EIA-7A Coal Production Report - Mine Prep

Coal Program Package

Form EIA7A (Mine Prep)

Coal Program Package

OMB: 1905-0167

Document [pdf]
Download: pdf | pdf
Coal Production and Preparation Report
(Co-Located Mine and Preparation Plant/Tipple)

U.S. Department of Energy
Energy Information Administration
Form EIA-7A
(March 2008)

Form Approved
OMB No. 1905-0167
Expires:
Burden: 1.5 Hours

Page 1
MSHA #

Please read the instructions provided before completing this form.
NOTICE: This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result
in criminal fines, civil penalties and other sanctions as provided by law. For further information concerning sanctions and data protections
see the provision on sanctions and the provision concerning the disclosure of information in the instructions. Title 18 USC 1001 makes it a
criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,
fictitious, or fraudulent statements as to any matter within its jurisdiction.
GENERAL REPORTING INSTRUCTIONS: Form EIA-7A must be submitted by all coal mining operations that produced and/or processed
10,000 or more short tons of coal and/or worked 5,000 hours or more during the reporting year. A separate Form EIA-7A must be submitted
for each Mine Safety and Health Administration (MSHA) ID.
I. Identification. The shaded areas in this section are reserved for preprinted information. Please make any corrections to the information
shown in these areas by drawing a line through the incorrect information and entering the changes in the space provided at the right.
A. Status Change: Did the ownership change during the year?

□

Yes

□

No

If Yes, give date of change and, as applicable, the name and address of the new owner.
Month
Name of New Owner

Name of New Mining Operation

Address of New Owner (Street)

(City)

New Owner E-mail

New Owner Phone Number

(County)

(State)

Day

Year

(Zip Code)

New Owner Fax Number

Please make any corrections to the mailing label in the area provided at the right and return the completed form in the business reply
envelope provided.
B. Preparer Information

Preparer Name:
Preparer Company Name:
Preparer Street Address:
Preparer City, State, Zip:
Preparer Phone #:
Preparer Fax #:
Preparer E-mail:
C. Company Contact Information

Contact Name:
Contact Title:
Contact Company Name:
Contact Street Address:
Contact City, State, Zip:
Contact Phone #:
Contact Fax #:
Contact E-mail:
D. Name and Location of Mining Operation
Mine Name:
Mine Location (County):
Mine Location (State):

U.S. Department of Energy
Energy Information Administration
Form EIA-7A
(March 2008)

Coal Production and Preparation Report
(Co-Located Mine and Preparation Plant/Tipple)

Form Approved
OMB No. 1905-0167
Expires:
Burden: 1.5 Hours

Page 2
MSHA #

E. Name and Address of Operating Company
Company Name:
Company Address:
Company City, State, Zip:

F. Operating Company Contact Information

Contact Name:
Contact Title:
Contact Street Address:
Contact City, State, Zip:
Contact Phone #:
Contact Fax #:
Contact E-mail:

G. Type of Company Operating this Mining Operation Check one. (See instructions for definitions of company types).
1. Independent Producer Operator
2. Operating Subsidiary
3. Contractor

□

□

□

If you checked Box 1 in Section G above, please skip to Section J. If you checked Box 2, please complete Sections H and I with information
about your Parent Company. If you checked Box 3, please complete Sections H and I with information about the Contractee for which you
are providing services at this mining operation. If there is more than one Parent Company or Contractee, please provide the additional
information for Sections H and I on a separate sheet of paper.
H. Parent Company or Contractee

Company/Contractee Name:
Company/Contractee Address:
Company/Contractee City, State, Zip:

I. Parent Company or Contractee Contact Information

Contact Name:
Contact Title:
Contact Street Address:
Contact City, State, Zip:
Contact Phone #:
Contact Fax #:
Contact E-mail:

Coal Production and Preparation Report
(Co-Located Mine and Preparation Plant/Tipple)

U.S. Department of Energy
Energy Information Administration
Form EIA-7A
(March 2008)

Form Approved
OMB No. 1905-0167
Expires:
Burden: 1.5 Hours

Page 3
MSHA #

J. Kind of Mining Operation

□
□
□

□
□
□

Underground Mine
Surface Mine
Other Facility (if you checked this box, please specify the type of other facility below)
Preparation Plant
Tipple
Loading Dock
Train Loadout

□
□
□
□

Type and Share by Production Method For
Underground Mines
Drift

%

Continuous

Shaft

%

Conventional

Slope

%

Longwall

%

Shortwall

%

Other

□
□
□
□
□
□

100%

Type and Share by Production Method For
Surface Mines
Contour Strip

%

Area

%

Open Pit

%

Mountaintop Removal

%

Auger, Highwall Mine or Punch

%

Silt, Culm, Refuse bank, Slurry Dam or Dredge

%
100%

K. Union Identification. Check the box that applies for this mining operation and the identify the union, if applicable.
Is this mining operation unionized?

