Mine Operator Dust Data Card: 30 CFR Sections 70.209, 71.209, and 90.209 - Mine
Operator Dust Data Card; 70.201(c), 71.201(c), and 90.201(c) - Reporting Operator
Sampling Dates; 70.202(b), 71.202(b), and 90.202(b) - Dust Sampling Certification;
70.204, 71.204 and 90.204 – Approved Sampling Devices, Maintenance and Calibration ;
70.210 and 71.210– Posting of Operator Dust Sample Data; 70.220(a), 71.220(a), and
90.220- Reporting Status Changes; and 71.300, 71.301(d), 90.300 and 90.301(d) Respirable Dust Control Plan and Posting.
A. Justification
1.
Explain the circumstances that make the collection of information necessary.
Identify any legal or administrative requirements that necessitate the collection.
Attach a copy of the appropriate section of each statute and regulation mandating or
authorizing the collection of information.
Prolonged exposure to excessive amounts of respirable coal mine dust can cause
respiratory problems, ranging from mild impairment of respiratory function to more
severe diseases such as coal workers’ pneumoconiosis (CWP), commonly referred to as
“black lung” disease, and silicosis. These occupational lung diseases are debilitating,
and in severe cases, disabling and fatal. While considerable progress has been made in
lowering dust levels since 1970 and, consequently, the prevalence rate of CWP among
coal miners, severe forms of this disease continue to be identified. Newly released
information from the federally funded Coal Workers’ Health Surveillance Programs
administered by the National Institute for Occupational Safety and Health (NIOSH)
clearly indicate that CWP remains a key occupational health risk among our nation’s
coal miners. According to NIOSH, 578 or 3.2 percent of the 18,078 underground coal
miners x-rayed between January 2003 and September 2008 were found to have CWP.
Also, in FY 2007, over 13,400 former coal miners and the dependents of miners
received $572 million in "black lung" benefits. And, since inception of the federal Black
Lung Benefits Program in 1970, over $43 billion in total benefits have been paid out to
former miners and their dependents.
Section 103(h) of the Federal Mine Safety and Health Act of 1977 (Mine Act), 30 U.S.C.
§ 813(h), authorizes MSHA to collect information necessary to carry out its duty in
protecting the safety and health of miners. Further, Section 202(a) of the Mine Act, 30
U.S.C. § 84(a), and its implementing regulations in 30 CFR parts 70 and 71, require coal
mine operators to protect miners from exposure to excessive dust levels by
continuously maintaining the average concentration of respirable coal mine dust in the
mine atmosphere where they normally work or travel at or below 2.0 milligrams per
July 2009
1

1219-0011
cubic meter (mg/m3). This standard is further reduced, using the formula 10 ÷ %
quartz, when the respirable dust contains more than 5% quartz since this presents an
additional respiratory hazard that can cause silicosis. Also, under 30 CFR part 90, any
coal miner (Part 90 miner) who has early evidence of the development of CWP and
elects to work in a low-dust environment cannot be exposed to dust levels exceeding
1.0 mg/m3. This standard is also reduced further if more than 10% quartz is found in
their work environment.
Existing regulations provide that coal mine operators sample bimonthly designated
occupations or work locations and submit these samples to MSHA for analysis to
determine if the mine is complying with the applicable dust standards. Specifically,
under 30 CFR part 70, each underground coal mine operator must sample the
designated occupation (DO) in each mechanized mining unit (MMU) for five
consecutive shifts or days, and each designated area (DA) for one shift at locations
specified in the operator’s approved mine ventilation plan. Under 30 CFR part 71, each
coal mine operator must sample bimonthly at surface coal mines and surface areas of
underground mines the designated work positions (DWP). Under 30 CFR part 90,
each coal mine operator must sample bimonthly each Part 90 miner a minimum of one
shift.
Under 30 CFR parts 70, 71, and 90, only certified persons may conduct these dust
samplings. These individuals, under §§ 70.209, 71.209, and 90.209, must then complete
all fields on the dust data card including the Mine ID Number, Contractor Code, Mine
Name, Company Name, Date and Time Sampled, Tons this Shift, Type of Sample,
MMU, Occ Code, and MIIN, for each dust sample submitted to MSHA for processing.
To become certified, §§ 70.202(b), 71.202(b), and 90.202(b) require that the person pass
the MSHA examination on sampling for respirable coal mine dust. If MSHA wishes to
monitor operator sampling activities, §§ 70.201(c), 71.201(c), and 90.201(c) authorize the
District Manager to require the mine operator to submit in advance the date(s) when
mandated sampling will be conducted. This information has been used by the Agency
in scheduling its sampling visits so as not to interfere with operator sampling.
These certified persons may only use sampling devices maintained as approved under
30 CFR part 74 (Coal Mine Dust Personal Sampler Units) and calibrated in accordance
with MSHA Informational Report IR 1240 (1996) “Calibration and Maintenance
Procedures for Coal Mine Respirable Dust Samplers” (§§ 70.204(a), 71.204(a), and
90.204(a)). These sampling devices must be calibrated before they are put into service
and, thereafter, at intervals not to exceed 200 hours of operating time (§§ 70.204 (b),
71.204 (b), and 90.204 (b)).

