NESHAP for Plywood and Composite Wood Products (40 CFR 63, subpart DDDD) (Renewal)

ICR 200707-2060-007

OMB: 2060-0552

Federal Form Document

Forms and Documents
ICR Details
2060-0552 200707-2060-007
Historical Active 200403-2060-002
EPA/OAR 1984.03
NESHAP for Plywood and Composite Wood Products (40 CFR 63, subpart DDDD) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved with change 10/15/2007
Retrieve Notice of Action (NOA) 07/24/2007
  Inventory as of this Action Requested Previously Approved
10/31/2010 36 Months From Approved 10/31/2007
569 0 197
12,732 0 4,692
23,202 0 36,000

This regulation covers new and existing plywood and composite wood products (PCWP) facilities. Plywood and/or composite products are manufactured by bonding wood material (fibers, particles, strands, veneers, etc.), or agricultural fiber with resin, generally under heat and pressure, to form a structural panel, or engineered wood product. Plywood and composite products include, but are not limited to, plywood, veneer, particleboard, oriented strand board, hardboard, fiberboard, medium density fiberboard, laminated strand lumber, laminated veneer lumber, wood I-joists, kiln-dried lumber and glue-laminated beams. Owners/operators of plywood and composite products facilities are required to submit initial notification, performance tests, and compliance status reports. Respondents also are required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Semiannual reports also are required. These notifications, reports, and records are essential in determining compliance and are required, in general, of all sources subject to NESHAP.

None
None

Not associated with rulemaking

  71 FR 58853 10/05/2006
71 FR 40293 07/24/2007
No

1
IC Title Form No. Form Name
NESHAP for Plywood and Composite Wood Products (40 CFR Part 63, Subpart DDDD and 429)(Final Rule)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 569 197 0 0 372 0
Annual Time Burden (Hours) 12,732 4,692 0 0 8,040 0
Annual Cost Burden (Dollars) 23,202 36,000 0 0 -12,798 0
No
No

$96,249
No
No
Uncollected
Uncollected
Uncollected
Uncollected
Learia Williams 202 564-4113 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
07/24/2007


© 2024 OMB.report | Privacy Policy