Download:
pdf |
pdfU.S. Department of Energy
Office of Electricity Delivery and
Energy Reliability
Form OE-781R (2010)
PURPOSE
MONTHLY ELECTRICITY IMPORTS AND
EXPORTS REPORT
Form Approved
OMB No. 1901-0296
Approval Expires 12/31/xxxx
Form OE-781R collects international electric export/import data required pursuant to 10 Code of Federal Regulations 205.300-309.
Under those regulations, holders of Export Authorizations (authorizations to export electric energy from the United States to foreign
countries) and Presidential Permits (permits for the construction and operation of electric power transmission lines that cross the U.S.
international border) are required to report monthly the flows of electric energy received or delivered, the cost and revenues
associated with those transactions, related ancillary services, the characteristics of transmission operations, and the current and
proposed capacities of cross-border lines. The data collected on this form may appear in the following Energy Information
Administration (EIA) and Office of Electricity Delivery and Energy Reliability (OE) publications: Electric Power Annual, Annual Energy
Review, Annual Energy Outlook, Electric Power Monthly, and Transactions Across International Borders (OE).
REQUIRED RESPONDENTS
Holders of Export Authorizations and Presidential Permits issued pursuant to 10 CFR section 205.300 and 10 CFR section 205.320
must file the Form OE-781R monthly. Other respondents are entities engaged in international commerce, classified under the
following NERC functional categories: Transmission Operator (TOP), Purchasing and Selling Entity (PSE), and Transmission Owners
(TO).
RESPONSE DUE DATE
Submit the completed Form OE-781R for each month to the EIA no later than the last day of the month following the reporting month.
For example, if reporting data is for June, the survey is due on July 30.
METHODS OF FILING RESPONSE
The method for filing the Form OE-781R is via EIA’s electronic forms (e-filing) system. That system is secure, has built-in edits
to catch errors before the form is submitted to EIA, saves time and effort, and reduces the likelihood of a callback from EIA. If you are
not already validated in the system, log on to http://www.eia.doe.gov/electricity/edc for instructions. If your firm’s activities encompass
multiple NERC functional categories (TSO, PSE, and TO), each group will require a unique validation code to help maintain the
separation of scheduling and marketing information within the firm.
There are other filing options if access to the Internet is not available:
E-mail the form to: [email protected]
Fax the form to: (202) 287-1959 or (202) 287-1960
Mail the form to: U.S. Department of Energy, Energy Information Administration, Mail Stop: BG-076 (Form OE-781R), 1000
Independence Avenue, SW, Washington, DC 20586-0690
Note that commonly used facsimile and e-mail transmissions (including files attached to email messages) travel over ordinary
telephone lines and are not considered secure electronic methods of transmitting survey data. Please retain a copy of your
submission for your files.
