Owners or operators of magnetic tape
manufacturing operations must make the following one-time-only
reports: notification of the date of construction or
reconstruction; notification of the anticipated and actual dates of
startup; notification of any physical, or operational change to an
existing facility which may increase the regulated pollutant
emission rate; notification of the date of the initial performance
test; and the results of the initial performance test. Owners, or
operators also are required to maintain records of the occurrence
and duration of any startup, shutdown, or malfunction in the
operation of an affected facility. Each owner, or operator of an
affected magnetic tape coating operation shall install, calibrate,
maintain, and operate a monitoring device that continuously
measures control device efficiency. Recordkeeping requirements
include records of the freeboard ratio, compliance monitoring
system (CMS) maintenance and calibration, performance tests,
material balance calculation, and hazardous air pollutant (HAP)
usage.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.