July 2009

2

1219-0011
After MSHA processes the submitted samples, it sends a report of the results to the
mine operator (§§ 70.210(a), 71.210(a) and 90.210(a)), which contains the following
information: the mine identification number; the specific entity from which the
samples were taken; the concentration of respirable dust for each valid sample; the
average concentration for all valid samples; the occupation code, where applicable; and
the reason for voiding any sample. When received by a mine operator, the report
must be immediately posted on the mine bulletin board for at least 31 days so all coal
miners will know the dust levels to which they were exposed (§§ 70.210(b) and
71.210(b)). For part 90 sampling results, the mine operator must provide the report to
the affected miner (§ 90.210(b)).
When a change occurs in the operational status of any designated sampling entity or
with the part 90 miners that affects the operator’s ability to fulfill his/her sampling
responsibilities, §§ 70.220(a), 71.220(a), and 90.220 require the operator to report
changes in operational status to MSHA in writing within 3 working days of the status
change.
When MSHA analyzes samples and if the results exceed the applicable dust standard,
the operator is either cited for violating the dust standard and assessed a civil penalty
(MMUs only) or is required to submit five additional samples. These additional
samples averaged to determine whether operator is complying with the applicable
standard. If the average exceeds the standard, MSHA will issue a citation for excessive
dust. To abate an excessive dust violation, §§ 70.201(d), 71.201(d), and 90.201(d)
require the operator to take corrective action and reduce dust concentrations to the
appropriate levels and then sample the affected MMU, DA, DWP, or part 90 miner
until five valid respirable dust samples are collected and submitted to MSHA for
processing. The results of these samples determine if the operator was successful in
correcting the excessive dust condition.
Sections 71.300 and 90.300 (affecting surface operations and part 90 miners) require the
submission of a written respirable dust control plan to MSHA for approval within 15
calendar days after the termination date of a citation for violation of the dust standard.
Such a plan describes the specific dust control measures used by an operator to abate
the dust violation and how each control measure will be used to ensure continued
compliance.
Lastly, § 71.301(d) requires the approved dust control plan to be posted on the mine
bulletin board to inform interested persons at the mine of the types and location of
dust control measures that are required to be employed and maintained. However, for
privacy reasons, § 90.301(d) prohibits posting of the dust control plan for part 90
miners and, instead, requires that a copy be provided to the affected miner.
July 2009
3

1219-0011

2.
Indicate how, by whom, and for what purpose the information is to be used.
Except for a new collection, indicate the actual use the agency has made of the
information received from the current collection.
The information provided by the mine operator on the dust data card that accompanies
each dust sample submitted to MSHA for processing, the reporting of when such
samples will be taken when District Manager requests, and the reporting of any
changes in operation status affecting sampling is vital to effectively administer and
assess the effectiveness of the operator sampling program. MSHA has used the
information received from the current collection not only to determine which mine
operators have fully complied with the sampling provisions stipulated in the
regulations but also which failed to adequately protect miners from excessive dust
concentrations and needed to take appropriate measures to improve the quality of the
mine air that miners breathe. Also, once the dust samples submitted by coal mine
operators are processed by MSHA, it uses the collected information for reporting the
results of respirable dust samples to the appropriate mine operators under §§ 70.210(a),
71.210(a) and 90.210(a), so that the results can be posted on the mine bulletin board for
viewing by all miners as required by §§ 70.210(b) and 71.210(b). These results enable
the Agency to more effectively evaluate the adequacy of the operator’s dust control
systems, to identify mine operators for targeted enforcement activities, and to plan and
undertake special health emphasis initiatives.
Mine operators whose samples exceed the applicable standard are either notified to
submit additional samples (involving DA, DWP, or Part 90 miner entity types only) or
are cited for violating the applicable standard. As discussed earlier, once cited by
MSHA, the operator must promptly take corrective action and then submit five
abatement samples to demonstrate that dust levels have been reduced within the
applicable standard.
Once a respirable dust control plan, submitted in accordance with either § 71.300 or
90.300, is approved by MSHA, its provisions must be employed and complied with on
a continuous basis. Posting of the plan in accordance with § 71.301(d) allows the
affected miners to acquaint themselves with the types and locations of dust control
measures that are required to be employed and maintained. If it involves a part 90
miner, § 90.301(d) requires the mine operator to provide a copy of the dust control plan
directly to the affected part 90 miner. MSHA inspectors use the information provided
in the plan to determine whether the operator is complying with all plan provisions,
and to assess the plan’s continued effectiveness in maintaining compliance with the
applicable standards.
July 2009

4

1219-0011
3.
Describe whether, and to what extent, the collection of information involves
the use of automated, electronic, mechanical, or other technological collection
techniques or other forms of information technology, e.g., permitting electronic
submission of responses, and the basis for the decision for adopting this means of
collection. Also describe any consideration of using information technology to
reduce burden.
No improved information technology has been identified by MSHA that would reduce
the burden associated with the completion of dust data cards. This is because each
operator-collected sample when transmitted to MSHA for processing must be
physically attached to its properly completed accompanying dust data card. The
information recorded on the dust data card provides important details about the
sample, when and where it was collected, the production conditions in effect during
sampling, and who was responsible for certifying that it was properly collected.
Consequently, this particular information collection technique does not lend itself to
electronic submission. However, mine operators submit up to 90% of sampling dates
(§§ 70.201(c), 71.201(c), and 90.201(c)), status change reports (§§ 70.220(a), 71.220(a),
and 90.220), and respirable dust control plans (§§ 71.300 and 90.300) electronically.
These electronic submissions account for about 16% of the total responses received.
4.
Describe efforts to identify duplication. Show specifically why any similar
information already available cannot be used or modified for use for the purposes
described in Item 2 above.
A mine operator completes a dust data card for each individual dust sample collected
and submitted to MSHA to demonstrate that his or her mine is free of excessive dust
concentrations and, therefore, is complying with mandatory exposure limits. Without
these samples and the accompanying specified information about each sample and the
production conditions in effect during sampling, MSHA could not ascertain a mine
operator’s compliance with mandatory dust exposure limits. While MSHA also
conducts dust sampling periodically, its purpose is to not only to supplement the
operator’s sampling program but also to: (1) monitor the effectiveness of the operator's
respirable dust control programs; (2) determine whether the occupation being sampled
by the operator has been properly designated for sampling as the occupation at risk of
being exposed to the highest dust concentrations; (3) determine if excessive levels of
quartz are present which would require the dust standard to be reduced further to be
more protective; and (4) identify work positions at surface mines or surface areas of
underground mines that should be designated for routine bimonthly monitoring by
coal mine operators. Since the purpose of MSHA and operator sampling have
somewhat different objectives, there is no duplication of effort. MSHA knows of no
other federal, state, or local agency that collects similar information on dust samples
July 2009
5

1219-0011
required for compliance purposes or that collects similar information on respirable
dust control plans.
5.
If the collection of information impacts small businesses or other small
entities (Item 5 of OMB Form 83-I), describe any methods used to minimize burden.
These information collection requirements are imposed on all coal mining operations
and not have a greater impact on small businesses or other small entities. However,
MSHA believes that the burden on small mines could not be reduced without
adversely affecting MSHA’s dust control enforcement efforts.
6.
Describe the consequence to Federal program or policy activities if the
collection is not conducted or is conducted less frequently, as well as any technical
or legal obstacles to reducing burden.
Because mining conditions are constantly changing, the quality of the air that miners
breathe must be monitored on a routine basis to ensure that it is free of excessive dust
levels to prevent development of CWP. Therefore, Mine Act and its implementing
regulations require specific occupations, miners, and work locations be sampled by
mine operators every 2 months (bimonthly). Since the frequency at which mine
operators currently sample represents a very small percentage of the available shifts
worked during a two-month period, monitoring the quality of the mine air that miners
breathe less frequently would provide an inadequate snap shot of the dust conditions
to which miners are normally exposed, thus increasing the likelihood for excessive
dust conditions to go undetected. Consequently, the health of miners would be
adversely impacted if excessive dust concentrations could not be detected and
properly acted on. Failing to identify where, when, by whom, and under what
production conditions specific samples were collected would render the sampling
results meaningless and of no practical value.
7.
Explain any special circumstances that would cause an information collection
to be conducted in a manner:
•

requiring respondents to report information to the agency more often than
quarterly;

•

requiring respondents to prepare a written response to a collection of
information in fewer than 30 days after receipt of it;

July 2009

6

1219-0011
•

requiring respondents to submit more than an original and two copies of any
document;

•

requiring respondents to retain records, other than health, medical, government
contract, grant-in-aid, or tax records for more than three years;

•

in connection with a statistical survey, that is not designed to produce valid and
reliable results that can be generalized to the universe of study;

•

requiring the use of a statistical data classification that has not been reviewed
and approved by OMB;

•

that includes a pledge of confidentiality that is not supported by authority
established in statute or regulation, that is not supported by disclosure and data
security policies that are consistent with the pledge, or which unnecessarily
impedes sharing of data with other agencies for compatible confidential use; or

•

requiring respondents to submit proprietary trade secret, or other confidential
information unless the agency can demonstrate that it has instituted procedures
to protect the information's confidentiality to the extent permitted by law.

For the reasons stated earlier, under §§ 70.207, 70.208, 71.208, and 90.208, MSHA
requires mine operators to submit compliance samples bimonthly and under §§ 70.201,
71.201, and 90.201, mine operators submit abatement samples following issuance of a
citation for the sole purpose of demonstrating that their workplaces are free of
excessive dust concentrations and in compliance with mandatory dust exposure limits.
Also, if the operational status of a designated sampling entity or the part 90 miner has
a direct impact on the operator’s ability to fully comply with the sampling
requirements, §§ 70.220(a), 71.220(a), and 90.220 require the operator report any status
changes in writing within 3 days after the status change occurs. Proper notification
prevents MSHA from taking unnecessary enforcement actions against mine operators
for failing to submit the required number of dust samples during a bimonthly period.
Once adopted by the mine operator, a respirable dust control plan must remain in
effect for the life of the surface mine, surface facility, or surface area of an underground
mine, or until the MSHA district manager determines that the plan is no longer
necessary. Valid respirable dust control plans provide the basis for MSHA to
determine whether or not miners will be adequately protected from excessive dust
concentrations during each shift. The collection of information is otherwise consistent
with the guidelines in 5 CFR 1320.5.
July 2009

7

1219-0011
8.
If applicable, provide a copy and identify the data and page number of
publication in the Federal Register of the agency's notice, required by 5 CFR
1320.8(d), soliciting comments on the information collection prior to submission to
OMB. Summarize public comments received in response to that notice and describe
actions taken by the agency in response to these comments. Specifically address
comments received on cost and hour burden.
Describe efforts to consult with persons outside the agency to obtain their
views on the availability of data, frequency of collection, the clarity of instructions
and recordkeeping, disclosure, or reporting format (if any), and on the data elements
to be recorded, disclosed, or reported.
Consultation with representatives of those from whom information is to be
obtained or those who must compile records should occur at least once every 3 years
-- even if the collection of information activity is the same as in prior periods. There
may be circumstances that may preclude consultation in a specific situation. These
circumstances should be explained.
MSHA published a 60-day preclearance Federal Register notice on April 30, (Volume
74, Number 82, Pages 19988-19989 soliciting public comments regarding the extension
of this information collection. No comments were received.
9.
Explain any decision to provide any payment or gift to respondents, other
than remuneration of contractors or grantees.
MSHA does not provide payments or gifts to respondents identified by this collection.
10.
Describe any assurance of confidentiality provided to respondents and the
basis for the assurance in statute, regulation, or agency policy.
All records pertaining to Part 90 miners are kept confidential and stored in locked
cabinets at applicable District Offices, and accessed only by authorized individuals.
For the information collected under part 70, 71, and 90 that is entered into the MSHA
Standard Information System (MSIS), only authorized persons have access to the
information in this system.
No other assurances of confidentiality are provided. However, in the event a mine
operator should include proprietary information in the respirable dust control plan,
such data will be kept confidential by MSHA consistent with the guidelines outlined in
5 U.S.C. § 552(b)(4).
July 2009

8

1219-0011
11.
Provide additional justification for any questions of a sensitive nature, such
as sexual behavior and attitudes, religious beliefs, and other matters that are
commonly considered private. This justification should include the reasons why the
agency considers the questions necessary, the specific uses to be made of the
information, the explanation to be given to persons from whom the information is
requested, and any steps to be taken to obtain their consent.
There are no questions of a sensitive nature.
12.
Provide estimates of the hour burden of the collection of information. The
statement should:
•

Indicate the number of respondents, frequency of response, annual hour
burden, and an explanation of how the burden was estimated. Unless directed
to do so, agencies should not conduct special surveys to obtain information
on which to base hour burden estimates. Consultation with a sample (fewer
than 10) of potential respondents is desirable. If the hour burden on
respondents is expected to vary widely because of differences in activity, size,
or complexity, show the range of estimated hour burden, and explain the
reasons for the variance. Generally, estimates should not include burden
hours for customary and usual business practices.

•

If this request for approval covers more than one form, provide separate hour
burden estimates for each form and aggregate the hour burdens in Item 13 of
OMB Form 83-I.

•

Provide estimates of annualized cost to respondents for the hour burdens for
collections of information, identifying and using appropriate wage rate
categories. The cost of contracting out or paying outside parties for
information collection activities should not be included here. Instead, this
cost should be included in Item 13.

The number of responses for this submission is 41,000 from 830 unique respondents
(mining operations).
30 CFR 70.209, 71.209, and 90.209: During the past three fiscal years (FY’08 – ’06),
MSHA processed an average of 41,000 dust data cards annually from some 570
underground mines and 316 surface mines and facilities (FY’08: 41, 587 data cards from
857 respondents; FY’07: 40, 872 data cards from 887 respondents; FY’06: 40, 533 data
cards from 913 respondents), or approximately the same as was projected in the
previous submission. Based on the Agency’s recent experience, and given the coal
July 2009

9

1219-0011
supply and demand situation arising from the global economic slowdown, the number
of dust data cards it expects to receive and process in the near term will be
approximately 41,000 annually from approximately 830 unique respondents, based on
the 3.1% average annual decline in respondents since FY’06. Of this total,
approximately two-thirds or 27,350 data cards will be submitted by mine operators
doing their own sampling; 10,850 by operators who rent the sampling equipment from
outside parties; and the remaining 2,800 by independent contractors. The cost of
equipment rental and contractor sampling services is included in Item 13. MSHA
estimates that it requires approximately 35 minutes (0.58 hours) per sample to prepare
the approved sampler unit and 10 minutes (0.17 hour) to make the required
operational checks (monitoring) during the shift. This work, except for the actual
monitoring of sampler operation (0.17 hour per sample), is performed by a certified
dust technician earning approximately $26.23 per hour. A mine supervisor, earning an
average of $73.25 per hour, normally monitors the operation of the sampler unit during
the shift. It is estimated that, for operators doing their own sampling, it will take a
technician, earning $26.23 per hour, approximately 10 minutes (0.17 hour) to complete
and sign each dust data card.
Hour Burden
27,350 samples x 0.58 hrs.
27,350 + 10,850 samples x 0.17 hr.
(monitoring)
27,350 +10,850 samples x 0.17 hr. (complete
and sign data card)
Subtotal
Hour Burden Cost
15,863 hrs. x $26.23
6,494 hrs. x $73.25
6,494 hrs. x $26.23
Subtotal

=

15,863 hrs.

=

6,494 hrs.

=
=

6,494 hrs.
28,851 hrs.

=$
=$
=$
=$

416,086
475,686
170,338
1,062,110

30 CFR 70.201(c), 71.201(c), and 90.201(c): If MSHA chooses to observe operator
sampling, these requirements give the District Manager the authority to require a mine
operator to submit in advance the dates when sampling will be conducted. The
Agency anticipates requesting and receiving sampling schedules from approximately
75% of the projected underground respondents (531 or 64% of 830 total respondents) or
398 schedules on average per year, beginning in FY 2009. MSHA estimates that it will
take a mine supervisor, earning $73.25 per hour, an average of 20 minutes (0.33 hour)
to prepare a bimonthly sampling schedule, and a mine clerk, earning $26.23 per hour,
July 2009

10

1219-0011
another 10 minutes (0.17 hour) to type and either mail, fax, or transmit electronically
the schedule to the MSHA District Office.
Hour Burden
398 schedules x 0.33 hr.
398 schedules x 0.17 hr.
Subtotal

=
=
=

Hour Burden Cost
131 hrs. x $73.25
68 hrs. x $26.23
Subtotal

=$
=$
=$

131 hrs.
68 hrs.
199 hrs.
9,596
1,784
11,380

30 CFR 70.202(b), 71.202(b), and 90.202(b): These standards require a certified person
to conduct respirable dust sampling and to sign the dust data card that accompanies
each sample transmitted to MSHA. To become certified, an individual must pass the
MSHA examination on sampling of respirable coal mine dust. The Agency estimates
that it will certify approximately 400 individuals in FY 2009. Of these, 40 individuals
(15 mine supervisors earning $73.25 per hour and 35 technicians earning $26.23 per
hour) will take both the training class and the certification exam (avg. 8 hours in
length), while the remaining 360 individuals (120 mine supervisors; 120 miners earning
$34.17 per hour; and 120 technicians) will opt for taking the examination only (avg. 2
hours).
Hour Burden
15 mine supervisors x 8 hrs.
25 technicians x 8 hrs.
120 mine supervisors x 2 hrs.
120 miners x 2 hrs.
120 technicians x 2 hrs.
Subtotal
Hour Burden Cost
120 hrs. x $73.25
200 hrs. x $26.23
240 hrs. x $73.25
240 hrs. x $34.17
240 hrs. x $26.23
Subtotal
July 2009

11

=
=
=
=
=
=

120 hrs.
200 hrs.
240 hrs.
240 hrs.
240 hrs.
1,040 hrs.

=$
=$
=$
=$
=$
=$

8,790
5,246
17,580
8,201
6,295
46,112

1219-0011
30 CFR 70.210(b) and 71.210(b): Upon receipt of the results of dust sampling from
MSHA, the operator must post the report for at least 31 days on the mine bulletin
board so that it can be viewed by all affected coal miners. Based on the types of
entities required to be sampled bimonthly (during the 2nd quarter of FY’09:
Mechanized Mining Units – 949; Designated Areas – 996; Part 90 miners – 74; and
Designated Work Positions – 360), and historical experience, each will require a report
of sampling results to be generated by MSHA every two months. MSHA projects that
it will generate approximately 15,000 sampling reports annually. It will take a mine
clerk, earning $25.23 per hour, an average of 5 minutes (0.083 hour) to post it on the
mine bulletin board.
Hour Burden
15,000 reports x 0.083 hr.

=

1,245 hrs.

Hour Burden Cost
1,245 hrs. x $25.23

=$

31,411

30 CFR 70.220(a), 71.220(a), and 90.220: These standards require the operator to report
changes in the operational status of any designated sampling entity that affects the
sampling requirements of 30 CFR Parts 70, 71, and 90. Such changes must be reported
in writing to the MSHA District Office within 3 working days after the status change
has occurred. According to MSHA records, some 2,380 entities were in sampling
status during the 2nd quarter of FY’09. It anticipates receiving on average
approximately 3 status changes per entity per year or 7,140 annually. It will take a
mine supervisor, earning $73.25 per hour, an average of 5 minutes (0.083 hour) to
prepare a status change report and a mine clerk, earning $25.23 per hour, an average of
10 minutes (0.17 hour) to type and transmit by mail or electronically the report to
MSHA .
Hour Burden
7,140 reports x 0.083 hr.
7,140 reports x 0.17 hr.
Subtotal

=
=
=

593 hrs.
1,214hrs.
1,807 hrs.

Hour Burden Cost
593 hrs. x $73.25
1,214 hrs. x $25.23
Subtotal

=$
=$
=$

43,437
30,629
74,066

30 CFR 71.300: In FY 2008, MSHA issued 16 excessive dust citations under §§ 71.100 or
71.101, which required the operator to either submit a new or revised dust control plan
July 2009
12

1219-0011
following termination of each citation. Since the Agency anticipates issuing annually
approximately the same number of citations as issued in FY 2008, 9 new and 7 revised
dust control plans are expected to be submitted under § 71.300. It will take a mine
supervisor, earning $73.25 per hour, an average of 3 hours to prepare a new dust
control plan and 1.5 hours to revise an existing plan, and a mine clerk, earning $25.23
per hour, an average of 10 minutes (0.17 hour) to copy and transmit by mail or
electronically to MSHA for review and approval.
Hour Burden
9 plans (new) x 3 hrs.
7 plans (revised) x 1.5 hrs.
16 plans x 0.17 hr.
Subtotal

=
=
=
=

27 hrs.
11 hrs.
3 hrs.
41 hrs.

=$
=$
=$
=$

1,978
806
76
2,860

Hour Burden Cost
27 hrs. x $73.25
11 hrs. x $73.25
3 hrs. x $25.23
Subtotal

30 CFR 71.301(d): This standard requires the mine operator to post a copy of the
approved plan on the mine bulletin board. Copying and posting are estimated to take
a mine clerk, earning $25.23 per hour, an average of 15 minutes (0.25 hour).
Hour Burden
16 plans x 0.25 hr.

=

4 hrs.

