NESHAP for Magnetic Tape Manufacturing Operations (40 CFR part 63, subpart EE) (Renewal)

ICR 200704-2060-010

OMB: 2060-0326

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2007-05-30
IC Document Collections
ICR Details
2060-0326 200704-2060-010
Historical Active 200311-2060-001
EPA/OAR 1678.06
NESHAP for Magnetic Tape Manufacturing Operations (40 CFR part 63, subpart EE) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved with change 06/07/2007
Retrieve Notice of Action (NOA) 04/10/2007
The cost of labor assumptions underlying the respondent and agency burden cost calculations should be updated in the next renewal.
  Inventory as of this Action Requested Previously Approved
06/30/2010 36 Months From Approved 06/30/2007
17 0 17
3,395 0 3,395
47,000 0 47,000

Owners or operators of magnetic tape manufacturing operations must make the following one-time-only reports: notification of the date of construction or reconstruction; notification of the anticipated and actual dates of startup; notification of any physical, or operational change to an existing facility which may increase the regulated pollutant emission rate; notification of the date of the initial performance test; and the results of the initial performance test. Owners, or operators also are required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility. Each owner, or operator of an affected magnetic tape coating operation shall install, calibrate, maintain, and operate a monitoring device that continuously measures control device efficiency. Recordkeeping requirements include records of the freeboard ratio, compliance monitoring system (CMS) maintenance and calibration, performance tests, material balance calculation, and hazardous air pollutant (HAP) usage.

None
None

Not associated with rulemaking

  71 FR 58853 10/05/2006
72 FR 17895 04/10/2007
No

1
IC Title Form No. Form Name
NESHAP for Magnetic Tape Manufacturing Operations (40 CFR part 63 subpart EE) (Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 17 17 0 0 0 0
Annual Time Burden (Hours) 3,395 3,395 0 0 0 0
Annual Cost Burden (Dollars) 47,000 47,000 0 0 0 0
No
No

$1,817
No
No
Uncollected
Uncollected
Uncollected
Uncollected
Leonard Lazarus 202 564-6369 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
04/10/2007


© 2024 OMB.report | Privacy Policy