Annual Transmissiion Planning and Evaluation Report

Annual Transmission Planning and Evaluation Report

overview.htm

Annual Transmissiion Planning and Evaluation Report

OMB: 1902-0171

Document [html]
Download: html
FERC: eForms - Form 715 Overview
Text Size small medium large  

skip navigation
Decisions & Notices
Notice Formats
FERC Online
eRegistration
eFiling
eSubscription
eService
eLibrary
eForms
eTariff
Corporate Officials
Electric Quarterly Reports (EQR)
Hardcopy Filing & Forms
 
 


Documents & Filing

eForms
Form 715 - Annual Transmission Planning and Evaluation Report
Overview
    Each transmitting utility that operates integrated transmission system facilities that are rated at or above 100 kilovolts (kV), must annually submit this form to the Commission.

    Form 715 requires each Respondent to:
    • Identify a contact person for inquiries regarding information in the form [Form 715, Part 1];
    • Submit in electronic form its base case power flow data if it does not participate in the development and use of regional power flow data. A Respondent that participates in the development and use of regional power flow studies must either submit in electronic form the regional or subregional base case power flow data or designate any regional or subregional organization, or any other single entity to submit in electronic form the regional or subregional base case power flow data [Form 715, Part 2];
    • Submit transmission system maps and diagrams used by the Respondent for transmission planning [Form 715, Part 3];
    • Submit a detailed description of the transmission planning reliability criteria used to evaluate system performance for time frames and planning horizons used in regional and corporate planning [Form 715, Part 4];
    • Submit a detailed description of the Respondent's transmission planning assessment practices (including, but not limited to, how reliability criteria are applied and the steps taken in performing transmission planning studies) [Form 715, Part 5]; and
    • Submit a detailed evaluation of the Respondent's anticipated system performance as measured against its stated reliability criteria using its stated assessment practices [Form 715, Part 6]

    Respondents must submit to the Commission an original and two copies in hard copy of the above items 1 and 3 through 6 and in electronic form items 1, 2, 4, 5 and 6. A trial alternate filing method PDF which eliminates the need to file paper submissions may be used for the report year 2005 submissions.

    The Commission considers the information collected by this report to be Critical Energy Infrastructure Information (CEII) and will treat it as such. Please follow the instructions provided at http://www.ferc.gov/help/how-to/file-ceii.asp to request a copy of any Form 715 filed with the Commission.

    When Respondents have designated any single entity to submit regional or subregional data to the Commission, that entity must submit these data to the Commission in both hard copy and electronic form in both hard copy and electronic form, as indicated above.

  Downloads & Links

Form 715
 

  Contact Information

Casey Nutsch
Telephone: 202-502-8426

Patricia Morris
Telephone: 202-502-8730
Email: [email protected]

FERC Online Support
Telephone: 202-502-6652
Toll-free: 1-866-208-3676
Email: [email protected]

Submit data to:
Federal Energy Regulatory Commission
Form No. 715
Secretary of the Commission
888 First Street, N.E.
Washington, DC 20426
 



Updated: November 28, 2006

File Typetext/html
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy