1801

1801.08 Tables 1 and 2.xls

NESHAP for the Portland Cement Manufacturing Industry (40 CFR part 63, subpart LLL) (Renewal)

1801

OMB: 2060-0416

Document [xlsx]
Download: xlsx | pdf

Overview

Industry
Agency


Sheet 1: Industry

Table 1: Annual Respondent Burden and Cost - NESHAP for Portland Cement (40 CFR Part 63, Subpart LLL)









(Renewal)













REPORTING/RECORDKEEPING REQUIREMENT Hours/ Occurrence Occurrences/Year Hours/Year/
Respondent
Respondents/Year Technical Person Hours Managerial Person Hours Clerical Person Hours Total Costs/Year
(A) (B) (C) (D) (E=CxD) (Ex0.05) (Ex0.10) (F)
1. APPLICATIONS N/A N/A N/A N/A N/A N/A N/A N/A
2. SURVEY AND STUDIES N/A N/A N/A N/A N/A N/A N/A N/A
3. REPORTING REQUIREMENTS








a. Read Instructions 1 1 1 0 0 0 0 $0
b. Required Activities









Initial Performance Tests 57 2 114 2 228 11.4 22.8 $24,659

Repeat of Performance Tests 57 0.1 5.7 0.4 2 0.1 0.2 $247

Periodic Performance Tests 40 1 40 56.4 2,256 113 226 $243,997

Repeat of Performance Tests 40 0.1 4 5.6 22.6 1.1 2.3 $2,440

Initial THC Performance Tests 280 2 560 2 1120 56 112 $121,133

Initial Hg Performance Tests 280 2 560 2 1120 56 112 $121,133

Startup, Shutdown and Malfunction Plan 40 1 40 94 3,760 188 376 $406,661

Operations and Maintenance Plan 40 1 40 94 3,760 188 376 $406,661

Visual Emissions and Opacity Monitoring 0.1 12 1.2 94 112.8 5.64 11.28 $12,200
c. Create Information
--------------------Included in 3b--------------------



d. Gather Existing Information
--------------------Included in 3b--------------------



e. Write Report









Notification of Applicability 2 2 4 2 8 0.4 0.8 $865

Notification of Construction/Reconstruction 2 2 4 2 8 0.4 0.8 $865

Notification of Actual Startup 2 2 4 2 8 0.4 0.8 $865

Request for Extension of Compliance 2 1 2 0 0 0 0 $0

Notification of Special Compliance Requirements 2 1 2 0 0 0 0 $0

Notification of THC Performance Tests 2 2 4 2 8 0 1 $865

Notification of Hg Performance Tests 2 2 4 2 8 0 1 $865

Notification of Performance Test 2 1.1 2.2 56.4 124 6.2 12.4 $13,420

Notification of Opacity and Visible Emissions Observation 2 1 2 56.4 112.8 5.6 11.3 $12,200

Notification of the Continuous Emission Monitor Performance Evaluation 2 2 4 2 8 0.4 0.8 $865

Notification of Compliance Status 2 2 4 2 8 0.4 0.8 $865

Notification of Adjustments to Time Periods or Postmark Deadlines for Submittal and Review of Required Communications 2 1 2 0 0 0 0 $0

Notification of Change in Information Already Provided 2 1 2 0 0 0 0 $0

Report of Initial Performance Tests 8 2 16 2 32 1.6 3.2 $3,461

Report of Periodic Performance Tests 8 1.1 8.8 56.4 496.3 24.8 49.6 $53,679

Opacity and Visible Emissions Observations
--------------------Included in 3b--------------------




Reporting Results of Continuous Monitoring System Performance Report and Summary Report
--------------------Included in 3b--------------------




Progress Reports 8 2 16 0 0 0 0 $0

Excess Emissions and Continuous Monitoring System Performance Report and Summary Report 8 2 16 94 1,504 75.2 150.4 $162,664

Periodic Startup, Shutdown, Malfunction Report
--------------------Included in Excess Emissions Report--------------------


