Sample Renovation Recordkeeping Checklist
Name of Firm:________________________________________________________________
Date and Location of Renovation:_________________________________________________
Brief Description of Renovation: _________________________________________________
____________________________________________________________________________
Name of Assigned Renovator:____________________________________________________
Name(s) of Trained Workers, if used:______________________________________________
____________________________________________________________________________
Name of Dust Sampling Technician, Inspector, or Risk Assessor, if used:__________________
_____________________________________________________________________________
 Copies of renovator and dust sampling technician qualifications (training certificates, certifications) on file.
 Certified renovator provided training to workers on (check all that apply):
 Posting warning signs  Setting up plastic containment barriers
 Maintaining containment  Avoiding spread of dust to adjacent areas
 Waste handling  Post-renovation cleaning
 Test kits used by certified renovator to determine whether lead was present on components affected by renovation (identify kits used and describe sampling locations and results):_____________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
 Warning signs posted at entrance to work area.
 Work area contained to prevent spread of dust and debris
 All objects in the work area removed or covered (interiors)
 HVAC ducts in the work area closed and covered (interiors)
 Windows in the work area closed (interiors)
 Windows in and within 20 feet of the work area closed (exteriors)
 Doors in the work area closed and sealed (interiors)
 Doors in and within 20 feet of the work area closed and sealed (exteriors)
 Doors that must be used in the work area covered to allow passage but prevent spread of dust
 Floors in the work area covered with taped-down plastic (interiors)
 Ground covered by plastic extending 10 feet from work area—plastic anchored to building and weighted down by heavy objects (exteriors)
 If necessary, vertical containment installed to prevent migration of dust and debris to adjacent property (exteriors)
 Waste contained on-site and while being transported off-site
 Work site properly cleaned after renovation
 All chips and debris picked up, protective sheeting misted, folded dirty side inward, and taped for removal
 Work area surfaces and objects cleaned using HEPA vacuum and/or wet cloths or mops (interiors)
 Certified renovator performed post-renovation cleaning verification (describe results, including the number of wet and dry cloths used):________________________________
_______________________________________________________________________________________________________________________________________________
 If dust clearance testing was performed instead, attach a copy of report.
 I certify under penalty of law that the above information is true and complete.
_________________________________________________ ________________________
name and title date
| File Type | application/msword | 
| File Title | Name of Firm:________________________________________________________________ | 
| Author | Cindy Wheeler | 
| Last Modified By | Peter Smith | 
| File Modified | 2009-10-21 | 
| File Created | 2009-10-21 |