NESHAP for the Portland Cement Manufacturing Industry (40 CFR part 63, subpart LLL) (Renewal)
Extension without change of a currently approved collection
No
Regular
Approved with change
05/06/2025
02/27/2023
The information collection is approved for three years. Upon resubmission, please ensure that the screenshot for the PRA page shows the ICR information for this specific ICR.
table that charts list comparision
Inventory as of this Action
Requested
Previously Approved
05/31/2028
36 Months From Approved
05/31/2025
519
0
212
27,800
0
12,200
10,800,000
0
4,730,000
The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Portland Cement Manufacturing Industry (40 CFR Part 63, Subpart LLL) apply to affected facilities at each new and existing portland cement manufacturing plant that is either a major or area source, including each: kiln including alkali bypasses and inline coal mills; clinker cooler; raw mill; finish mill; raw material dryer; or open clinker storage pile. These regulations apply to each new and existing categories: raw material, clinker or finished product storage bin; conveying system transfer point including those associated with coal preparation used to convey coal from the mill to the kiln; and bagging and bulk loading and unloading system piles located at any portland cement manufacturing plant that is a major source. These regulations do not apply to cement kilns that burn hazardous waste and are subject to 40 CFR Part 63, Subpart EEE, or to cement kilns that burn nonhazardous solid waste and are subject to the requirements of 40 CFR Part 60, Subpart CCCC or 40 CFR Part 60, Subpart DDDD. This information is being collected to assure compliance with 40 CFR Part 63, Subpart LLL.
In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP.
The increase in burden from the most recently approved ICR is due to an adjustment. The adjustment increase in burden from the most-recently approved ICR is due to more accurate estimates of existing and anticipated new sources. More accurate estimates were gathered using the GHG reporting database. The GHG reporting database estimates are also very similar to the portland cement manufacturing 2018 RTR, thus these estimates most accurately represent the industry landscape. There is an increase in costs, which is wholly due to the use of updated labor rates. This ICR uses labor rates from the most recent Bureau of Labor Statistics report (September 2021) to calculate respondent burden costs. Additionally, capital and operation and maintenance costs have increased due to the increase in sources from the most recently approved ICR.
$153,000
No
No
No
No
No
No
No
Muntasir Ali 919 541-0833
Reginfo record details
No
On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control number;
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.