Information Collection Request

30 CFR 780 - Surface Mining Permit Applications - Minimum Requirements for Reclamation and Operation Plan

ICR 200807-1029-002 · OMB 1029-0036 · Historical Active

Forms and Documents
DocumentTypeStatusAvailability
780ss.JR.08.doc Supporting Statement A Uploaded 2009-02-25 Available
780.30.08.pdf Supplementary Document Uploaded 2008-10-09 Available
780.60.08.pdf Supplementary Document Uploaded 2008-09-04 Repair queued
Part 780.doc Supplementary Document Uploaded 2008-09-04 Repair queued
Section 522.doc Supplementary Document Uploaded 2008-09-04 Available
Section 515.doc Supplementary Document Uploaded 2008-09-04 Available
Section 510.doc Supplementary Document Uploaded 2008-09-04 Available
Section 508.doc Supplementary Document Uploaded 2008-09-04 Available
Section 507.doc Supplementary Document Uploaded 2008-09-04 Available
IC Document Collections
IC IDCollectionTypeStatusForm
186423 780.38 - Support facilities. (SRAs) New
186421 780.38 - Support facilities. (Industry) New
186420 780.37 - Road systems. (SRAs) New
186419 780.37 - Road systems. (Industry) New
186417 780.35 - Disposal of excess spoil. (SRAs) New
186415 780.35 - Disposal of excess spoil. (Industry) New
186414 780.33 - Relocation or use of public roads. (SRAs) New
186413 780.33 - Relocation or use of public roads. (Industry) New
186411 780.31 - Protection of publicly owned parks and historic places. (SRAs) New
186410 780.31 - Protection of publicly owned parks and historic places. (Industry) New
186409 780.29 - Diversions. (SRAs) New
186408 780.29 - Diversions. (Industry) New
186407 780.27 - Reclamation plan: Surface mining near underground mining. (SRAs) New
186406 780.27 - Reclamation plan: Surface mining near underground mining. (Industry) New
186405 780.25 - Reclamation plan: Siltation structures, impoundments, banks, dams, and embankments. (SRAs) New
186404 780.25 - Reclamation plan: Siltation structures, impoundments, banks, dams, and embankments. (Industry) New
186403 780.23 - Reclamation plan: Land use information. (SRAs) New
186402 780.23 - Reclamation plan: Land use information (Industry) New
186401 780.22 - Geologic information. (SRAs) New
186400 780.22 - Geologic information. (Industry) New
186399 780.21 - Hydrologic information. (SRAs) New
186398 780.21 - Hydrologic information. (Industry) New
186397 780.18 - Reclamation plan: General requirements. (SRAs) New
186396 780.18 - Reclamation plan: General requirements. (Industry) New
186395 780.16 - Fish and wildlife information. (SRAs) New
186394 780.16 - Fish and wildlife information. (Industry) New
186393 780.15 - Air pollution control plan. (SRAs) New
186392 780.15 - Air pollution control plan. (Industry) New
186391 780.14 - Operation plan: Maps and plans. (SRAs) New
186390 780.14 - Operation plan: Maps and plans. (Industry) New
186388 780.13 - Operation plan: Blasting. (SRAs) New
186387 780.13 - Operation plan: Blasting. (Industry) New
186386 780.12 - Operation plan: Existing structures. (SRAs) New
186385 780.12 - Operation plan: Existing structures. (Industry) New
186384 780.11 - Operation plan: General requirements. (SRA) New
11283 780.11 - Operation plan: General requirements. (Industry) Modified
ICR Details
1029-0036 200807-1029-002
Historical Active 200510-1029-004
DOI/OSMRE 780-renewal
30 CFR 780 - Surface Mining Permit Applications - Minimum Requirements for Reclamation and Operation Plan
Revision of a currently approved collection   No
Regular
Approved with change 03/06/2009
Retrieve Notice of Action (NOA) 10/09/2008
  Inventory as of this Action Requested Previously Approved
03/31/2012 36 Months From Approved 03/31/2009
7,584 0 505
360,163 0 235,128
1,992,395 0 2,258,000

Permit application requirements in Section 507 and 508(g) of PL 95-87 require the applicant to submit the operations and reclamation plans for coal mining activities.

PL: Pub.L. 95 - 87 507, 508, 510, 515, 522 Name of Law: Surface Mining Control and Reclamation Act
  
None

Not associated with rulemaking

  73 FR 37486 07/01/2008
73 FR 59670 10/09/2008
No

36
IC Title Form No. Form Name
780.18 - Reclamation plan: General requirements. (Industry)
780.33 - Relocation or use of public roads. (SRAs)
780.37 - Road systems. (Industry)
780.38 - Support facilities. (SRAs)
780.11 - Operation plan: General requirements. (Industry)
780.25 - Reclamation plan: Siltation structures, impoundments, banks, dams, and embankments. (Industry)
780.25 - Reclamation plan: Siltation structures, impoundments, banks, dams, and embankments. (SRAs)
780.14 - Operation plan: Maps and plans. (Industry)
780.31 - Protection of publicly owned parks and historic places. (Industry)
780.31 - Protection of publicly owned parks and historic places. (SRAs)
780.21 - Hydrologic information. (SRAs)
780.27 - Reclamation plan: Surface mining near underground mining. (Industry)
780.35 - Disposal of excess spoil. (SRAs)
780.38 - Support facilities. (Industry)
780.15 - Air pollution control plan. (Industry)
780.33 - Relocation or use of public roads. (Industry)
780.37 - Road systems. (SRAs)
780.27 - Reclamation plan: Surface mining near underground mining. (SRAs)
780.29 - Diversions. (Industry)
780.12 - Operation plan: Existing structures. (Industry)
780.14 - Operation plan: Maps and plans. (SRAs)
780.35 - Disposal of excess spoil. (Industry)
780.22 - Geologic information. (Industry)
780.16 - Fish and wildlife information. (Industry)
780.23 - Reclamation plan: Land use information (Industry)
780.16 - Fish and wildlife information. (SRAs)
780.18 - Reclamation plan: General requirements. (SRAs)
780.13 - Operation plan: Blasting. (Industry)
780.23 - Reclamation plan: Land use information. (SRAs)
780.15 - Air pollution control plan. (SRAs)
780.22 - Geologic information. (SRAs)
780.13 - Operation plan: Blasting. (SRAs)
780.21 - Hydrologic information. (Industry)
780.29 - Diversions. (SRAs)
780.11 - Operation plan: General requirements. (SRA)
780.12 - Operation plan: Existing structures. (SRAs)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 7,584 505 0 0 7,079 0
Annual Time Burden (Hours) 360,163 235,128 0 0 125,035 0
Annual Cost Burden (Dollars) 1,992,395 2,258,000 0 0 -265,605 0
No
No
This information collection request increases the estimated burden by approximately 125,000 hours due to a re-estimate in individual respondent burden, an adjustment. This is offset, somewhat, by a reduction in respondent costs of $265,605, also due to a re-estimate in individual respondent burden.

$170,610
No
No
Uncollected
Uncollected
Uncollected
Uncollected
John Trelease 202 208-2783 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
10/09/2008