Form 300 Review Rating Summary

7 CFR 1730 Review Rating Summary

Form 300 OM Review Rating Summary rev 3_09.xls

7 CFR 1730 Review Rating Summary

OMB: 0572-0025

Document [xlsx]
Download: xlsx | pdf

Overview

RUS FORM 300 PAGE 1
RUS FORM 300 PAGE 2
Status of O&M Activities


Sheet 1: RUS FORM 300 PAGE 1

According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a












valid OMB control number. The valid OMB control number for this information collection is 0572-0025. The time required to complete this information collection is estimated to average












4 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the












collection of information.












UNITED STATES DEPARTMENT OF AGRICULTURE BORROWER DESIGNATION




RURAL UTILITIES SERVICE








REVIEW RATING SUMMARY DATE PREPARED





















Ratings on form are:

0: Unsatisfactory -- No Records

2: Acceptable, but Should be Improved -- See Attached Recommendations






NA: Not Applicable

1: Corrective Action Needed

3: Satisfactory -- No Additional Action Required at this Time






PART I. TRANSMISSION and DISTRIBUTION FACILITIES
1. Substations (Transmission and Distribution)




(Rating) 4. Distribution - Underground Cable




(Rating)
a. Safety, Clearance, Code Compliance





a. Grounding and Corrosion Control





b. Physical Conditions: Structure, Major Equipment, Appearance





b. Surface Grading, Appearance





c. Inspection Records - Each Substation





c. Riser Pole: Hazards, Guying, Condition





d. Oil Spill Prevention



















5. Distribution Line Equipment: Conditions and Records





2. Transmission Lines





a. Voltage Regulators





a. Right-of-Way: Clearing, Erosion, Appearance, Intrusions





b. Sectionalizing Equipment





b. Physical Condition: Structure, Conductor, Guying





c. Distribution Transformers





c. Inspection Program and Records





d. Pad Mounted Equipment













Safety: Locking, Dead Front, Barriers




3. Distribution Lines - Overhead






Appearance: Settlement, Condition




a. Inspection Program and Records






Other




b. Compliance with Safety Codes:


Clearances

e. Kilowatt-hour and Demand Meter









Foreign Structures

Reading and Testing









Attachments








c. Observed Physical Condition from Field Checking:
















Right-of-Way












Other






















PART II. OPERATIONS and MAINTENANCE
6. Line Maintenance and Work Order Procedures




(Rating) 8. Power Quality




(Rating)
a. Work Planning & Scheduling





a. General Freedom from Complaints





b. Work Backlogs:

Right-of-Way Maintenance












Poles


9. Loading and Load Balance








Retirement of Idle Services


a. Distribution Transformer Loading








Other


b. Load Control Apparatus





7. Service Interruptions





c. Substation and Feeder Loading





a. Average Annual Minutes/Consumer by Cause (Complete for each of the previous 5 years)












PREVIOUS POWER MAJOR PLANNED ALL TOTAL
10. Maps and Plant Records





5 YEARS SUPPLIER EVENT
OTHER

a. Operating Maps: Accurate and Up-to-Date





(Year) a. b. c. d. e. (Rating) b. Circuit Diagrams










0.00
c. Staking Sheets










0.00












0.00












0.00












0.00







b. Emergency Restoration Plan


























PART III. ENGINEERING
11. System Load Conditions and Losses




(Rating) 13. Load Studies and Planning




(Rating)
a. Annual System Losses


%

a. Long Range Engineering Plan





b. Annual Load Factor


%

b. Construction Work Plan





c. Power Factor at Monthly Peak


%

c. Sectionalizing Study





d. Ratios of Individual Substation Annual Peak kW to kVA





d. Load Data for Engineering Studies












e. Load Forecasting Data





12. Voltage Conditions












a. Voltage Surveys












b. Substation Transformer Output Voltage Spread


























RUS Form 300 (Rev. 3-09)









PAGE 1 OF 2 PAGES


Sheet 2: RUS FORM 300 PAGE 2

PART IV. OPERATION AND MAINTENANCE BUDGETS

For Previous 2 Years For Present Year For Future 3 Years
YEAR






Actual Actual Budget Budget Budget Budget

$ Thousands $ Thousands $ Thousands $ Thousands $ Thousands $ Thousands






0
Normal
Operation







0
Normal
Maintenance







0
Additional


(Deferred)


Maintenance







0 0 0 0 0 0
Total








14. Budgeting: Adequacy of Budgets for Needed Work


(Rating)








15. Date Discussed with Board of Directors


(Date)















EXPLANATORY NOTES







ITEM NO. COMMENTS















































































































































































































TITLE DATE

Insert Title of Person That Provided Ratings

RATED BY:


Insert Title of Reviewer: General Manager, CEO, etc.

REVIEWED BY:






REVIEWED BY: RUS GFR



RUS Form 300 (Rev. 3-09)




PAGE 2 OF 2 PAGES

Sheet 3: Status of O&M Activities

STATUS OF O&M ACTIVITIES
ATTACHMENT TO RUS FORM 300
(OPTIONAL FORM - NOT REQUIRED)
SYSTEM DESIGNATION
Date Long Range System Engineering Plan Approved

Date Annual Work Plan Approved
Date of Last Load and Voltage Survey
STATISTICS
YEAR ____ ____ ____ ____ ____
Miles of Distribution Line




Miles of Transmission Line




Number of Substations




Sum of Substation Peak Demands (kW)




Average Number of Consumers




Plant Investment ($ x 1,000)




Operation Expense ($ x 1,000)




Maintenance Expense ($ x 1,000)




ROW CLEARING
Units on System




Units Recleared




Regrowth Cycle (Years)




POLES
Number on System




Number Inspected




Number Condemned




Number Replaced




OIL CIRCUIT RECLOSERS
Number on System




Number Serviced




LINE REGULATORS
Number on System




Number Serviced




METERS
Number on System




Number Serviced




PATROL AND MAINTENANCE
Miles of Distribution Patrolled




Miles Distribution Maintained




Miles of Transmission Patrolled




Miles of Transmission Maintained




Number of Substations Serviced




AVERAGE MINUTES OUTAGE PER CONSUMER
Power Supply




Major Event




All Other




Total









RUS Form 300 Attachment (Rev. 3-09)

File Typeapplication/vnd.ms-excel
AuthorCliff Burris
Last Modified Bymichele.brooks
File Modified2009-03-10
File Created2001-03-09

© 2024 OMB.report | Privacy Policy