U.S. Department |
|
|
|
|
|
|
|
State: |
|
|
of Transportation, |
|
|
|
|
|
|
|
0 |
|
|
Federal Highway |
|
|
|
TOLL FACILITY EXPENDITURES |
|
|
|
Year Ending (mm/yy): |
|
|
Administration |
|
|
|
NOTE: This collection of information is required by 23 U.S.C. 104 (b) and 105 (b); and 23 C.F.R. 1.5 and 420.105(b). Public reporting burden is estimated to average 206 hours per response. The Guide data is used by FHWA in administering the Federal-Aid Highway Program; in assessing highway policies, programs and performance of the Nation’s highway transportation system; in identifying future highway system investment needs; and in making policy and program recommendations. Please note that an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The OMB control number for this collection is 2125-0032, which expires on XX/XX/XXXX. |
|
|
|
0 |
|
|
|
|
|
|
|
Identify by Facility, Functional System or NHS |
|
|
|
|
|
|
|
|
|
|
|
Detail on Expenditures |
Total |
|
|
|
|
|
|
(State Facilities only) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
VI. |
Capital Outlay |
|
|
|
|
|
|
|
|
|
|
A. |
New Facilities |
|
|
|
|
|
|
|
|
|
|
1. |
Right-of-way Costs |
|
|
|
|
|
|
|
|
|
2. |
Engineering Costs |
|
|
|
|
|
|
|
|
|
3. |
Construction of New Roads |
|
|
|
|
|
|
|
|
|
4. |
Construction of New Bridges |
|
|
|
|
|
|
|
|
|
5. |
Total (1 through 4) |
|
|
|
|
|
|
|
|
B. |
Capacity Additions to Existing Facilities |
|
|
|
|
|
|
|
|
|
|
1. |
Right-of-way Costs |
|
|
|
|
|
|
|
|
|
2. |
Engineering Costs |
|
|
|
|
|
|
|
|
|
3. |
Relocation with Added Capacity |
|
|
|
|
|
|
|
|
|
4. |
Reconstruction with Added Capacity |
|
|
|
|
|
|
|
|
|
5. |
Major Widening |
|
|
|
|
|
|
|
|
|
6. |
Bridge Replacement with Added Capacity |
|
|
|
|
|
|
|
|
|
7. |
Bridge Rehabilitation with Added Capacity |
|
|
|
|
|
|
|
|
|
8. |
Total (1 through 7) |
|
|
|
|
|
|
|
|
C. |
System Preservation |
|
|
|
|
|
|
|
|
|
|
1. |
Right-of-way Costs |
|
|
|
|
|
|
|
|
|
2. |
Engineering Costs |
|
|
|
|
|
|
|
|
|
3. |
Relocation with No Added Capacity |
|
|
|
|
|
|
|
|
|
4. |
Reconstruction with No Added Capacity |
|
|
|
|
|
|
|
|
|
5. |
Restoration, Rehabilitation and Resurfacing |
|
|
|
|
|
|
|
|
|
6. |
Minor Widening |
|
|
|
|
|
|
|
|
|
7. |
Bridge Replacement with No Added Capacity |
|
|
|
|
|
|
|
|
|
8. |
Bridge Rehabilitation with No Added Capacity |
|
|
|
|
|
|
|
|
|
9. |
Total (1 through 8) |
|
|
|
|
|
|
|
|
D. |
System Enhancement and Operation |
|
|
|
|
|
|
|
|
|
|
1. |
Engineering Costs |
|
|
|
|
|
|
|
|
|
2. |
Safety Improvements |
|
|
|
|
|
|
|
|
|
3. |
Traffic Management and Traffic Engineering |
|
|
|
|
|
|
|
|
|
4. |
Environmental Improvements |
|
|
|
|
|
|
|
|
|
5. |
Other Enhancements |
|
|
|
|
|
|
|
|
|
6. |
Total (1 through 5) |
|
|
|
|
|
|
|
|
E. |
Grand Total (A.5.+B.8.+C.9.+D.6.) |
|
|
|
|
|
|
|
|
VII. |
Maintenance |
|
|
|
|
|
|
|
|
|
Notes and Comments: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Optional Form FHWA-539 (6-2000) |
|
|
|
|
|
2 |
|
|
|
Excel |