report is listed as the interim report (to be completed prior to the trip), and the post-fellowship report is listed as the final report (to be completed upon return).
set/entered by Project Directors: post-fellowship 1 F N/D/B set/entered by Project Directors: post-fellowship 1 F N/D/B

GPA Annual (1 Year) DIRECTOR 4/1 8/31 11/30 1 F N/D/B completed prior to the trip 1 I D Please note that GPA Annual grants have some differences in begin and end dates, and thus report due dates. The most common timeframe is included on this chart. Also, for the planned schedule, the Project Directors will submit a pre-seminar report before the trip (included here as Interim), and a post-seminar report after returning from the trip (included here as Final).




11/30 1 F N/D/B
GPA Annual (1 Year) FELLOW 4/1 8/31 11/30 1 F N/D 11/1 1 F D












GPA Language #1 (3 Year) DIRECTOR 4/1 3/31 6/30 1 I N/D/B 2/28 1 NCC N/B The GPA language grants have some variance in begin and end dates, and thus the report due dates. The most common timeframes are included on this chart. The NCC reports are currently being collected only in hard copy, but this will change beginning in 2/2007, when the reports will be completed in the IEPS system.
6/30 2 I N/D/B 6/30 1 I N/D/B
6/30 3 F N/D/B 2/28 2 NCC N/B




6/30 2 I N/D/B




6/30 3 F N/D/B
GPA Language #2 (3 Year) DIRECTOR 6/1 5/31 8/31 1 I N/D/B 2/28 1 NCC N/B
8/31 2 I N/D/B 8/31 1 I N/D/B
8/31 3 F N/D/B 2/28 2 NCC N/B




8/31 2 I N/D/B




8/31 3 F N/D/B
GPA Language #3 (3 Year) DIRECTOR 8/1 7/31 10/31 1 I N/D/B 2/28 1 NCC N/B
10/31 2 I N/D/B 10/31 1 I N/D/B
10/31 3 F N/D/B 2/28 2 NCC N/B




10/31 2 I N/D/B




10/31 3 F N/D/B
GPA Language (3 Year) PARTICIPANT based on one of the three begin dates above based on one of the three end dates above set/entered by Project Directors 1, 2, or 3 F N/D due 30 days before institutional report 1, 2, or 3 F D

IIPP 10/1 9/30 9/30 1 I N/D/B 5/31 1 NCC N/B
9/30 2 I N/D/B 10/31 1 I N/D/B
9/30 3 I N/D/B 5/31 2 NCC N/B
9/30 4 I N/D/B 10/31 2 I N/D/B
12/29 5 F N/D/B 5/31 3 NCC N/B




10/31 3 I N/D/B




5/31 4 NCC N/B




10/31 4 I N/D/B




12/31 5 F N/D/B

IRS Varies--usually on or after 10/1 Varies 4/1 1 NCC N/B 4/1 1 NCC N/B IRS grants can be up to three years in length. * If a grant is longer than one year in length, grantees will submit an interim report two months after the anniversary of the grant start date. Since many grants begin on 10/1, the interim report due date provided here is 12/1. The final report is due on or after December 30.
4/1 2 NCC N/B 12/1* 1 I N/D/B
4/1 3 NCC N/B 4/1 2 NCC N/B
12/29 1 F N/D/B 12/1* 2 I N/D/B




4/1 3 NCC N/B




12/1* 3 I N/D/B




90 days after grant end date 4 F N/D/B

LRC 8/15 8/14 4/15 1 NCC N/D 4/15 1 NCC N/B
4/15 2 NCC N/D 10/15 1 I N/D/B
4/15 3 NCC N/D 4/15 2 NCC N/B
11/12 4 F N/D 10/15 2 I N/D/B




4/15 3 NCC N/B




10/15 3 I N/D/B




11/15 4 F N/D/B












NRC 8/15 8/14 4/1 1 NCC N/D 4/1 1 NCC N/B The course lists are collected in the interim (fall) report.
9/1 1 I D 10/15 1 I N/D/B
4/1 2 NCC N/D 4/1 2 NCC N/B
9/1 2 I D 10/15 2 I N/D/B
11/15 3 F N/D 4/1 3 NCC N/B




10/15 3 I N/D/B




11/15 4 F N/D/B

SA ADMINISTERING AGENCY 5/1 10/31 11/30 1 F N/D/B 11/30 1 F N/D/B
SA DOMESTIC INSTITUTION 5/1 10/31 11/30 1 F N/B 11/30 1 F N/D/B
SA PARTICIPANT 5/1 10/31 11/30 1 F N/D 11/30 1 F D

TICFIA 10/1 9/30 4/1 1 NCC N/B 4/1 1 NCC N/B
12/31 1 I N/D 12/31 1 I N/D/B
4/1 2 NCC N/B 4/1 2 NCC N/B
12/31 2 I N/D 12/31 2 I N/D/B
4/1 3 NCC N/B 4/1 3 NCC N/B
12/31 3 I N/D 12/31 3 I N/D/B
4/1 4 NCC N/B 12/31 4 F N/D/B
12/29 4 F N/D




UISFL (2 Year) 7/1 6/30 4/27 1 NCC N/D/B 4/30 1 NCC N/B
8/31 1 I D 8/31 1 I N/D/B
9/28 2 F N/D/B 9/30 2 F N/D/B
UISFL (3 Year) 7/1 6/30 4/27 1 NCC N/D/B 4/30 1 NCC N/B
8/31 1 I D 8/31 1 I N/D/B
4/27 2 NCC N/D/B 4/30 2 NCC N/D
8/31 2 I D 8/31 2 I N/D/B
9/28 3 F N/D/B 9/30 3 F N/D/B
File Typeapplication/vnd.ms-excel
Authorrebecca
Last Modified Byjoe.schubart
File Modified2006-09-11
File Created2005-11-01

© 2024 OMB.report | Privacy Policy