2115ss02 (6-12-07)

2115ss02 (6-12-07).doc

NESHAP for Miscellaneous Coating Manufacturing (40 CFR part 63, subpart HHHHH) (Renewal)

OMB: 2060-0535

Document [doc]
Download: doc | pdf

14


OMB ROCIS TEMPLATE

SUPPORTING STATEMENT

ENVIRONMENTAL PROTECTION AGENCY


NESHAP for Miscellaneous Coating Manufacturing (40 CFR part 63, subpart HHHHH) (Renewal)


1. Identification of the Information Collection


1(a) Title of the Information Collection


NESHAP for Miscellaneous Coating Manufacturing (40 CFR part 63, subpart HHHHH) (Renewal)


1(b) Short Characterization/Abstract


Respondents are owners or operators of new and existing facilities that manufacture a miscellaneous coating and are located at, or are part of, major sources of hazardous air pollutant (HAP) emissions. “Major source” means that the process equipment used to manufacture the miscellaneous coatings and any other operations or equipment at the facility emit, or have the potential to emit, 10 tons per year or more of a single HAP or 25 tons per year or more of any combination of HAP. A facility is subject to the miscellaneous coating manufacturing National Emission Standards for Hazardous Air Pollutants (NESHAP) if it meets the following criteria:


1. It is used to manufacture coatings, including inks, paints, or adhesives described by Standard Industrial Classification (SIC) codes 285, or 289, or North American Industrial Classification System (NAICS) codes 3255, or 3259;

2. It processes, uses, or produces HAP;

3. It is not part of an affected source under another subpart of 40 CFR part 63.


An average of approximately 132 existing miscellaneous coating manufacturing respondents will be subject to the standard over the next three years. The number of respondents is expected to grow about two percent over the next three years (0.67% per year) which adds approximately one respondent per year to the inventory.


Owners, or operators of miscellaneous coating manufacturing facilities subject to the standard must choose one of the compliance options described in the standard, or install and monitor control systems that reduce HAP emissions to the allowable emission rate. Specifically, owners, or operators are required to install, operate, and maintain a continuous monitoring system (CMS) to demonstrate compliance with the emission limitations in Tables 1 through 3 and 5 through 6 in the standard and the operating limits in Table 7; and they also must record the values of equipment operating parameters as specified in Table 7. Owners, or operators are required to conduct equipment inspections and equipment leak monitoring to demonstrate compliance with the work practice standards in Tables 1 through 5.


Miscellaneous coating manufacturing facilities also are subject to the general provisions at 40 CFR part 63, subpart A which apply to all NESHAP subject facilities. These requirements include those associated with the applicability determinations; notifications that the facilities are subject to the rule; notifications of performance tests; notifications of compliance status, including the results of performance tests and design evaluations; and semiannual compliance reports. In addition to the requirements of subpart A, many respondents are required to submit a precompliance report and leak detection and repair (LDAR) reports; and existing facilities that wish to implement emissions averaging provisions must submit an emissions averaging plan.


All reports are to be submitted to the respondent’s state, or local agency, or to the EPA regional office, whichever has been delegated enforcement authority by EPA. The information is used to determine whether or not all sources subject to the rule are achieving the emission limitations and work practice standards in the rule.


If the owner, or operator identifies any deviation from an emission limitation, or work practice standard, a compliance report must be submitted that includes all records that the source is required to maintain that pertain to the periods during which such deviation occurred, as well as data regarding: the magnitude of each deviation; the reason for each deviation; a description of the corrective action taken for each deviation, including action taken to minimize each deviation and actions taken to prevent a recurrence; and a copy of all quality assurance activities performed on any monitoring protocol.


Owners, or operators of a miscellaneous coating manufacturing facility must maintain a copy of all monitored equipment operating parameter values that demonstrate compliance with the operating limits in the rule, as well as records of inspections and results of equipment leak monitoring that demonstrate compliance with the work practice standards in the rule. Owners, or operators also are required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of a source, or any period during which the monitoring system is inoperative. Those records must be maintained for a minimum of five years. At a minimum, the most recent two years of data must be retained onsite. The remaining three years of data may be retained offsite.


The previous Information Collection Request (ICR) incorrectly identifies “Federal Government” and “State, Local, or Tribal Government” as part of the “Affected Public.” The “Affected Public” is comprised entirely of “Business, or other for profit” entities as shown on the Office of Management and Budget (OMB) ROCIS Template.


OMB approved the currently active ICR without any ATerms of Clearance.”


2. Need for and Use of the Collection


2(a) Need/Authority for the Collection


The EPA is charged under section 112 of the Clean Air Act, as amended, to establish standards of performance for each category, or subcategory of major sources and area sources of hazardous air pollutants. These standards are applicable to new, or existing sources of hazardous air pollutants and shall require the maximum degree of emission reduction. In addition, section 114(a) states that the Administrator may require any owner/operator subject to any requirement of this Act to:


(A) Establish and maintain such records; (B) make such reports; (C) install, use, and maintain such monitoring equipment, and use such audit procedures, or methods; (D) sample such emissions (in accordance with such procedures or methods, at such locations, at such intervals, during such periods, and in such manner as the Administrator shall prescribe); (E) keep records on control equipment parameters, production variables, or other indirect data when direct monitoring of emissions is impractical; (F) submit compliance certifications in accordance with Section 114(a)(3); and (G) provide such other information as the Administrator may reasonably require.


In the Administrator's judgment, emissions from miscellaneous coating manufacturers cause, or contribute to air pollution that may reasonably be anticipated to endanger public health, or welfare. Therefore, the NESHAP was promulgated for this source category at 40 CFR part 63, subpart HHHHH.


2(b) Practical Utility/Users of the Data


The recordkeeping and reporting requirements in the standard ensure compliance with the applicable regulations which where promulgated in accordance with the Clean Air Act. The collected information also is used for targeting inspections and as evidence in legal proceedings.


Performance tests are required in order to determine an affected facility=s initial capability to comply with the emission requirements. Continuous emission monitors are used to ensure compliance at all times.


The notifications required in the standards are used to inform the Agency, or delegated authority when a source becomes subject to the requirements of the standard. The reviewing authority may then inspect the source to check if the pollution control devices are properly installed and operated and the standards are being met. The performance test also may be observed.


The required semiannual reports are used to determine periods of excess emissions, identify problems at the facility, verify operation/maintenance procedures and for compliance determinations.


3. Nonduplication, Consultations, and Other Collection Criteria


The requested recordkeeping and reporting are required under 40 CFR part 63, subpart HHHHH.


3(a) Nonduplication


If the subject standards have not been delegated, the information is sent directly to the appropriate EPA regional office. Otherwise, the information is sent directly to the delegated state, or local agency. If a state, or local agency has adopted its own similar standards to implement the Federal standards, a copy of the report submitted to the state, or local agency can be sent to the Administrator in lieu of the report required by the Federal standards. Therefore, no duplication exists.


3(b) Public Notice Required Prior to ICR Submission to OMB


An announcement of a public comment period for the renewal of this ICR was published in the Federal Register at 71 FR 35652 on June 21, 2006. No comments were received on the burden published in the Federal Register.


3(c) Consultations


An industry consultation was conducted with Caroline A. Wacker, (615) 778-5378, EHS Operations, 3M Company. The 3M Company has twenty (20) facilities that are considered affected sources under 40 CFR part 63, Subpart HHHHH. Based on the five facilities that are most affected by the standard, the 3M Company estimates that 200 hours per facility per year are spent complying with the O&M, ongoing recordkeeping and semiannual reporting provisions of the standard. This ICR indicates roughly 196 hours are spent for the same activities, so the information provided by the 3M Company confirms our burden hour estimates.


In addition, to an industry-based consultation, the Agency’s industry experts have been consulted and our internal data sources and the Agency’s projections for industry growth over the next three years considered. Our most relevant data source is the Air Facility System (AFS) which is operated and maintained by EPA's Office of Compliance. AFS is EPA’s database for the collection, maintenance, and retrieval of all compliance data. The growth rate for the industry is based on our consultations with the Agency’s internal industry experts. An annual average of approximately 133 respondents will be subject to the standard over the three year period covered by this ICR.


Industry trade associations and other interested parties were provided an opportunity to comment on the burden associated with the standard as it was being developed and the standard has been previously reviewed to determine the minimum information needed for compliance purposes.


It is our policy to carefully review any comments received since the last ICR renewal including those submitted in response to the first Federal Register Notice and respond appropriately. In this case, no comments were received.


3(d) Effects of Less Frequent Collection


Less frequent information collection would decrease the margin of assurance that facilities are continuing to meet the standards. Requirements for information gathering and recordkeeping are useful techniques to ensure that good operation and maintenance practices are applied and emission limitations are met. If the information required by these standards was collected less frequently, the proper operation and maintenance of control equipment and the possibility of detecting violations would be less likely.


3(e) General Guidelines


These reporting and recordkeeping requirements do not violate any of the regulations promulgated by OMB under 5 CFR part 1320, section 1320.5.