Immediate Startup, Shutdown, Malfunction Reports 4 1 4 5 20 1 2 $2,163.09

Request for Waiver of Reporting and Recordkeeping 4 1 4 0 0 0 0 $0.00




Total Reporting Hours by Labor Category 2,345 117 235


TOTAL REPORTING BURDEN






2,697 Hours $253,644
4. RECORDKEEPING REQUIREMENTS








a. Read Instructions
--------------------Included in 3b--------------------



b. Plan Activities
--------------------Included in 3b--------------------



c. Implement Activities
--------------------Included in 3b--------------------



d. Develop Record System N/A N/A N/A N/A


N/A
e. Time to Enter Information









Records of All Information Required by Standards 0.25 52 13 94 1,222 61.1 122.2 $132,165

Records of Amount of Cement Recycled and Amount Wasted 0.25 365 91.25 94 8,578 428.875 857.75 $927,695
f. Train Personnel N/A N/A N/A N/A


N/A
g. Time for CEM Audits 8 2 16 2 32 1.6 3.2 $3,460.94




Total Recordkeeping Hours by Labor Category 22,213 1,111 2,221


TOTAL RECORDKEEPING BURDEN






25,545 Hours $2,402,451




Total Hours by Labor Category 24,558 1,228 2,456


TOTAL ANNUAL LABOR BURDEN AND COST






28,242 Hours $2,656,095
5. ANNUAL CAPITAL COSTS











a. Annual cost of capital/startup


94


$1,439,200
b. Operation and maintenance






$880,092

TOTAL ANNUAL CAPITAL/STARTUP and O&M COSTS NUAL CA PITAL/STARTUP RTUPand O&M COSTS





$2,319,292














































































Table 1A - Assumptions








Number of affected facilities (per year) 94
Table 1B - Annualized Capital Costs
Number of new sources (per year) 4
Item Capital Cost per Item CRF Annualized Capital Costa Number of Items Total Annualized Capital Cost
Time required to read instructions (hours) 1
Continuous Emission Monitors $220,000 0.1424 $31,323 4 $125,292
Time required to complete performance test (hours) 57
THC Continuous Emission Monitors $139,800 0.1424 $19,904 4 $79,617
Periodic performance test (hours) 40







Performance test reports (hours) 8
a. Annualized Costs: Calculated by multiplying the capital recovery factor (CRF) by the capital cost.
Rate of failed performance tests (repeat) 10%
CRF = (i) x (1 + i)^t/((1 + i)^t - 1) where i = interest rate (%) and t = equipment service life (years).
Periodic performance tests (every five years and every 30 minutes) = 60% 56.4
Interest (%) = 7%



Estimated hours to prepare the Startup/Shutdown/Malfunction 40
Equipment service life (years) = 10



Time required to conduct visual and opacity monitoring 0.1







Estimated number of sources at an affected facility that require visual emissions and opacity 12







Time required to prepare notifications (hours) 2







Time required to prepare progress reports (hours) 8







Time required to prepare excess emissions reports (hours) 8







Time required to prepare immediate startup, shutdown, and malfunction reports (hours) 4







Time required to file information required by standard (hours) 0.25







Technical labor rate $97.59







Managerial labor rate $114.77







Clerical labor rate $48.26







Number of facilities with new kilns (per year)


2







Number of new kilns per plant (per year)


2








Sheet 2: Agency

Table 2: Annual Agency Burden and Cost - NESHAP for Portland Cement (40 CFR Part 63, Subpart LLL)









(RENEWAL)













REPORTING/RECORDKEEPING REQUIREMENT EPA Hours/
Occurrence
Occurrences/Plant/Year EPA Hours/
Year (C=A*B)
Plants/
Year
Technical Person Hours Managerial Person Hours Clerical Person Hours Total Costs/Year
(A) (B) (C) (D) (E=CxD) (Ex0.05) (Ex0.10) (F)
INITIAL PERFORMANCE TESTS