CONTACTS
For questions regarding the Form OE-781R or additional information contact:
Processing: Michelle Bowles
Telephone Number: (202) 586-2430
Email: [email protected]
Responsible Office: Steve Mintz
Telephone Number: (202) 586-9506
Email: [email protected]
U.S. Department of Energy
Office of Electricity Delivery and
Energy Reliability
Form OE-781R (2010)
MONTHLY ELECTRICITY
IMPORTS and EXPORTS REPORT
Form Approval
OMB No. 1901-0296
Approval Expires: 12/31/xxxx
SCHEDULE 1. IDENTIFICATION INFORMATION (All Respondents)
NERC Functional Area Categories:
□ Purchasing and Selling Entities □ Transmission Operator □ Transmission Owner
Survey Contact: Persons to contact with questions about this form
First Name: ______________________________________
Last Name: ____________________________________
Title: ___________________________________________
Telephone: ______________________________________
E-mail: ________________________________________
Address: ________________________________________
City: __________________________________________
State: ___________________________________________
Zip: ___________________________________________
Supervisor Contact
First Name: ______________________________________
Last Name: ____________________________________
Title: ___________________________________________
Telephone (include extension): _______________________
E-mail: __________________________________________
Address: ________________________________________
City: __________________________________________
State: ___________________________________________
Zip: ___________________________________________
Company and Federal Licenses
Name of Company: ___________________________________________
Address: ________________________________________
City: __________________________________________
State: ___________________________________________
Zip: ___________________________________________
Presidential Permits (Transmission Owners):
a. ___________________________________________
b. ___________________________________________
Export Authorizations (Purchasing and Selling Entities):
Month:
Year:
a. _ ________________
_______
_______
b. _ ________________
_______
_______
FERC EQR Filer Identification (Purchasing and Selling Entities):
a. _ ________________
b. _ ________________
For questions or additional information about the Form OE-781R, contact the Survey Manager:
Processing:
Regulations:
Name: Michelle Bowles
Telephone: (202) 586-2430
Email: [email protected]
Name: Steven Mintz
Telephone: (202) 586-9506
Email: [email protected]
U.S. Department of Energy
Office of Electricity Delivery and
Energy Reliability
Form OE-781R (2010)
Form Approval
OMB No. 1901-0296
Approval Expires: 12/31/xxxx
Monthly Electricity
Imports and Exports Report
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month/Year: ____________________
SCHEDULE 2A. IMPORTS—CONTRACTS AND FINANCE (Purchasing and Selling Entities)
Imports By Source and
Destination
Scheduled
Imports
(MWh)
Cost-of-Service Transactions
(Payments to Foreign Entities)
Unbundled ($)
Energy
Transmission U.S. Ancillary U.S.
Side
Side
Imports by Route of Entry (Name of Interface) and Delivery Terms
1
Market Rate Transactions
(Payments to Foreign Entities)
Total Payments ($)
Total
Scheduled
Bundled
Imports
Booked
($)
(MWh) Contracted
Out
[ ] Check if Revision Made to Prior Monthly Filing
Delivered
Transmission
U.S. Side
Exchange Imports
Ancillary
U.S. Side
[ ] No activity this month
TSIN Interface Name: A
Hourly:
Less than 1
Year:
Greater:
1 Year or
Other
Interface
2
Total:
TOTAL IMPORTS
Imports Acquired Under Commercial Terms By Fuel Source
[ ] Check if Revision Made to Prior Monthly Filing
[ ] No activity this month
Received from Foreign Sellers, Generated from:
3
System
4
Fossil
5
Hydropower
6
Nuclear
7
Renewable
Imports Acquired Under U.S. Treaties
NonFinancial
8
Columbia River
9
St. Lawrence Seaway
10
Rio Grande
11
Colorado River
12
Other
Financial
Canadian Special
Operations