These standards require the respondents to maintain all records, including reports and notifications for at least five years. This is consistent with the General Provisions as applied to the standards. EPA believes that the five-year records retention requirement is consistent with the Part 70 permit program and the five year statute of limitations on which the permit program is based. The retention of records for five years allows EPA to establish the compliance history of a source, monitor any pattern of non-compliance, and determine the appropriate level of enforcement action. EPA has found that the most flagrant violators have violations extending beyond five years. In addition, EPA would be prevented from pursuing the violators due to the destruction or nonexistence of essential records.


3(f) Confidentiality


Any information submitted to the Agency for which a claim of confidentiality is made will be safeguarded according to the Agency policies set forth in Title 40, chapter 1, part 2, subpart B - Confidentiality of Business Information (see 40 CFR 2; 41 FR 36902, September 1, 1976; amended by 43 FR 40000, September 8, 1978; 43 FR 42251, September 20, 1978; 44 FR 17674, March 23, 1979).


3(g) Sensitive Questions


The reporting and recordkeeping requirements in the standard do not include sensitive questions.


4. The Respondents and the Information Requested


4(a) Respondents/SIC Codes


The respondents to the recordkeeping and reporting requirements are the owners, or operators of miscellaneous coating manufacturing facilities. The United States Standard Industrial Classification (SIC) codes for such facilities are 285 and 289, which correspond to the North American Industry Classification System (NAICS) codes 3255 and 3259.


4(b) Information Requested


(i) Data Items


In this ICR, all the data that are recorded or reported are required by the NESHAP for Miscellaneous Coating Manufacturing (40 CFR part 63, subpart HHHHH).


A source must make the following reports:


Notifications/Reports

Regulation References

Initial notifications (including construction/reconstruction)

63.5, 63.9(b), and 63.8070(a)-(c)

Notification of performance test, test plan, and emission profile

63.7(b)-(c), 63.9(e), and 63.8070(a),(d)

Notification of CMS performance evaluation

63.8(e)(2) and 63.9(g)

Notification of compliance status (including performance test results)

63.9(h), 63.10(d)(2), and 63.8070(e)

Notification of process change

63.8070(f)

Emissions averaging plan

63.1250-63.1260, 63.8060

Precompliance report

63.8075(c)

Semiannual compliance report

  • Startup, shutdown, and malfunction reports

  • Deviations/no deviations/out-of-control CMS

  • No out-of-control CMS

  • Heat exchange system reports (delay of repair)

  • Maintenance and inspection reports for storage tank control devices

  • Operating scenario reports

  • Equipment leak reports

  • Emissions averaging reports

63.10(e)(3) and 63.8075(b),(d)

63.10(d)(5) and 63.8075(d)(4)

63.8075(d)(5)

63.8(c)(7), 63.8075(d)(6)

63.104(e), (f)(2)(i)-(iv), 63.8075(d)(7)

63.1063(c)(2)(iv)(B) or (e)(2), 63.8075(d)(8)

63.8075(d)(9)

63.1039(b)(1)-(8) and 63.8075(d)(10)

63.1250-63.1260, 63.8060


A source must keep the following records:


Recordkeeping Requirements

Regulation Reference

Record retention

63.10(b)(1) and 63.8085

Documentation supporting initial notifications and notifications of compliance status

63.10(b)(2)(xiv) and 63.8080(a)(1)

Startup, shutdown, and malfunction plan

63.6(e)(3)

Records related to startup, shutdown, and malfunction

63.6(e)(3)(iii)-(iv) and 63.8080(a)(2)

Records of performance tests and CMS performance evaluations

63.10(b)(2)(viii) and 63.8080(a)(3)

Records for equipment leaks

63.1038(b)-(c) and 63.8080(a)(4)

Daily schedule or log of each operating scenario

63.8080(a)(5)

Records for process vessels complying with percent reduction emission limitation

63.8080(a)(6)

Planned routine maintenance records for storage tank control devices

63.8080(a)(7)

Maintenance wastewater plan

63.8080(a)(8)

Records for safety device openings

63.8080(a)(9)

Results of each CMS calibration, validation check, and inspection

63.8035(c)(6)-(8), (d)(4)-(5), (e)(4)-(7), (f)(3)-(4), 63.8080(a)(10)

Records for emissions averaging

63.1250-63.1260, 63.8060

Records for each CMS

3.8(d)(3), 63.8(f)(6)(i), 63.10(b)(2)(vi)-(xi), and 63.8080(b)


Electronic Reporting


Also, regulatory agencies, in cooperation with the respondents, continue to create reporting systems to transmit data electronically. However, electronic reporting systems are still not widely used. At this time, it is estimated that approximately 20 percent of the respondents use electronic reporting.


(ii) Respondent Activities


Respondent Activities

Read instructions.

Install, calibrate, maintain, and operate opacity and/or parameter monitors

Perform initial performance test and repeat performance tests if necessary

Write the notifications and reports listed above

Enter information required to be recorded above

Submit the required reports developing, acquiring, installing, and utilizing technology and systems for the purpose of collecting, validating, and verifying information

Develop, acquire, install, and utilize technology and systems for the purpose of processing and maintaining information

Develop, acquire, install, and utilize technology and systems for the purpose of disclosing and providing information

Train personnel to be able to respond to a collection of information

Transmit, or otherwise disclose the information


5. The Information Collected: Agency Activities, Collection Methodology, and Information Management


5(a) Agency Activities


EPA conducts the following activities in connection with the acquisition, analysis, storage, and distribution of the required information.


Agency Activities

Review notifications and reports, including performance test reports, and excess emissions reports, required to be submitted by industry.

Audit facility records.

Input, analyze, and maintain data in the Air Facility System (AFS).


5(b) Collection Methodology and Management


Following the notification of startup, the reviewing authority may inspect the affected facility to determine whether the pollution control devices are properly installed and operated. Performance test reports are used by the Agency to discern a source’s initial capability to comply with the emission standard. Data and records maintained by the respondents are tabulated and published for use in compliance and enforcement programs. Immediate startup, shutdown and malfunction notifications and reports alert the Agency to atypical operations conditions which result in violations of the emission limitations. Semiannual reports are used for problem identification, as a check on source operation and maintenance, and for compliance determinations.


Information contained in the reports is entered into the Air Facility System (AFS), which is operated and maintained by EPA's Office of Compliance. AFS is EPA’s database for the collection, maintenance, and retrieval of compliance data for approximately 125,000 industrial and government-owned facilities. EPA uses the AFS for tracking air pollution compliance and enforcement by local and state regulatory agencies, EPA regional offices and EPA headquarters. EPA and its delegated Authorities can edit, store, retrieve and analyze the data.


The records required by this regulation must be retained by the owner/operator for five years.


5(c) Small Entity Flexibility


There are few, if any, small entities (i.e., small businesses) affected by this regulation. However, any impact on small entities was taken into consideration during the development of the standard. Generally, only major sources of pollution are regulated under the standard.


5(d) Collection Schedule


The specific frequency for each information collection activity within this request is shown in Table 1: Annual Respondent Burden and Cost: NESHAP for Miscellaneous Coating Manufacturing (40 CFR part 63, subpart HHHHH).


6. Estimating the Burden and Cost of the Collection


Table 1 documents the computation of individual burdens for the recordkeeping and reporting requirements applicable to the respondents. The individual burdens are expressed under standardized headings believed to be consistent with the concept of burden under the Paperwork Reduction Act. Where appropriate, specific tasks and major assumptions have been identified. Responses to this information collection are mandatory.


6(a) Estimating Respondent Burden


Table 1 documents the computation of individual burdens for the recordkeeping and reporting requirements applicable to the respondents. The individual burdens are expressed under standardized headings believed to be consistent with the concept of burden under the Paperwork Reduction Act. Where appropriate, specific tasks and major assumptions have been identified.


6(b) Estimating Respondent Costs


(i) Estimating Labor Costs

This ICR uses the following labor rates:


Managerial $100.99 ($48.09 + 110%)

Technical $87.97 ($41.89 + 110%)

Clerical $43.81 ($20.86 + 110%)


These rates are from the United States Department of Labor, Bureau of Labor Statistics, December, 2005, ATable 2. Civilian Workers, by occupational and industry group.@ The rates are from column 1, ATotal compensation.@ The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.


(ii) Estimating Capital/Startup and Operation and Maintenance Costs


The types of industry costs associated with the information collection activities in the standard are both labor costs, which are addressed elsewhere in this ICR, and the costs associated with continuous monitoring. The capital/startup costs are one-time costs that occur when a facility becomes subject to the regulation. The annual operation and maintenance costs are the ongoing costs to maintain the monitors and include other costs, such as photocopying and postage.

(iii) Capital/Startup vs. Operation and Maintenance (O&M) Costs


Capital/Startup vs. Operation and Maintenance (O&M) Costs

(A)

Continuous Monitoring

(B)

Capital/Startup Cost

(C)

Number of New Respondents

(D)

Total Capital/Startup Cost

(B X C)

(E)

Annual O&M Costs for One Respondent

(F)

Number of Respondents with O&M

(G)

Total O&M,

(E X F)

Process Vessels

$30,000

1

$30,000

$16,000

132

$2,112,000

Transfer Operations

N/A

N/A

N/A

$3,100

132

$409,200

Wastewater Systems

N/A

N/A

N/A

$2,000

132

$264,000

Totals

$30,000





$2,785,200

The total capital/startup costs for this ICR are $30,000. This is the total of column D in the above table. The total operation and maintenance (O&M) costs for this ICR are $2,785,200. This is the total of column G.


The average annual cost for capital/startup and operation and maintenance costs to industry over the next three years of the ICR is estimated to be $2,815,000 per year.


6(c) Estimating Agency Burden and Cost


The only costs to the Agency are those costs associated with analysis of the reported information. EPA's overall compliance and enforcement program includes activities such as the examination of records maintained by the respondents, periodic inspection of sources of emissions, and the publication and distribution of collected information.


The average annual Agency cost during the three years of the ICR is estimated to be $41,417.


This cost is based on the average hourly labor rate as follows:


Managerial $57.20 (GS-13, Step 5, $35.75 x 1.6)

Technical $42.45 (GS-12, Step 1, $26.53 x 1.6)

Clerical $22.96 (GS-6, Step 3, $14.35 x 1.6)


These rates are from the Office of Personnel Management (OPM) A2006 General Schedule@ which excludes locality rates of pay. Details upon which this estimate is based appear in Table 2: Annual Agency Burden and Cost: NESHAP for Miscellaneous Coating Manufacturing (40 CFR part 63, subpart HHHHH), below.


6(d) Estimating the Respondent Universe and Total Burden and Costs


Based on our research for this ICR, on average over the next three years, approximately 9 of the 132 existing respondents will be subject to the standard. It is estimated that one additional respondent per year will become subject over the three-year period covered by this ICR.


The number of respondents is calculated using the following table that addresses the three years covered by this ICR.


Number of Respondents


Respondents That Submit Reports

Respondents That Do Not Submit Any Reports


Year

(A)

Number of New Respondents 1

(B)

Number of Existing Respondents

(C)

Number of Existing Respondents That Keep Records But Do Not Submit Reports

(D)

Number of Existing Respondents That Are Also New Respondents

(E)

Number of Respondents

(E=A+B+C-D)

1

1

131

0

0

132

2

1

132

0

0

133

3

1

133

0

0

134

Average

1

133

0

0

133

1 New respondents include sources with constructed, reconstructed and modified affected facilities.


Column D is subtracted to avoid double-counting respondents. As shown above, the average Number of Respondents over the three year period of this ICR is 133.


The total number of annual responses per year is calculated using the following table:

Total Annual Responses

(A)

Information Collection Activity

(B)

Number of Respondents

(C)

Number of Responses

(D)

Number of Existing Respondents That Keep Records But Do Not Submit Reports

(E)

Total Annual Responses

E=(BxC)+D

Notification of construction/reconstruction

1

1

N/A

1

Notification of anticipated startup

1

1

N/A

1

Notification of actual startup

1

1

N/A

1

Notification of applicability of standard

1

1

N/A

1

Emission averaging plan

1

0

N/A

0

Precompliance report

1

1

N/A

1

Notification of initial performance test

1

0

N/A

0

Notification of initial CMS performance evaluation

1

0

N/A

0

Notification of compliance status

1

1

N/A

1

Notification of process change

13

1

N/A

13

Semiannual report

132

2

N/A

264

Startup, shutdown, malfunction report

7

1

N/A

7

LDAR report

132

2

N/A

264

Emission averaging report

13

1

N/A

13




Total

567


The number of Total Annual Responses is 567.


6(e) Bottom Line Burden Hours Burden Hours and Cost Tables


The detailed bottom line burden hours and cost calculations for the respondents and the Agency are shown in Tables 1 and 2, respectively, and summarized below.


(i) Respondent Tally


The annual labor hours are 167,832 per year over the three years of this ICR. The total annual labor costs are $14,192,714. The annual public reporting and recordkeeping burden for this collection of information is estimated to average 296 hours per response. Details regarding these estimates may be found in Table 1. Annual Respondent Burden and Cost: NESHAP for Miscellaneous Coating Manufacturing (40 CFR part 63, subpart HHHHH).


The total annual capital/startup and O&M costs to the regulated entity are $2,815,200. The cost calculations are detailed in Section 6(b)(iii), Capital/Startup vs. Operation and Maintenance (O&M) Costs.


