ICR Summary Information | |
Hours per Response | 54 |
Number of Respondents | 91 |
Total Estimated Burden Hours | 27,800 |
Total Estimated Costs | $14,100,000 |
Annualized Capital O&M | $10,800,000 |
Total Annual Responses | 519 |
Form Number | 5900-610 |
Table 1: Annual Respondent Burden and Cost – NESHAP for Portland Cement Manufacturing Industry (40 CFR Part 63, Subpart LLL) (Renewal) | |||||||||||
Burden Item | (A) Hours per Occurrence |
(B) Occurrences/ Respondent/ Year |
(C) Hours/ Respondent/ Year (A x B) |
(D) Respondents/ Yeara |
(E) Technical Hours/Year (C x D) |
(F) Managerial Hours/Year (E x 0.05) |
(G) Clerical Hours/Year (E x 0.10) |
(H) Cost/ Yearb |
|||
1. APPLICATIONS | NA | Labor Rates: | |||||||||
2. SURVEY AND STUDIES | NA | Management | $157.61 | ||||||||
3.ACQUISITION, INSTALLATION, AND UTILIZATION OF TECHNOLOGY AND SYSTEMS | 16 | 1 | 16 | 0 | 0 | 0 | 0 | $0 | Technical | $123.94 | |
4. REPORT REQUIREMENTS | Clerical | $62.52 | |||||||||
A. Familiarize with regulatory requirement | 1 | 1 | 1 | 91 | 91 | 4.55 | 9.1 | $12,564.60 | |||
B. Required Activities | Number of kilns | ||||||||||
New, Reconstructed, Modified Sources - Testing c | New | 0 | |||||||||
Initial PM Performance Test (kiln and cooler) | 24 | 2 | 48 | 9.1 | 437 | 21.84 | 43.68 | $60,310.07 | Reconstructed/modified | 9.1 | |
Repeat PM Performance Test | 24 | 2 | 48 | 0.455 | 22 | 1.092 | 2.184 | $3,015.50 | Existing | 91 | |
Initial D/F Performance Test (kiln) | 8 | 1 | 8 | 9.1 | 73 | 3.64 | 7.28 | $10,051.68 | |||
Repeat D/F Performance Test | 8 | 1 | 8 | 0.455 | 4 | 0.182 | 0.364 | $502.58 | |||
Initial THC/HAP Performance Test (kiln and dryer) | 8 | 2 | 16 | 9.1 | 146 | 7.28 | 14.56 | $20,103.36 | |||
Repeat THC/HAP Performance Test | 8 | 2 | 16 | 0.455 | 7 | 0.364 | 0.728 | $1,005.17 | |||
Initial Hg Performance Test (kiln) | 8 | 1 | 8 | 9.1 | 73 | 3.64 | 7.28 | $10,051.68 | |||
Repeat Hg Performance Test | 8 | 1 | 8 | 0.455 | 4 | 0.182 | 0.364 | $502.58 | |||
Initial HCl Performance Test (Method 321) (kiln) | 8 | 1 | 8 | 9.1 | 73 | 3.64 | 7.28 | $10,051.68 | |||
Repeat HCl Performance Test | 8 | 1 | 8 | 0.455 | 4 | 0.182 | 0.364 | $502.58 | |||
Initial Opacity Performance Test (mills) | 8 | 1 | 8 | 9.1 | 73 | 3.64 | 7.28 | $10,051.68 | |||
Repeat Opacity Performance Test | 8 | 1 | 8 | 0.455 | 4 | 0.182 | 0.364 | $502.58 | |||
Existing Sources - Annual Testing d | |||||||||||
Annual PM Performance Test (kiln and cooler) | 24 | 2 | 48 | 91 | 4,368 | 218.4 | 436.8 | $603,100.68 | |||
Repeat PM Performance Test | 24 | 2 | 48 | 4.55 | 218 | 10.92 | 21.84 | $30,155.03 | |||
Annual Hg Performance Test (kiln) | 8 | 1 | 8 | 91 | 728 | 36.4 | 72.8 | $100,516.78 | |||
Repeat Hg Performance Test | 8 | 1 | 8 | 4.55 | 36 | 1.82 | 3.64 | $5,025.84 | |||
Annual HCl Performance Test (Method 321) (new, modified, reconstructed kilns) | 8 | 1 | 8 | 91 | 728 | 36.4 | 72.8 | $100,516.78 | |||
Repeat HCl Performance Test | 8 | 1 | 8 | 4.55 | 36 | 1.82 | 3.64 | $5,025.84 | |||
New and Existing Sources - Monitoring e | |||||||||||
Daily Calibration Drift Tests - Hg CEMS | 0.3 | 330 | 99 | 91 | 9,009 | 450.45 | 900.9 | $1,243,895.15 | |||
Monthly Opacity Checks (Method 22) (mills) | 0.5 | 12 | 6 | 91 | 546 | 27.3 | 54.6 | $75,387.59 | |||
C. Create Information (Included in 4B) | See 4B | ||||||||||
D. Gather Existing Information (Included in 4E) | See 4E | ||||||||||
E. Write Report | |||||||||||
New, Reconstructed, Modified Sources | |||||||||||
Notification of construction/reconstruction | 2 | 1 | 2 | 9.1 | 18.2 | 0.91 | 1.82 | $2,512.92 | |||
Notification of actual startup | 2 | 1 | 2 | 9.1 | 18.2 | 0.91 | 1.82 | $2,512.92 | |||