14
Other
13
[ ] Check if Revision Made to Prior Monthly Filing
[ ] No activity this month
MWh
Total ($)
U.S. Department of Energy
Office of Electricity Delivery and
Energy Reliability
Form OE-781R (2010)
Form Approval
OMB No. 1901-0296
Approval Expires: 12/31/xxxx
Monthly Electricity
Imports and Exports Report
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month/Year: ____________________
SCHEDULE 2B. EXPORTS—CONTRACTS AND FINANCE (Purchasing and Selling Entities)
Exports By Source and
Destination
Cost-of-Service Transactions
(Revenues from Foreign Entities)
Scheduled
Exports
(MWh)
Unbundled ($)
Energy
Transmission
U.S. Side
Exports by Route of Exit (Name of Interface) and Delivery Terms
1
Market Rate Transactions
(Revenues from Foreign Entities)
Ancillary
U.S. Side
Total
Bundled
($)
Scheduled
Exports
Booked
(MWh) Contracted
Out
Delivered
Transmission Ancillary
U.S. Side
U.S. Side
[ ] Check if Revision Made to Prior Monthly Filing
[ ] No activity this month
[ ] Check if Revision Made to Prior Monthly Filing
[ ] No activity this month
TSIN Interface Name: A
Hourly:
Less than 1
Year:
Greater:
1 Year or
Other
Interface
Total:
TSIN Interface Name: B
2
TOTAL EXPORTS
Exports Delivered Under Commercial Terms By Fuel Source
Acquired from U.S. Source, Generated from:
3
System
4
Fossil
5
Hydropower
6
Nuclear
7
Renewable
Exports Delivered under U.S. Treaties
Nonfinancial
8
Columbia River
9
St. Lawrence Seaway
10
Rio Grande
11
Colorado River
12
Other
Financial
13
14
Canadian Special
Operations
Other
[ ] Check if Revision Made to Prior Monthly Filing
Exchange Exports
Total Payments ($)
[ ] No activity this month
MWh
Total ($)
U.S. Department of Energy
Office of Electricity Delivery and
Energy Reliability
Form OE-781R (2010)
Form Approval
OMB No. 1901-0296
Approval Expires: 12/31/xxxx
Monthly Electricity
Imports and Exports Report
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month/Year: ____________________
SCHEDULE 2C. MONTHLY ANCILLARY SERVICES PROVIDED, VALUE OF SERVICES, AND OTHER KEY SYSTEM SUPPORT
(Purchasing and Selling Entities)
TSIN INTERFACE NAME: A
Imported Services – U.S. Side
Costs
Exported Service
Source of Service
3rd Party
Power Supplier (Y/N/U)
1
Total Ancillary Services
2
Real Power Transmission Losses
Source of Service
US Dollars ($)
(Y/N/U)
3rd Party (Y/N/U)
Power Supplier (Y/N/U)
Imported Services – U.S. Side
Exported Services
[ ] Check if No Change Required
[ ] Check if No Change Required
US Dollars ($)
TYPES OF ANCILLARY SERVICES
Source of Services
Source of Services
Services Bundled In
(Check All That Apply)
Power Supplier
rd
3 Party
Services Bundled In
Power Supplier
Power
rd
3 Party
Transmission
Power
Transmission
3
Black Start Service
[]
[]
[]
[]
[]
[]
[]
4
Reactive Supply & Voltage Control
[]
[]
[]
[]
[]
[]
[]
[]
[]
5
Regulation & Frequency Response
[]
[]
[]
[]
[]
[]
[]
[]
6
Schedule System Control & Dispatch
[]
[]
[]
[]
[]
[]
[]
[]
7
Spinning Reserve
[]
[]
[]
[]
[]
[]
[]
[]
8
Supplemental Reserve
[]
[]
[]
[]
[]
[]
[]
[]
Other Key System Support Services
9
Emergency Energy
[]
[]
[]
[]
[]
[]
[]
[]
10
Energy Imbalance
[]
[]
[]
[]
[]
[]
[]
[]
11
Must Run Agreements
[]
[]
[]
[]
[]
[]
[]
[]
U.S. Department of Energy
Office of Electricity Delivery and
Energy Reliability
Form OE-781R (2010)
Form Approval
OMB No. 1901-0296
Approval Expires: 12/31/xxxx
Monthly Electricity
Imports and Exports Report
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month/Year: ____________________
SCHEDULE 3. OPERATION FLOWS—IMPORTS AND EXPORTS (Transmission Operators)
TSIN Interface Name: A
CATEGORY
Scheduled Imports
(MWh)
Firm
NonFirm
Scheduled Exports
(MWh)
Total
1
Total Power Flow for Month
2
Foreign Source and U.S. Destination Combinations – For Individual Balancing Authorities
Source/ U.S. Destination Combo #1
Source/ U.S. Destination Combo #2
Source/ U.S. Destination Combo #3
Source/ U.S. Destination Combo #4
Source/ U.S. Destination Combo #5
3
U.S. Source and Foreign Destination Combinations - For Individual Balancing Authorities
U.S. Source/ Destination Combo #1
U.S. Source/ Destination Combo #2
U.S. Source/ Destination Combo #3
U.S. Source/ Destination Combo #4
U.S. Source/ Destination Combo #5
SCHEDULED IMPORT FUEL SOURCE
Received from Foreign Sources, Generated from:
4
5
6
System
Non System
Received under U.S. Treaty Terms
SCHEDULED EXPORT FUEL SOURCE
Delivered from U.S. Source, Generated from:
7
8
9
System
Non System
Delivered under U.S. Treaty Terms
Firm
NonFirm
Total
Actual
(MWh)
Inadvertent
(MWh)
U.S. Department of Energy
Office of Electricity Delivery and
Energy Reliability
Form OE-781R (2010)
Form Approval
OMB No. 1901-0296
Approval Expires: 12/31/xxxx
Monthly Electricity
Imports and Exports Report
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month/Year: ____________________
SCHEDULE 4. CHARACTERISTICS OF TRANSMISSION OPERATIONS
System Capacity (Transmission Operators)
Measure of Capacity
TSIN Interface Name: A
Imports
TSIN Interface Name: B
Exports
Imports
Thermal Limits at Time of Seasonal Peak (MW)
1
Summer Limit
2
Winter Limit
Total Transfer Capability for Season (TTC)
3
Summer TTC
4
Winter TTC
DOE Operating Requirements
(
Imports
Exports
DOE Presidential Permits (Transmission Owners)
5a Terms of Presidential Permits
exceeded – count
5b
Cite what terms were exceeded.
DOE Export Authorizations (Purchasing and Selling Entities)
6a Terms of Export Authorizations
exceeded – count
6b Cite what terms were exceeded.
Exports
TSIN Interface Name: C
Imports
Exports
U.S. Department of Energy
Office of Electricity Delivery and
Energy Reliability
Form OE-781R (2010)
Form Approval
OMB No. 1901-0296
Approval Expires: 12/31/xxxx
Monthly Electricity
Imports and Exports Report
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month/Year: ____________________
SCHEDULE 5A, EXSTING TRANSMISSION FACILITIES CROSSING BORDERS (Transmission Owners)
Transmission Line (a)
Transmission Line (b)
Transmission Line (c)
1a. Presidential Permit No.
1b. TSIN IDENTIFICATION Number (If known)
2
Terminal Location (From)
3
Terminal Location (To)
4
Utility Name (Owner)
5
EIA Utility ID (Owner)
6
Type of Organization (Owner)
7
Percent Ownership
TRANSMISSION LINE DATA
8
Status of Transmission Facilities
[ ] OP
[ ] NO
9
Line Length (miles)
10 Line Type
[ ] OH
[ ] UG
11 Voltage Type
[ ] AC
[ ] DC
[ ] AB
[ ] SM
[ ] OP
[ ] NO
[ ] OH
[ ] UG
[ ] AC
[ ] DC
[ ] AB
[ ] SM
[ ] OP
[ ] OH
[ ] UG
[ ] AC
[ ] DC
12 Voltage Operating (Kilovolts)
13 Voltage Design (Kilovolts)
14 Conductor Size (MCM)
15 Conductor Material Type
(see list)
(see list)
(see list)
16 Bundling Arrangement
(see list)
(see list)
(see list)
17 Circuits per Structure Present
18 Circuits per Structure Ultimate
19 Pole/Tower Type
20 Capacity Ratings (Megavoltamperes)
(see list)
[ ] NO
(see list)
[ ] AB
[ ] SM
Transm
U.S. Department of Energy
Office of Electricity Delivery and
Energy Reliability
Form OE-781R (2010)
Monthly Electricity
Imports and Exports Report
Form Approval
OMB No. 1901-0296
Approval Expires: 12/31/xxxx
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month/Year: ____________________
Legend
Line Type
OH = Overhead
UG = Underground
SM = Submarine
Voltage Type
AC = Alternating Current
DC = Direct Current
Pole Type
P = Single Pole
H = H Frame
T = Tower
U = Underground
O = Other
Conductor Material Type
AL = Aluminum
ACCR = Aluminum Composite Conductor
ACSR = Aluminum Core Steel Reinforced
Existing Line and Facility Status
OP = Operating
NO = Not Operating
AB = Abandoned
Bundling Arrangement
1 = Single
2 = Double
3 = Triple
4 = Quadruple
5 = Other
U.S. Department of Energy
Office of Electricity Delivery and
Energy Reliability
Form OE-781R (2010)
Form Approval
OMB No. 1901-0296
Approval Expires: 12/31/xxxx
Monthly Electricity
Imports and Exports Report
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month/Year: ____________________
SCHEDULE 5B. PROPOSED TRANSMISSION FACILITIES CROSSING BORDERS (Transmission Owners)
Transmission Line 1.a.
Transmission Line 1.a.
Transmission Line 1.a.
Presidential Permit No. is
Presidential Permit No. is
Presidential Permit No. is
[___________________________]
[___________________________]
[__________________________]
TRANSMISSION LINE IDENTIFICATION
1.b. TSIN IDENTIFICATION Number or Application Name
2
Terminal Location (From)
3
Terminal Location (To)
4
Utility Name
5
EIA Utility ID
6
Type of Organization
7
Percent Ownership
TRANSMISSION LINE DATA
8
Status of Transmission Projects
9
Line Length (miles)
[ ] CN
[ ] CL
10 Line Type
[ ] OH
[ ] UG
11 Voltage Type
[ ] AC
[ ] DC
[ ] CO [ ] PL
[ ] CN
[ ] SM
[ ] CL
[ ] OH
[ ] UG
[ ] AC
[ ] DC
[ ] CO
[ ] PL
[ ] SM
[ ] CN
[ ] CL [ ] CO
[ ] OH
[ ] UG
[ ] AC
[ ] DC
[ ] PL
[ ] SM
12 Voltage Operating (Kilovolts)
13 Voltage Design (Kilovolts)
14 Conductor Size (MCM)
15 Conductor Material Type
(see list)
(see list)
(see list)
16 Bundling Arrangement
(see list)
(see list)
(see list)
17 Circuits per Structure Present
18 Circuits per Structure Ultimate
19 Pole/Tower Type
(see list)
(see list)
20 Capacity Ratings (Megavoltamperes)
21 Projected In Service Date
(mm-yyyy)
22 Upgrade to Existing Line? If “Yes”, Upgrade Capacity
[ ] Yes [ ] No Capacity:
23 Right-of-Way Use: (Check All That Apply)
[ ] New
24 New Facilities: (Check All That Apply)
[ ] Improvement to Grid [ ] Other
[ ] Improvement to Substation
[ ] Existing
(mm-yyyy)
[ ] Yes [ ] No Capacity:
[ ] Unknown
[ ] New
[ ] Existing
(mm-yyyy)
[ ] Yes [ ] No Capacity:
[ ] Unknown
[ ] Improvement to Grid [ ] Other
[ ] Improvement to Substation
[ ] New
[ ] Existing
[ ] Unknown
[ ] Improvement to Grid [ ] Other
[ ] Improvement to Substation
U.S. Department of Energy
Office of Electricity Delivery and
Energy Reliability
Form OE-781R (2010)
Monthly Electricity
Imports and Exports Report
Form Approval
OMB No. 1901-0296
Approval Expires: 12/31/xxxx
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month/Year: ____________________
Legend
Line Type
OH = Overhead
UG = Underground
SM = Submarine
Voltage Type
AC = Alternating Current
DC = Direct Current
Pole Type
P = Single Pole
H = H Frame
T = Tower
U = Underground
O = Other
Conductor Material Type
AL = Aluminum
ACCR = Aluminum Composite Conductor
ACSR = Aluminum Core Steel Reinforced
Project Line and Facility Status
CL = Conceptual
CN = Cancelled
CO = Under Construction
PL = Planned
Bundling Arrangement
1 = Single
2 = Double
3 = Triple
4 = Quadruple
5 = Other
U.S. Department of Energy
Office of Electricity Delivery and
Energy Reliability
Form OE-781R (2010)
Monthly Electricity
Imports and Exports Report
Form Approval
OMB No. 1901-0296
Approval Expires: 12/31/xxxx
Respondent Name: _____________________________________________________________________
Respondent EIA ID: _____________________________
Reporting Month/Year: ____________________
GLOSSARY
Additional terms related to this form are available online at:
www.ferc.gov/docs-filing/eqr/news-help/require-guide.pdf (FERC “Electric Quarterly Report, Filing Requirements Guide”)
www.ferc.gov/docs-filing/eqr/soft-Tools/eqrdatadictionary.pdf (FERC “Electric Quarterly Data Dictionary Version 1.0”)
www.tsin.com/glossary.html (NERC, Archived Glossary of OASIS Terms)
www.nerc.com/files/glossary_12Feb08.pdf (NERC Glossary of Terms used in Reliability Standards)