(ii) The Agency Tally


The average annual Agency burden and cost over next three years is estimated to be 1,001 labor hours at a cost of $41,417. See Table 2. Annual Agency Burden and Cost: NESHAP for Miscellaneous Coating Manufacturing (40 CFR part 63, subpart HHHHH).


6(f) Reasons for Change in Burden


The increase in burden from the most recently approved ICR is due to adjustments. The adjustments result from the transition by the respondents from initial compliance with the standard to continuing compliance with the standard plus the addition three new respondents to the burden total due to industry growth.


The respondents achieved compliance over the past three years by modifying manufacturing processes as necessary. This was a phased-in process with all of the respondents required to demonstrate compliance within three years of promulgation of the standard. The cost per year is lower during the transition phase than at full compliance. Compliance was demonstrated by conducting performance tests, providing engineering calculations and utilizing pollution/parameter monitors.


After achieving compliance, performance tests are not required and capital/startup costs are lower because pollution monitors are a one-time, initial expense. However, the cost to maintain the monitors increases and since all the respondents are required to conduct compliance evaluations, the overall costs are higher. Hence, the capital startup and O&M costs are higher.


The labor hours and cost are also higher because the pollution levels must be recorded and compliance reports sent to the appropriate regulatory authority. In addition, the labor rates have increased over the past three years, which increase the labor hour dollar-cost.


6(g) Burden Statement


The annual public reporting and recordkeeping burden for this collection of information is estimated to average 296 hours per response. Burden means the total time, effort, and financial resources expended by persons to generate, maintain, retain, or disclose, or provide information to, or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit, or otherwise disclose the information.


An agency may not conduct, or sponsor, and a person is not required to respond to, a collection of information unless it displays a valid OMB Control Number. The OMB Control Numbers for EPA’s regulations are listed at 40 CFR part 9 and 48 CFR chapter 15.


To comment on the Agency's need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including the use of automated collection techniques, EPA has established a public docket for this ICR under Docket ID Number EPA-HQ-OECA-2006-0418. An electronic version of the public docket is available at http://www.regulations.gov/ which may be used to obtain a copy of the draft collection of information, submit or view public comments, access the index listing of the contents of the docket, and to access those documents in the public docket that are available electronically. When in the system, select “search,” then key in the docket ID number identified in this document. The documents also are available for public viewing at the Enforcement and Compliance Docket and Information Center in the EPA Docket Center (EPA/DC), EPA West, Room 3334, 1301 Constitution Avenue NW, Washington, DC. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Reading Room is (202) 566-1744, and the telephone number for the docket center is (202) 566-1752. Also, comments may be sent to the Office of Information and Regulatory Affairs, Office of Management and Budget, 725 17th Street, NW, Washington, DC 20503, Attention: Desk Officer for EPA. Please include the EPA Docket ID Number EPA-HQ-OECA-2006-0418 and OMB Control Number 2060-0535 in any correspondence.


Part B of the Supporting Statement


This part is not applicable because no statistical methods were used in collecting this information.























Table 1. Annual Respondent Burden and Cost - NESHAP for Miscellaneous Coating Manufacturing (40 CFR Part 63, Subpart HHHHH)

















A

B

C

D

E

F

G

H

I




Burden hours per occurrence

Number of occurrences per year

Technical hours per respondent per year

Respondents per yeara

Technical hours per respondent

Management hours per year

Clerical hours per year

Respondent hours per year

Labor Cost, $



Burden item



























(C = A * B)


(E = C * D)

(F = E * 0.05)

(G = E * 0.1)

(H = E + F + G)

1

Applications

N/A









2

Surveys and Studies

N/A









3

Reporting Requirements











A.

Read Instructionsc

1.0

1.0

1.0

1

1.0

0.1

0.1

1.2

97


B.

Required Activities












Initial CMS performance evaluationd

10.0

1.0

10.0

0

0.0

0.0

0.0

0.0

0



Create Information

Included in item 4










Gather Existing Information

Included in item 4









C.

