OMB files this
comment in accordance with 5 CFR 1320.11(c). This OMB action is not
an approval to conduct or sponsor an information collection under
the Paperwork Reduction Act of 1995. This action has no effect on
any current approvals. If OMB has assigned this ICR a new OMB
Control Number, the OMB Control Number will not appear in the
active inventory. For future submissions of this information
collection, reference the OMB Control Number provided. In
accordance with 5 CFR 1320, OMB is withholding approval at this
time. Prior to publication of the final rule, the agency should
provide a summary of any comments related to the information
collection and their response, including any changes made to the
ICR as a result of comments. In addition, the agency must enter the
correct burden estimates in the ROCIS system.
Inventory as of this Action
Requested
Previously Approved
36 Months From Approved
0
0
0
0
0
0
0
0
0
EPA is proposing a national emission
standard for hazardous air pollutants (NESHAP) for the Electric Arc
Furnace Steelmaking Facilities area source category. The final
standards include emissions limitations and management practice
requirements for new and existing plants based on maximum
achievable control technology (MACT) for mercury emissions and the
generally available control technology or management practices
(GACT) for other HAP metals. Potential respondents include 91
existing electric arc funrace steelmaking facilties that are area
sources. The total annual responses attributable to this ICR for
existing sources are two one-time notifications; preparation of a
startup, shutdown, and malfunction plan; and semiannual reporting.
The owner or operator of new or existing area sources would be
required to comply with all requirements of the General Provisions
(40 CFR part 63, subpart A). No burden estimates are provided for
new area sources because no new facilities are expected during the
next 3 years.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.