Information Collection Request

30 CFR 780 - Surface Mining Permit Applications - Minimum Requirement for Reclamation and Operation Plan

ICR 200708-1029-002 · OMB 1029-0036 · Historical Inactive

Forms and Documents
DocumentTypeStatusAvailability
Section 522.doc Supplementary Document Uploaded 2007-08-09 Available
Section 517.doc Supplementary Document Uploaded 2007-08-09 Repair queued
Section 515.doc Supplementary Document Uploaded 2007-08-09 Repair queued
Section 508.doc Supplementary Document Uploaded 2007-08-09 Available
Section 507.doc Supplementary Document Uploaded 2007-08-09 Available
Part 780.doc Supplementary Document Uploaded 2007-08-09 Available
780ss.SBZ rule.8-9-07.doc Supporting Statement A Uploaded 2007-08-09 Available
IC Document Collections
IC IDCollectionTypeStatusForm
181519 780.38 - Support facilities - SRAs New
181518 780.38 - Support facilities - Industry New
181517 780.37 - Road systems - SRAs New
181516 780.37 - Road systems - Industry New
181515 780.35 - Disposal of excess spoil - SRAs New
181514 780.35 - Disposal of excess spoil - Industry New
181513 780.33 - Relocation or use of public roads - SRAs New
181512 780.33 - Relocation or use of public roads - Industry New
181511 780.31 - Protection of publicly owned parks and historic places - SRAs New
181510 780.31 - Protection of publicly owned parks and historic places - Industry New
181509 780.29 - Diversions - SRAs New
181508 780.29 - Diversions - Industry New
181507 780.28 - Activities in or adjacent to waters of the United States - SRAs New
181506 780.28 - Activities in or adjacent to waters of the United States - Industry New
181504 780.27 - Reclamation plan: Surface mining near underground mining - SRAs New
181503 780.27 - Reclamation plan: Surface mining near underground mining - Industry New
181502 780.25 - Reclamation plan: Siltation structures, impoundments, banks, dams, and embankments - SRAs New
181501 780.25 - Reclamation plan: Siltation structures, impoundments, banks, dams, and embankments - Industry New
181500 780.23 - Reclamation plan: Land use information - SRAs New
181499 780.23 - Reclamation plan: Land use information - Industry New
181498 780.22 - Geologic information - SRAs New
181497 780.22 - Geologic information - Industry New
181495 780.21 - Hydrology information - SRAs New
181494 780.21 - Hydrology information - Industry New
181493 780.18 - Reclamation plan: General requirements - SRAs New
181492 780.18 - Reclamation plan: General requirements - Industry New
181491 780.16 - Fish and wildlife information - SRAs New
181490 780.16 - Fish and wildlife information - Industry New
181489 780.14 - Operation plan: Maps and plans - SRAs New
181488 780.14 - Operation plan: Maps and plans - Industry New
181487 780.13 - Operation plan: Blasting - SRAs New
181486 780.13 - Operation plan: Blasting - Industry New
181485 780.12 - Operation plan: Existing structures - SRAs New
181484 780.12 - Operation plan: Existing structures - Industry New
181483 780.11 - Operation plan: General requirements - SRAs New
11283 780.11 - Operation plan: General requirements - Industry Modified
ICR Details
1029-0036 200708-1029-002
Historical Inactive 200510-1029-004
DOI/OSMRE 30 CFR 780 - revision
30 CFR 780 - Surface Mining Permit Applications - Minimum Requirement for Reclamation and Operation Plan
Revision of a currently approved collection   No
Regular
Comment filed on proposed rule and continue 11/30/2007
Retrieve Notice of Action (NOA) 08/25/2007
OMB files this comment in accordance with 5 CFR 1320.11( c ). This OMB action is not an approval to conduct or sponsor an information collection under the Paperwork Reduction Act of 1995. This action has no effect on any current approvals. If OMB has assigned this ICR a new OMB Control Number, the OMB Control Number will not apfear in the active inventory. For future submissions of this information collection, reference the OMB Control Number provided. In accordance with 5 CFR 1320, the information collection is withholding approval at this time. Prior to publication of the final rule, the agency should provide a summary of any comments related to the information collection and their response, including any changes made to the ICR as a result of comments.
  Inventory as of this Action Requested Previously Approved
11/30/2008 36 Months From Approved 03/31/2009
505 0 505
235,128 0 235,128
2,258,000 0 2,258,000

Permit application requirements in Section 507 and 508(g) of PL 95-87 require the applicant to submit the operations and reclamation plans for coal mining activities.

PL: Pub.L. 95 - 87 507 and 508 Name of Law: The Surface Mining Control and Reclamation Act of 1977
  
None

1029-AC04 Proposed rulemaking 72 FR 48890 08/24/2007

No

36
IC Title Form No. Form Name
780.31 - Protection of publicly owned parks and historic places - SRAs
780.12 - Operation plan: Existing structures - Industry
780.23 - Reclamation plan: Land use information - SRAs
780.27 - Reclamation plan: Surface mining near underground mining - Industry
780.11 - Operation plan: General requirements - SRAs
780.13 - Operation plan: Blasting - SRAs
780.28 - Activities in or adjacent to waters of the United States - SRAs
780.21 - Hydrology information - Industry
780.31 - Protection of publicly owned parks and historic places - Industry
780.37 - Road systems - SRAs
780.38 - Support facilities - Industry
780.23 - Reclamation plan: Land use information - Industry
780.13 - Operation plan: Blasting - Industry
780.12 - Operation plan: Existing structures - SRAs
780.18 - Reclamation plan: General requirements - Industry
780.18 - Reclamation plan: General requirements - SRAs
780.16 - Fish and wildlife information - SRAs
780.25 - Reclamation plan: Siltation structures, impoundments, banks, dams, and embankments - Industry
780.22 - Geologic information - Industry
780.38 - Support facilities - SRAs
780.28 - Activities in or adjacent to waters of the United States - Industry
780.11 - Operation plan: General requirements - Industry
780.33 - Relocation or use of public roads - Industry
780.33 - Relocation or use of public roads - SRAs
780.14 - Operation plan: Maps and plans - Industry
780.14 - Operation plan: Maps and plans - SRAs
780.16 - Fish and wildlife information - Industry
780.25 - Reclamation plan: Siltation structures, impoundments, banks, dams, and embankments - SRAs
780.35 - Disposal of excess spoil - Industry
780.35 - Disposal of excess spoil - SRAs
780.37 - Road systems - Industry
780.21 - Hydrology information - SRAs
780.27 - Reclamation plan: Surface mining near underground mining - SRAs
780.22 - Geologic information - SRAs
780.29 - Diversions - Industry
780.29 - Diversions - SRAs

Yes
Changing Regulations
No
The Stream Buffer Zone proposed rule is being developed to reduce redundancy in the review process and promote long-term stability for the regulated community.

$137,475
No
No
Uncollected
Uncollected
Uncollected
Uncollected
John Trelease 202 208-2783 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
08/25/2007