Physical or Operational Change | 2 | 1 | 2 | 9.1 | 18.2 | 0.91 | 1.82 | $2,512.92 | |||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 9.1 | 18.2 | 0.91 | 1.82 | $2,512.92 | |||
Notification of Opacity Observations | 2 | 1 | 2 | 9.1 | 18.2 | 0.91 | 1.82 | $2,512.92 | |||
Notification of Initial Performance Test | 2 | 1 | 2 | 9.1 | 18.2 | 0.91 | 1.82 | $2,512.92 | |||
Report of Performance Tests | 2 | 1 | 2 | 9.1 | 18.2 | 0.91 | 1.82 | $2,512.92 | |||
Semi-Annual Reports | 24 | 2 | 48 | 9.1 | 436.8 | 21.84 | 43.68 | $60,310 | |||
Existing Sources | |||||||||||
Notification of Demonstration of CEMS | 2 | 1 | 2 | 91 | 182 | 9.1 | 18.2 | $25,129.20 | |||
Notification of Annual Performance Test | 2 | 1 | 2 | 91 | 182 | 9.1 | 18.2 | $25,129.20 | |||
Report of Annual Performance Test Results | 2 | 1 | 2 | 91 | 182 | 9.1 | 18.2 | $25,129.20 | |||
Semi-Annual Reports | 2 | 2 | 4 | 91 | 364 | 18.2 | 36.4 | $50,258.39 | |||
Subtotal for Reporting Requirements | 20,876 | $2,506,386 | |||||||||
5. RECORDKEEPING REQUIREMENTS | |||||||||||
A. Familiarize with regulatory requirement | See 4A | ||||||||||
B. Plan Activities | See 4B | ||||||||||
C. Implement Activities | See 4B | ||||||||||
D. Record Data | NA | ||||||||||
E. Time to Transmit or Disclose Information | |||||||||||
Existing Sources | |||||||||||
Data Collection | 0.1 | 330 | 33 | 91 | 3,003 | 150.15 | 300.3 | $414,631.72 | |||
Records of Startups, Shutdowns, malfunctions, etc | 0.1 | 330 | 33 | 91 | 3,003 | 150.15 | 300.3 | $414,631.72 | |||
New Sources | |||||||||||
Data Collection | 1.5 | 330 | 495 | 0 | 0 | 0 | 0 | $0 | |||
Records of Startups, Shutdowns, malfunctions, etc | 0.1 | 330 | 33 | 0 | 0 | 0 | 0 | $0 | |||
Coal mill parameter monitoring | 2 | 4 | 8 | 0 | 0 | 0 | 0 | $0 | |||
F. Time to Train Personnel | 80 | 1 | 80 | 0 | 0 | 0 | 0 | $0 | |||
G. Time for Audits | NA | ||||||||||
Subtotal for Recordkeeping Requirements | 6,907 | $829,263 | |||||||||
Total Labor Burden and Cost (rounded) f | 27,800 | $3,340,000 | 54 | hr/response | |||||||
Total Capital and O&M Cost (rounded) f | $10,800,000 | ||||||||||
Grand TOTAL (rounded) f | $14,100,000 | ||||||||||
a We have assumed that there are approximately 91 respondents operating kilns and that 10% of the existing facilities will have new construction/reconstruction. | |||||||||||
b This ICR uses the following labor rates: $157.61 ($75.05 + 110%) per hour for Executive, Administrative, and Managerial labor; $123.94 ($59.02 + 110%) per hour for Technical labor, and $62.52 ($29.77 + 110%) per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, September 2021, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees. | |||||||||||
c New kilns test for PM, D/F, Hg, HCl, and THC or Total Organic HAP. New raw and finish mills test for opacity. New coolers test for PM. New dryers test for THC or Total Organic HAP. All times for testing include calibration of the CEMS, COMS, or CPMS (temperature, pressure drop, air flow rate, sorbent flow rate, activated carbon injection rate) monitors on this equipment. We have assumed that 5 percent of respondents would repeat initial performance test due to failure. | |||||||||||
d The rule requires existing kilns re-test annually for PM and Hg. New kilns and kilns that were modified or reconstructed after the rule was promulgated must also re-test annually for HCl. All times for testing include calibration of the CEMS or CPMS (pressure drop, air flow rate, sorbent flow rate, activated carbon injection rate) monitors on this equipment. We have assumed that 5 percent of respondents would repeat annual performance test due to failure. | |||||||||||