Write Reports












Notification of construction/reconstruction

2.0

1.0

2.0

1

2.0

0.1

0.2

2.3

195



Notification of anticipated startup

2.0

1.0

2.0

1

2.0

0.1

0.2

2.3

195



Notification of actual startup

2.0

1.0

2.0

1

2.0

0.1

0.2

2.3

195



Notification of applicability of standard











1. Existing sources

2.0

0.0

0.0

0

0.0

0.0

0.0

0.0

0



2. New sources

2.0

1.0

2.0

1

2.0

0.1

0.2

2.3

195



Emissions averaging plane

40.0

1.0

40.0

0

0.0

0.0

0.0

0.0

0



Precompliance reportf

40.0

1.0

40.0

1

40.0

2.0

4.0

46.0

3,896



Notification of initial performance testg

2.0

1.0

2.0

0

0.0

0.0

0.0

0.0

0



Notification of initial CMS performance evaluationd

2.0

1.0

2.0

0

0.0

0.0

0.0

0.0

0



Notification of compliance status











1. With performance testg

80.0

1.0

80.0

0

0.0

0.0

0.0

0.0

0



2. Without performance testg

120.0

1.0

120.0

1

120.0

6.0

12.0

138.0

11,688



Notification of process changeh

8.0

1.0

8.0

13

104.0

5.2

10.4

119.6

10,130



Semiannual compliance report












1. No Deviationsi

8.0

1.0

8.0

119

952.0

47.6

95.2

1,094.8

92,725



2. Deviationsi

24.0

1.0

24.0

13

312.0

15.6

31.2

358.8

30,389



Startup, shutdown and malfunction reportj

8.0

1.0

8.0

7

56.0

2.8

5.6

64.4

5,454



LDAR reportk

125.0

2.0

250.0

132

33,000.0

1,650.0

3,300.0

37,950.0

3,214,217



Emission averaging reportl

20.0

1.0

20.0

13

260.0

13.0

26.0

299.0

25,324

4

Recordkeeping Requirements











A.

Read Instructions

Included in 3A









B.

Plan Activities

N/A










C.

Implement Activities

N/A










D.

Develop Record Systemm

40.0

1.0

40.0

1

40.0

2.0

4.0

46.0

3,896


E.

Develop Startup, Shutdown, Malfunction Plann

100.0

1.0

100.0

1

100.0

5.0

10.0

115.0

9,740


F.

Develop QA/QC Plan for CMSo

40.0

1.0

40.0

0

0.0

0.0

0.0

0.0

0


G.

Time for Audits

N/A










H.

Time to Enter Information












1. Records of startup, shutdown and malfunction

1.5

1.0

1.5

132

198.0

9.9

19.8

227.7

19,285



2. Records of CMS data












a. Record Continuously monitored parameters

1.0

365.0

365.0

132

48,180.0

2,409.0

4,818.0

55,407.0

4,692,756



b. Compile data

24.0

2.0

48.0

132

6,336.0

316.8

633.6

7,286.4

617,130



c. Information for semiannual reports

16.0

2.0

32.0

132

4,224.0

211.2

422.4

4,857.6

411,420



d. LDAR recordkeeping

Included in 3C









I.

Calibration of CMS

376.0

1.0

376.0

132

49,632.0

2,481.6

4,963.2

57,076.8

4,834,182


J.

Personnel Trainingp

40.0

1.0

40.0

1

40.0

2.0

4.0

46.0

3,896


K.

Refresher Coursep

16.0

1.0

16.0

132

2,112.0

105.6

211.2

2,428.8

205,710


L

Time for Audits

N/A




0.0

0.0

0.0

0.0

0

Totals





145,715

7,286

14,572

167,572

$14,192,714













a

132 existing major source facilities subject to the NESHAP. Assuming 2 percent growth over 3 years, 1 new facility will be built each year.


b

Labor cost assumes a rate of $87.97/hour for technical labor, $100.99/hour for management labor, and $43.81/hour for clerical labor.


c

This will occur only in the first year after a facility becomes subject to the rule.






d

Assumes 10 hours to conduct a CMS performace evaluation and 2 hours to prepare a notification.





e

Assumes that all existing facilities have complied with the emissions averaging requirements; new facilities are not allowed to use emissions averaging.

f

Assumes 50 percent of the new facilities will submit a precompliance report [50% x 1= 1 (rounded)].





g

Assumes all facilities will comply by submitting engineering calculations, design calculations, etc. with no performance tests.



h

Assumes 10 percent of the facilities will implement process changes [(10% x 132= 13 (rounded)].





i

Assumes 90 percent of facilities will have no deviations, and 10 percent will have deviations [90% x 132=119 (rounded), 10% x 132 = 13 (rounded)].

j

Assumes 5% of all facilities will report actions taken during a startup, shutdown, or malfunction is not consistent with the plan [5% x 132 = 7 (rounded)}.

k

Assumes all facilities will be subject to the equipment leak standards with an average of 125 hours per report.



l

Assumes that 10 percent of existing facilities will use with the emissions averaging reports to comply [10% x 132 = 13 (rounded)].


m

Assumes 40 hours to develop a record system for recording parameter monitoring information.




n

Assumes 80 hours to draft the startup, shutdown, and malfunction plan and another 20 hours of review/revisions, for a total of 100 hours.


o

Assumes 40 hours to develop/review the QA/QC plan for the CMS. No QA/QC plan is required for the parameter monitoring systems included in the rule.