Hour Burden Cost
4 hrs. x $25.23

=$

101

30 CFR 90.300: Based on the number of citations issued for violation of the applicable
dust standard under §§ 90.100 or 90.101 in FY 2008, MSHA anticipates that in FY 2009
and beyond, operators will submit approximately 2 new and 2 revised dust control
plan under § 90.300. The Agency estimates that it will take a mine supervisor, earning
$73.25 per hour, an average of 3 hours to prepare a new dust control plan and 1.25
hours to revise an existing plan; and a mine clerk, earning $25.23 per hour, an average
of 10 minutes (0.17 hour) to copy and transmit electronically or mail the plan to MSHA
for review and approval.
Hour Burden
July 2009

13

1219-0011
2 plans (new) x 3 hrs.
2 plans (revised) x 1.25 hrs.
4 plans x 0.17 hr.
Subtotal

=
=
=
=

Hour Burden Cost
9 hrs. x $73.25
1 hr. x $25.23
Subtotal

=$
=$
=$

6 hrs.
3 hrs.
1 hr.
10 hrs.
659
26
685

30 CFR 90.301(d): This standard requires the mine operator to provide a copy of the
approved plan to the affected Part 90 miner. MSHA estimates that it will take a mine
clerk, earning $25.23 per hour, an average of 10 minutes (0.17 hour) to copy the plan
and a mine supervisor, earning $73.25 per hour, an average of 15 minutes (0.25 hour) to
provide a copy of the approved plan to the affected Part 90 miner.
Hour Burden
4 plans x 0.17 hr.
4 plans x 0.25 hr.
Subtotal

=
=
=

1 hr.
1 hr.
2 hrs.

Hour Burden Cost
1 hr. x $73.25
1 hr. x $25.23
Subtotal

=$
=$
=$

74
26
100

=
=$

33,199
1,228,825

Total Hour Burden
Total Hour Burden Cost

13.
Provide an estimate of the total annual cost burden to respondents or
recordkeepers resulting from the collection of information. (Do not include the cost
of any hour burden shown in Items 12 and 14.)
•

The cost estimate should be split into two components: (a) a total capital and
start-up cost component (annualized over its expected useful life); and (b) a total
operation and maintenance and purchase of services component. The estimates
should take into account costs associated with generating, maintaining, and
disclosing or providing the information. Include descriptions of methods used
to estimate major cost factors including system and technology acquisition,
expected useful life of capital equipment, the discount rate(s), and the time
period over which costs will be incurred. Capital and start-up costs include,

July 2009

14

1219-0011
among other items, preparations for collecting information such as purchasing
computers and software; monitoring, sampling, drilling and testing equipment;
and record storage facilities.
•

If cost estimates are expected to vary widely, agencies should present ranges of
cost burdens and explain the reasons for the variance. The cost of purchasing or
contracting out information collection services should be a part of this cost
burden estimate. In developing cost burden estimates, agencies may consult
with a sample of respondents (fewer than 10), utilize the 60-day pre-OMB
submission public comment process and use existing economic or regulatory
impact analysis associated with the rulemaking containing the information
collection, as appropriate.

•

Generally, estimates should not include purchases of equipment or services, or
portions thereof, made: (1) prior to October 1, 1995, (2) to achieve regulatory
compliance with requirements not associated with the information collection, (3)
for reasons other than to provide information or keep records for the
government, or (4) as part of customary and usual business or private practices.

Sections 70.204(a), 71.204(a), and 90.204(a), require that approved sampling devices be
maintained as approved under 30 CFR part 74 and calibrated in accordance with
MSHA Informational Report No. 1240.
(a)
The cost to mine operators to obtain the necessary equipment to conduct the
required sampling is estimated (annualized) to be:
27,350 dust cassettes x $19.89 ea.
2,050 pumps x $975 x 0.142(10-yr. life)
3,100 sampling-head assemblies
x $234 ea x 0.381(3-yr. life)
2,050 battery chargers x $80 ea.
x 0.244(5-yr. life)
1,000 spare battery packs x $277 ea.
x 0.381(3-yr. life)
150 fast-response pump calibrators
x $1,403 ea x 0.244(5-yr. life)
Subtotal

=$
=$

543,992
283,823

=$

276,377

=$

40,016

=$

105,537

=$
=$

51,350
1,301,095

(b)
The total annual operational and maintenance and contact services cost is
estimated to be:
July 2009

15

1219-0011
2,050 pumps x $300 for maint & repair
10,850 dust samples x $100 per sample
(collected by operator using equip.
+ cassette supplied by contractor)
2,800 dust samples x $250 per sample
(collected by contractor)
Subtotal

=$

615,000

=$

1,085,000

=$
=$

700,000
2,400,000

Sections 70.204 (b) and (c), 71.204 (b) and (c), and 90.204 (b) and (c) require dust
sampling pumps to be calibrated before they are put into service and at intervals of not
more than 200 hours of operating time thereafter. MSHA estimates that some 2,050
sampling pumps are being used by mine operators today, and approximately one third
or 677 of these will need to be calibrated annually. Approximately 20% of the
calibrations (involving some 135 pumps) will be performed by a certified dust
technician, earning approximately $26.33 per hour, and that each calibration takes
about 35 minutes (0.58 hour) to complete. The remaining 542 dust pumps will be
calibrated by an outside facility.
135 pumps x 0.58 hr. x $26.33
542 pumps x $150 per calibration
Subtotal

=$
=$
=$

2,062
81,300
83,362

The average postage cost for mailing a dust sample along with its data card in the preaddressed mailer is approximately $1.34 per sample.
41,000 samples x $1.34
Subtotal