New or Modified Facility


5 2 10 2 20 1 2 $1,021
Repeat of Performance Tests


5 0.1 0.5 0.2 0.1 0.005 0.01 $5
PERIODIC PERFORMANCE TESTS











Existing Facility


5 1 5 56.4 282 14.1 28.2 $14,397
Repeat of Performance Tests


5 0.1 0.5 5.64 2.82 0.141 0.282 $144
REPORT REVIEW












Notification of Applicability 2 2 4 2 8 0.4 0.8 $408

Notification of Construction/Reconstruction 2 2 4 2 8 0.4 0.8 $408

Notification of Actual Startup 2 2 4 2 8 0.4 0.8 $408

Request for Extension of Compliance 2 1 2 0 0 0 0 $0

Notification of Special Compliance Requirements 2 1 2 0 0 0 0 $0

Notification of THC Performance Test 2 2 4 2 8 0.4 0.8 $408

Notification of Hg Performance Test 2 2 4 2 8 0.4 0.8 $408

Notification of Performance Test 2 1.1 2.2 56.4 124.08 6.204 12.41 $6,335

Notification of Opacity and Visible Emissions Observation 2 1 2 56.4 112.8 5.64 11.28 $5,759

Notification of the Continuous Emission Monitor Performance Evaluation 2 2 4 2 8 0.4 0.8 $408

Notification of Compliance Status 2 2 4 2 8 0.4 0.8 $408

Notification of Adjustments to Time Periods or Postmark Deadlines for Submittal and Review of Required Communications 2 1 2 0 0 0 0 $0

Notification of Change in Information Already Provided 2 1 2 0 0 0 0 $0

Review Operations and Maintenance Plan 40 1 40 0 0 0 0 $0

Review Report of Initial Performance Test 5 2 10 2 20 1 2 $1,021

Review Report of Periodic Performance Test 5 1.1 5.5 56.4 310.2 15.51 31.02 $15,836

Review Opacity and Visual Emission Observation Report
--------------Included in Review of Performance Test Report--------------


Review Reporting Results of Continuous Monitoring System Performance Report and Summary Report
--------------Included in Review of Performance Test Report--------------


Review Progress Reports
--------------Included in Review of Performance Test Report--------------


Review Excess Emission Report and Continuous Monitoring System Performance Report and Summary Report 20 2 40 94 3760 188 376 $191,956

Review Periodic Startup, Shutdown, Malfunction Report
---------------------Included in Excess Emission Report----------------------


Review Immediate Startup, Shutdown, Malfunction Report 8 1 8 5 40 2 4 $2,042

Review Request for Waiver of Reporting and Recordkeeping 2 1 2 0 0 0 0 $0
Total Hours by Labor Category






4,728 236 473

TOTAL ANNUAL LABOR BURDEN AND COST




5,437 Hours $241,374
Travel Expenses for Tests Attended (1 person x 4 test site x 2 days/test x $50 per diem + $500/round trip x 4 test site/yr) $2,400
TOTAL ANNUAL COST






$243,774













Assumptions








Number of affected facilities (per year) 94







Number of facilities with new kilns (per year) 2







Number of new kilns per plant (per year) 2







Time required to review notifications (hours) 2







Time required to oversee performance test (hours) 5







Time required to review performance test report (hours) 5







Rate of failed performance tests (repeat) 10%







Periodic performance tests (every five years and every 30 minutes) = 60% 56.4







Estimated number of performance tests per facility 10







Operations and Maintenance Plan (hours) 40







Time required to review Excess Emissions Repot, Continuous Monitoring Reports, and Summary Reports (hours) 20







Estimated number of immediate startup/shutdown/malfunction reports submitted to EPA (per facility) 5







Time required to review the immediate startup/shutdown/malfunction report (hours) 8







Time required to review existing plant emission reports (hours) 4







EPA Managerial Labor rate $61.36







EPA Technical Labor rate $45.52







EPA Clerical Labor rate $24.64







File Typeapplication/vnd.ms-excel
AuthorEastern Research Group
Last Modified Byctsuser
File Modified2010-02-18
File Created2008-08-05