e Opacity checks are required monthly. Calibration drift checks on the air flow sensor on the Hg CEMS are performed daily. | |||||||||||
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Table 2: Average Annual EPA Burden and Cost - NESHAP for Portland Cement Manufacturing Industry (40 CFR Part 63, Subpart LLL) (Renewal) | |||||||||||
Activity | (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) | |||
EPA person- hours per occurrence | No. of occurrences per plant per year | EPA person- hours per plant per year | Plants per year a | Technical person- hours per year | Management person-hours per year | Clerical person-hours per year | Cost, $ b | ||||
(C=AxB) | (E=CxD) | (Ex0.05) | (Ex0.1) | Labor Rates: | |||||||
Initial performance tests c | 24 | 1 | 24 | 9.1 | 218.4 | 10.9 | 21.8 | $12,827.07 | Management | $70.56 | |
Repeat performance test d | 24 | 1 | 24 | 0 | 0 | 0 | 0 | $0 | Technical | $52.37 | |
Report Review | Clerical | $28.34 | |||||||||
Notification of construction | 0.5 | 1 | 0.5 | 9.1 | 4.6 | 0.2 | 0.5 | $267.23 | |||
Notification of actual startup | 0.5 | 1 | 0.5 | 9.1 | 4.6 | 0.2 | 0.5 | $267.23 | |||
Notification of performance test e | 0.5 | 1.1 | 0.55 | 100 | 55.0 | 2.8 | 5.5 | $3,230.26 | |||
Notification of Physical or Operational Change |
0.5 | 1 | 0.5 | 9.1 | 4.6 | 0.2 | 0.5 | $267.23 | |||
Notification of Demonstration of CEMS e | 0.5 | 1 | 0.5 | 100 | 50.0 | 2.5 | 5.0 | $2,936.60 | |||
Notification of Opacity Observations e | 0.5 | 1 | 0.5 | 9.1 | 4.6 | 0.2 | 0.5 | $267.23 | |||
Review test results/CEMS Results e | 8 | 1 | 8 | 100 | 800.0 | 40.00 | 80.00 | $46,985.60 | |||
Review semi-annual summary report f | 8 | 2 | 16 | 91 | 1456 | 72.8 | 145.6 | $85,513.79 | |||
TOTAL (rounded) g | 2,990 | $153,000 | |||||||||
Assumptions: | |||||||||||
a We have assumed that there are approximately 91 respondents with kilns and that 10% of the existing facilities will be reconstructed or modified. | |||||||||||
b This cost is based on the following hourly labor rates: $70.56 (GS-13, Step 5, $44.10 + 60%) for Managerial, $52.37 (GS-12, Step 1, $32.73 + 60%) for Technical, and $28.34 (GS-6, Step 3, $17.71 + 60%) Clerical. These rates are from the Office of Personnel Management (OPM), 2022 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees. | |||||||||||
c We have assumed that EPA personnel will attend the initial performance tests for facilities that are re-constructed or modified, but will not attend the annual performance tests for existing facilities. | |||||||||||
d We have assumed that 5 percent of respondents would repeat performance test due to failure, but that EPA would not attend repeat performance tests. | |||||||||||
e Modified or reconstructed facilities conduct initial testing, and existing facilities (kilns and coolers) conduct annual testing. | |||||||||||
f We have assumed that EPA will review two semiannual reports per year for the 91 respondents. Table 1 accounts for additional burden incurred for semiannual reporting requirements by facilities that are reconstructed or modified. | |||||||||||
g Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Capital/Startup vs. Operation and Maintenance (O&M) Costs | ||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | ||
Continuous Monitoring Device | Capital/Startup Cost for One Respondent | Number of New Respondents | Total Capital/Startup Cost, (B X C) | Annual O&M Costs for One Respondent | Number of Respondents with O&M | Total O&M, (E X F) |
||
Kilns Using CMS for Compliance | ||||||||
Continuous emission monitoring system (CEMS) a | $604,456 | 0 | $0 | $116,459 | 91 | $10,597,769 | ||