=$
=$

54,940
54,940

Mailing Costs:
The average postage cost for the operator to report changes in the operations status is
$.44. Approximately 90% of the reports are submitted electronically; the remainder are
mailed.
7,140 reports x 10% (mailed) x $.44

=$

314

The average postage cost for an operator to mail a new or revised plan is $.88.
Approximately 90% of the plans are submitted electronically; the remainder are
mailed.
14 plans x 10% (mailed) x $.88
July 2009

16

=$

1

1219-0011
The average postage cost for the operator to provide a copy of the plan to an affected
Part 90 miner is $.88.
4 plans x 10% (mailed) x $.88
Subtotal
Total annual cost burden

=$

1

=$

316

=$

3,839,714

14.
Provide estimates of annualized cost to the Federal government. Also,
provide a description of the method used to estimate cost, which should include
quantification of hours, operational expenses (such as equipment, overhead,
printing, and support staff), and any other expense that would not have been
incurred without this collection of information. Agencies also may aggregate cost
estimates from Items 12, 13, and 14 in a single table.
MSHA also incurs costs in processing operator samples submitted under 30 CFR parts
70, 71, and 90. These costs are associated with processing of incoming samples
involving sample preparation, weighing, recording the weights on the dust data cards,
and making data entry into electronic data processing systems to record and utilize the
dust sample data.
Upon receiving the operator’s dust sample and the accompanying data card, MSHA’s
Respirable Dust Processing Laboratory in Pittsburgh, PA, prepares each sample
received by weighing it using a robotic weighing system employing micro-balances,
records the results on the data card, and enters the information recorded on the data
card into a personal computer for electronic transmission to the main computer in
Denver, Colorado for processing. There, the transmitted information is processed,
which involves checking the information for accuracy and completeness, performing
the required calculations of average concentration, and producing various computergenerated reports called data mailers. These data mailers, which contain specific
information obtained from the dust data card, are mailed to coal mine operators to
communicate the disposition of each submitted dust sample and any required followup action.
Sample processing and data transmission to main frame:
MSHA personnel cost
Equipment and annual maintenance cost
(vacuum pump, robotic weighing system,
analytical balances, and PCs)
July 2009
17

=$

150,000

=$

20,000

1219-0011
Misc. supplies (labels, paper, etc.)
Subtotal

=$
=$

1,000
171,000

=$
=$

148,212
116,167

=$
=$
=$
=$

4,660
5,950
29,050
304,039

Data processing and reporting of results to mine operators:
MSHA personnel cost
Contractor Staff
Maintenance (Software licensing, printer,
and supplies)
Data mailers (35,000 mailers x $0.17)
Postage (35,000 x $0.83)
Subtotal

30 CFR 70.201(c), 71.201(c), and 90.201(c): MSHA expects to issue some 100 requests for
sampling schedules beginning in FY 2010, and expects to receive approximately 398
responses from mine operators, as some mine operators submit schedules
automatically. It will take an Agency clerk, earning $15.54 per hour (GS-5/7), an
average of 15 minutes (0.25 hour) to type and mail each request, and an average of 10
minutes (0.17 hour) to process each operator response; and an Agency health
supervisor, earning $38.35 per hour (GS 13/5), and average of 15 minutes (0.25 hour) to
review and distribute each response to respective field offices for follow-up action.
Hour Burden
100 requests x 0.25 hr.
398 responses x 0.17 hr.
398 responses x 0.25 hr.
Subtotal

=
=
=
=

Hour Burden Cost
93 hrs. x $15.54
100 hrs. x $38.35
Subtotal

=$
=$
=$

25 hrs.
68 hrs.
100 hrs.
193 hrs.
1,445
3,835
5,280

30 CFR 70.220(a), 71.220(a), and 90.220: These standards require the operator to report
changes in the operational status of any designated sampling entity that affects the
sampling requirements of 30 CFR parts 70, 71, and 90. Such changes must be reported
in writing to the MSHA District Office within 3 working days after the status change
has occurred. MSHA expects to process approximately 7,140 status change reports
annually, beginning in FY 2009. These reports are subsequently reviewed again by
Agency personnel to determine whether to cite a particular operator for failure to
comply with the sampling requirements upon receiving an advisory from Denver
July 2009
18

1219-0011
notifying the responsible MSHA office of an operator’s failure to submit the required
number of respirable dust samples. It will take an Agency clerk, earning $15.54 per
hour, and average of 5 minutes (0.083 hour) to process and file each report.
Hour Burden
7,140 status change reports x 0.083 hr.
Subtotal

=
=

593 hrs.
593 hrs.

Hour Burden Cost
593 hrs. x $15.54
Subtotal

=$
=$

9,215
9,215

30 CFR 71.300: As a result of citations issued for violations of the applicable dust
standard under §§ 71.100 and 71.101, based on MSHA’s experience in FY’08, the
Agency anticipates that mine operators will submit 9 new and 7 revised dust control
plans under § 71.300 annually, beginning with FY’09. It will take an Agency health
supervisor, earning $38.35 per hour, 45 minutes (0.75 hour) to review the average plan
(new) and 30 minutes (0.5 hour) per revision, and an Agency clerk, earning $15.54 per
hour, another 45 minutes (0.75 hour) to process a plan (new or revised).
Hour Burden
9 plans (new) x 0.75 hr.
7 plan (revised) x 0.5 hr.
16 plans x 0.75 hr.
Subtotal

=
=
=
=

7 hrs.
4 hrs.
12 hrs.
23 hrs.