www.eia.doe.gov/glossary/index.html (EIA, Energy Glossary)
SANCTIONS
The terms and conditions of an electricity export authorization and Presidential permit for the construction, operation, maintenance, and connection of
an international electric transmission facility issued by DOE require the holder of such an authorization or permit to submit the information and data
necessary to complete Form OE-781R in a timely and accurate manner. The timely submission of Form OE-781R by those required to report also is
mandatory under Section 13(b) of the Federal Energy Administration Act of 1974 (FEAA) (Public Law 93-275), as amended.
Failure to respond may result in a penalty of not more than $2,750 per day for each civil violation, or a fine of not more than $5,000 per
day for each criminal violation. The Government may bring a civil action to prohibit reporting violations, which may result in a
temporary restraining order or a preliminary or permanent injunction without bond. In such civil action, the court may also issue
mandatory injunctions commanding any person to comply with these reporting requirements. Title 18 U.S.C. 1001 makes it a criminal
offense for any person knowingly and willingly to make to any Agency or Department of the United States any false, fictitious, or
fraudulent statements as to any matter within its jurisdiction.
Obtaining a valid Order from DOE authorizing the export of electricity under section 202(e) of the Federal Power Act (FPA) is a
necessary condition before engaging in the export. Failure to obtain such an Order, or continuing to export after the expiration of such
an Order, may result in a denial of authorization to export in the future and subject the exporter to sanctions and penalties under the
FPA. Also, a violation of any terms or conditions of the Order authorizing the electricity export, including the failure to submit timely
and accurate reports, may result in the loss of authority to export electricity and subject the holder of such authorization to sanctions
and penalties under the FPA.
REPORTING BURDEN
Public reporting burden for this collection of information is estimated to average 7.8 hours per respondent, including the time for
reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the
collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including
suggestions for reducing this burden to the Energy Information Administration, Statistics and Methods Group, EI-70, 1000
Independence Avenue S.W., Forrestal Building, Washington, D.C. 20585-0670; and to the Office of Information and Regulatory
Affairs, Office of Management and Budget, Washington, D.C. 20503. A person is not required to respond to the collection of
information unless the form displays a valid OMB number.
PROTECTED INFORMATION
Information reported on Form OE-781R will not be treated as confidential and may be publicly released in identifiable form. In addition
to the use of the information by EIA for statistical purposes, the information may be used for any nonstatistical purposes, such as
administrative, regulatory, law enforcement, or adjudicatory purposes by OE.
File Type | application/pdf |
File Title | Form OE-781R |
Author | Makens, John |
File Modified | 2009-06-24 |
File Created | 2009-06-24 |