Initial CEMS testing b | $131,222 | 0 | $0 | N/A | N/A | N/A | ||
Kilns With Integrated Coal Mills With Stand-Alone Stacks | ||||||||
Flow monitoring device for coal mills c | $35,780 | 0 | $0 | $2,589 | 59 | $152,751 | ||
Coal mill testing | $50,800 | 0 | $0 | $0 | 0 | $0 | ||
Totals (rounded) d | $0 | $10,800,000 | $10,800,000 | |||||
a The annual total capital (including startup) cost for CEMS will be used to monitor THC, Hg, HCl, and PM (plus flow CEMS) is $604,456 per kiln. The annual O&M costs for CEMS for these parameters is $116,459 per kiln per year. These costs are derived from EPA’s CEM.xls spreadsheet, Method 321 costs from EPA, and Hg costs from 69 FR 4694 (January 30, 2004). These costs would apply only to new respondents constructing new kilns. | ||||||||
b It is anticipated that new kilns will use CEMS for compliance with the THC, Hg, HCl (or Method 321 for scrubber-equipped kilns), and PM emission limits. The initial CEMS testing cost is estimated to be $131,222 per kiln, and would only apply to new respondents constructing new kilns. | ||||||||
c An estimated 59 kilns have integrated coal mills with stand-alone stacks. For these kilns, the capital costs are estimated at $35,780 per kiln for purchase and installation of a flow monitoring device, and $50,800 per kiln for HCl, THC, and Hg testing. These costs are only applicable to new respondents constructing new kilns. O&M costs for flow meters is $2,589 per year per facility. These costs are derived from 78 FR 10006 (February 2013). | ||||||||
d Totals have been rounded to 3 significant digits. Figures may not add exactly due to rounding. |
Number of Respondents | |||||
Respondents That Submit Reports | Respondents That Do Not Submit Any Reports | ||||
(A) | (B) | (C) | (D) | (E) | |
Year | Number of New Respondents a | Number of Existing Respondents | Number of Existing Respondents that keep records but do not submit reports | Number of Existing Respondents That Are Also New Respondents | Number of Respondents (E=A+B+C-D) |
1 | 9.1 | 91 | 0 | 9.1 | 91 |
2 | 9.1 | 91 | 0 | 9.1 | 91 |
3 | 9.1 | 91 | 0 | 9.1 | 91 |
Average | 9.1 | 91 | 0 | 9.1 | 91 |
a New respondents include sources with constructed and reconstructed affected facilities. |
Total Annual Responses | ||||
(A) | (B) | (C) | (D) | (E) |
Information Collection Activity | Number of Respondents a | Number of Responses | Number of Existing Respondents That Keep Records But Do Not Submit Reports | Total Annual Responses E=(BxC)+D |
New, Reconstructed, Modified Sources | ||||
Notification of construction/reconstruction a | 9.1 | 1 | 0 | 9.1 |
Notification of actual startup a | 9.1 | 1 | 0 | 9.1 |
Physical or Operational Change a | 9.1 | 1 | 0 | 9.1 |
Notification of Demonstration of CEMS a | 9.1 | 1 | 0 | 9.1 |
Notification of Opacity Observations a | 9.1 | 1 | 0 | 9.1 |
Notification of Initial Performance Test a | 9.1 | 1 | 0 | 9.1 |
Report of Initial Performance Test Results a | 9.1 | 1 | 0 | 9.1 |
Semiannual Reports b | 9.1 | 0 | 0 | 0 |
Existing Sources | ||||
Notification of Demonstration of CEMS | 91 | 1 | 0 | 91 |
Notification of Annual Performance Test | 91 | 1 | 0 | 91 |
Report of Annual Performance Test Results | 91 | 1 | 0 | 91 |
Semiannual Reports | 91 | 2 | 0 | 182 |
Total | 519 | |||
a Approximately 10% of the 91 existing sources (9.1) are expected to undergo construction, reconstruction, or modification of equipment each year, resulting in notifications and reports for testing and evaluation of CEMS/COMS systems. | ||||
b The responses for semiannual reports for modified sources are accounted for in the responses shown for semiannual reports for existing sources. |