□

Yes

□

No

If yes, enter union name here:
L. Mining Location
1. Longitude and Latitude. Please enter the longitude and latitude that best defines the predominant area of mining in the reporting year.
The geographical points reported should represent either the center of mining activity or a central point within the predominantly mined area.
Longitudes and latitudes may change from year to year to reflect the progress of mining.
Longitude

Latitude
Degrees

Minutes

Seconds

Degrees

Minutes

Seconds

2. Datum. Please identify the method and datum that was used in determining the longitude and latitude locations (Please check all boxes
that apply).

□
□
□
□
□
□

Maps on Us (www.mapsonus.com)
U.S. Census Bureau TIGER Map Service
Global Positioning System (GPS)
U.S. Geological Survey MapFinder (USGS)
Unknown
Other ________________________________________

If you selected GPS, USGS or Other, please indicate datum below:

□
□
□
□
□

NAD27 (North American Datum 1927)
WGS84 (World Geodetic Survey 1984)
NAD83 (North American Datum 1983)
Unknown
Other ________________________________________

Coal Production and Preparation Report
(Co-Located Mine and Preparation Plant/Tipple)

U.S. Department of Energy
Energy Information Administration
Form EIA-7A
(March 2008)

Form Approved
OMB No. 1905-0167
Expires:
Burden: 1.5 Hours

Page 4
MSHA #

II. Annual Productive Capacity. Report the maximum amount of coal that your mining operation could
have produced during the year with the existing mining equipment in place, assuming that the labor and
materials sufficient to utilize the equipment were available, and that the market existed for the maximum
coal production.

s.t.

III. Coal Beds Mined. Report the coal bed name, average thickness, percentage of mined coal and rank for each bed mined in the reporting
year. Please exclude partings of 1 inch or thicker from reported average coal bed thicknesses. Coal mined from the same bed should be
reported on one line. An exception is made if the same bed was mined in different pits or sections and if the average thicknesses in those
locations differ by 20% or more. If so, please report separately the average thickness, percentage and rank of the coal bed in the different
mining locations. See Section G of the Instructions for Classification Codes. If more space is needed, please attach an additional page.
For EIA
Use Only

(1) Name of Code Bed

(2) Average
Thickness
(inches)

(3) Share of Production
(%)

(4) Coal
Classification
Code

100%
IV. Recoverable Reserves
A. Recoverable Reserves. Enter the tonnage representing remaining coal reserves at this mine at the
end of the reporting year that you estimate can be recovered (mined) in the future. Exclude coal left in
place after mining. Report to the level of accuracy known, assuming today’s prices and equipment
currently owned and operable. If your recoverable reserves quantity increased or decreased by more than
40% from last year’s response, please explain the change in the remarks section.

s.t.

B. Recovery Percentage. Enter the recovery rate used to estimate reserves at this mine. Report the
mining recovery rate to the nearest whole percent. Minable coal tonnage multiplied by the mining
recovery rate should equal the level of recoverable coal reserves.

%

V. Dispositions of Coal During the Reporting Calendar Year
Quantity
(short tons)
A. Open Market Sales. Sales of coal to all buyers (e.g., other coal mining companies, wholesale
or retail coal dealers or brokers, employees and all consumers)
B. Captive Market Sales. Sales of coal to, or transfers of coal for the use of, the parent
company or a subsidiary of the parent company.
C. Coal Consumed to Operate This Mine (Please exclude coal consumed to generate
electricity that is sold to the grid).
D. Beginning Coal Stocks. Amount of coal stocks held at this mine at the beginning of the
reporting year including adjustments. Do not include pit inventory in coal stocks. Coal stocks
are defined as coal that has been mined and stored awaiting shipment or transfer to a user. Pit
inventory is coal in place which has been surveyed or prepared for mining.
E. Ending Coal Stocks. Amount of coal stocks held at this mine at the end of the reporting year.
Do not include pit inventory in coal stocks. See definitions in D above.

Total Revenue or
Value (dollars)

U.S. Department of Energy
Energy Information Administration
Form EIA-7A
(March 2008)

Coal Production and Preparation Report
(Co-Located Mine and Preparation Plant/Tipple)

Form Approved
OMB No. 1905-0167
Expires:
Burden: 1.5 Hours

Page 5
MSHA #

If coal Open Market sales, as reported in V.A above, are to wholesale or retail coal dealers or brokers, please provide the coal purchasers’
information below.
(1)
Contact Name

(2)
Purchaser

(3)
Contact E-mail Address

(4)
Contact Phone Number

VI. Coal Preparation. Complete this section only if this mine operation includes a preparation plant or tipple which crushes, screens, or
mechanically cleans coal.
a. Percentage of coal prepared which originated at underground mines

%

b. Percentage of coal prepared which originated at surface mines

%

c. Total coal prepared

100%

VII. Additional Remarks. Attach another sheet of paper if necessary.

VIII. Point of Contact. Enter the name, title, telephone number and e-mail address of your company representative who can answer
questions regarding information provided on this form.
Name

Title

Telephone Number

E-mail Address


File Typeapplication/pdf
Authorwwa
File Modified2008-02-05
File Created2008-02-05

© 2024 OMB.report | Privacy Policy