Assumes no facilities will use the alternative standard, which requires CEMS and QA/QC plans.





p

Assumes 40 hours to train personnel and 16 hours for an annual refresher course.





















Table 2: Agency Burden and Cost - NESHAP for Miscellaneous Coating Manufacturing (40 CFR Part 63, Subpart HHHHH)













Activity

A

B

C

D

E

F

G


Agency hours per occurrence

Occurances per yeara

Technical hours per year

Management hours per year

Clerical hours per year

Total hours per year

Labor Costb, $



 

(C = A * B)

(D = C * 0.05)

(E = C * 0.1)

(F = C + D + E)

 


 

Notifications/Reports

 

 

 

 

 

 

 


A.

 

Performance Testc

8

0

0

0

0

0

0


B.

Repeat Performance Testd

8

0

0

0

0

0

0


C.

CMS Performance Evaluatione

4

0

0

0

0

0

0


D.

Review Notification of Construction/Reconstruction

2

1

2

0.1

0.2

2.3

95


E.

 

Review Notification of Anticipated Startup

2

1

2

0.1

0.2

2.3

95


F.

 

Review Notification of Actual Startup

2

1

2

0.1

0.2

2.3

95


G.

 

Review Notification of Applicability of Standard

2

1

2

0.1

0.2

2.3

95


H.

 

Review Emissions Averaging Planf

12

13

156

7.8

15.6

179.4

7,427


I.

 

Review Precompliance Reportg

4

1

4

0.2

0.4

4.6

190


J.

 

Review Notification of Initial Performance Test

2

0

0

0

0

0

0


K.

 

Review Notification of Initial CMS Performance Evaluatione

2

0

0

0

0

0

0


L.

 

Review Notification of Compliance Status

 

 

 

 

 

 

 


 

 

1. With performance testh

4

0

0

0

0

0

0


 

 

2. Without performance testi

4

1

4

0.2

0.4

4.6

190


M.

 

Review Notification of Process Changej

6

13

78

3.9

7.8

89.7

3,713


N.

 

Review Semiannual Compliance Report

 

 

 

 

 

 

 


O.

 

No deviationsk

2

119

238

11.9

23.8

273.7

11,330


P.

 

Deviationsk

4

13

52

2.6

5.2

59.8

2,476


Q.

 

Startup, shutdown, and malfunction reportl

2

7

14

0.7

1.4

16.1

666


R.

 

LDAR reportm

2

132

264

13.2

26.4

303.6

12,568


S.

 

Emissions averaging reportf

4

13

52

2.6

5.2

59.8

2,476


Totals

870

44

87

1,001

$41,417













a

132 existing major source facilities subject to the NESHAP. Assuming 2 percent growth over 3 years, 1 new facility will be built each year.


b

Labor cost assumes a rate of $42.45/hour for technical labor, $57.20/hour for management labor, and $22.96/hour for clerical labor.


c

Assumes no initial performance tests because all facilities will comply by submitting engineering calculations.



d

Assumes no repeat performance tests.








e

Assumes no performance evaluations are required for the parameter monitoring systems included in the rule.



f

Assumes that 10 percent of existing facilities will use with the emissions averaging reports to comply [10% x 132 = 13 (rounded)].


g

Assumes 50 percent of the new facilities will submit a precompliance report [50% x 1= 1 (rounded)].




h

Assumes one new facility will conduct initial performance tests.






i

Assumes all existing facilities have complied by submitting engineering calculations.





j

Assumes 10 percent of the facilities will implement process changes [(10% x 132= 13 (rounded)].




k

Assumes 90 percent of facilities will have no deviations, and 10 percent will have deviations [90% x 132=119 (rounded), 10% x 132 = 13 (rounded)].

l

Assumes 5% of all facilities will report actions taken during a startup, shutdown, or malfunction is not consistent with the plan [5% x 132 = 7 (rounded)}.

m

Assumes all facilities will report the specified information for processes subject to the equipment leak standards.















File Typeapplication/msword
File TitleICR Package Instructions
Authorrmarshal
Last Modified ByEPA
File Modified2007-06-12
File Created2007-06-12

© 2024 OMB.report | Privacy Policy