Hour Burden Cost
11 hrs. x $38.35
12 hrs. x $15.54
Subtotal

=$
=$
=$

422
186
608

30 CFR 90.300: As a result of the citations issued for violations of the applicable
respirable dust standard under §§ 90.100 and 90.101, MSHA anticipates the submission
of 2 new and 2 revised respirable dust control plans annually under § 90.300,
beginning in FY’09. It will take an MSHA health supervisor, earning $38.35 per hour,
45 minutes (0.75 hour) to review the average new plan and 30 minutes (0.5) per
revision, and an Agency clerk, earning $15.54 per hour, another 45 minutes (0.75 hour)
to process a Part 90 miner dust control plan (new or revised).
Hour Burden
2 plans (new) x 0.75 hr.
July 2009

=
19

2 hrs.

1219-0011
2 plan (revised) x 0.5 hr.
4 plans x 0.75
Subtotal
Hour Burden Cost
3 hrs. x $38.35
3 hrs. x $15.54
Subtotal
Total Annualized Cost to Federal Government

=
=
=

1 hr.
3 hrs.
6 hrs.

=$
=$
=$

115
47
162

=$

490,304

15.
Explain the reasons for any program changes or adjustments reporting in
Items 13 or 14 of the OMB Form 83-I.
Responses, Respondents: While the overall number of responses (41,000) is expected to
remain fairly steady, MSHA is projecting a decrease in the number of unique
respondents (from 886 to 830) due to the reduction in the less productive and marginal
mining operations as coal prices and exports continue to decline.
Burden hours: The slight increase in burden hours of 324 hours, or one percent, are
higher compared to the previous submission (33, 199 hrs. vs. 32,875 hrs.) due to the
projected increase in the number certifications for dust sampling to more accurately
reflect the number of individuals that were actually certified in the recent past.
Costs: There is an $850,714 increase in costs projected ($3,839,714 vs. $2,989,000).
Although the number of responses is projected to remain unchanged from the previous
submission, the cost of sampling equipment, and related operational, maintenance and
contract services cost have increased substantially since the last submission.
16.
For collections of information whose results will be published, outline
plans for tabulation, and publication. Address any complex analytical
techniques that will be used. Provide the time schedule for the entire project,
including beginning and ending dates of the collection of information,
completion of report, publication dates, and other actions.
The transmittal and processing of dust data cards is not required for publication.
Results are reported back to mine operators and the electronic data base is used by
MSHA to plan enforcement activities and evaluate programs, and by NIOSH to
monitor effectiveness of dust controls, plan and undertake dust control research
initiatives, and assess trends in disease prevention, but the underlying purpose is to
monitor compliance with mandatory exposure limits for respirable coal dust to assure
July 2009

20

1219-0011
healthful work environments. Likewise, information provided by mine operators in
respirable dust control plans is not collected for the purpose of publication.
17.
If seeking approval to not display the expiration date for OMB approval of
the information collection, explain the reasons that display would be inappropriate.
MSHA is seeking approval to not display the expiration date for OMB approval of this
information collection on the dust data card. Dust sampling cassettes and the
accompanying dust data cards are manufactured by the Mine Safety Appliances
Company for sale to coal mine operators. MSHA has no direct control over the
production or distribution of the cassettes and data cards. However, the OMB
approval number , including the expiration date, is published for public viewing on
the OMB’s website, the Federal Regulatory Information page at
http://www.reginfo.gov/public/do/PRAMain Select “Department of Labor” under
the Current Inventory selection box and scroll to the OMB approval number.
18.
Explain each exception to the certification statement identified in Item 19,
"Certification for Paperwork Reduction Act Submission," of OMB 83-I.
There are no certification exceptions identified with this information collection.
B. COLLECTIONS OF INFORMATION EMPLOYING STATISTICAL METHODS
1. Describe (including numerical estimate) the potential respondent universe and
any sampling or other respondent selection method to be used. Data on the number
of entities (e.g., establishments, State and local government units, households, or
persons) in the universe covered by the collection and in the corresponding sample
are to be provided in tabular form for the universe as a whole and for each of the
strata in the proposed sample. Indicate expected response rates for the collection as
a whole. If the collection had been conducted previously, include the actual
response rate achieved during the last collection.
This collection does not employ statistical methods.
2. Describe the procedures for the collection of information including:
.

Statistical methodology for stratification and sample section,

.

Estimation procedure,

July 2009

21

1219-0011

.

Degree of accuracy needed for the purpose described in the justification,

.

Unusual problems requiring specialized sampling procedures, and

.

Any use of periodic (less frequent than annual) data collection cycles to
reduce burden.

3. Describe methods to maximize response rates and to deal with issues of nonresponse. The accuracy and reliability of information collected must be shown to be
adequate for intended uses. For collections based on sampling, a special
justification must be provided for any collection that will not yield "reliable" data
that can be generalized to the universe studied.
4. Describe any tests of procedures or methods to be undertaken. Testing is
encouraged as an effective means of refining collections of information to minimize
burden and improve utility. Tests must be approved if they call for answers to
identical questions from 10 or more respondents. A proposed test or set of tests may
be submitted for approval separately or in combination with the main collection of
information.
5. Provide the name and telephone number of individuals consulted on statistical
aspects of the design and the name of the agency unit, contractor(s), grantee(s), or
other person(s) who will actually collect and/or analyze the information for the
agency.

July 2009

22


File Typeapplication/pdf
File Modified2009-07-16
File Created2009-07-16

© 2024 OMB.report | Privacy Policy