The items covered by this information
collection package are used for the planning and design of electric
distribution, transmission, and generation system and facilities
owned by RUS Borrowers.
The combined reduction in
respondents and the re-evaluation by the Electric programs to
double the estimated time to complete the Engineering Service
Contract due to a lack of assistance from clerical/support staff
and full completion by an engineer/architect resulted in an overall
decrease in burden of -57 hours.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.