0658tables10

0658tables10.xls

NSPS for Pressure Sensitive Tape and Label Surface Coating (40 CFR part 60, subpart RR) (Renewal)

0658tables10

OMB: 2060-0004

Document [xlsx]
Download: xlsx | pdf

Overview

TABLE 1
TABLE 2


Sheet 1: TABLE 1

Table 1:

Annual Respondent Burden and Cost for NSPS for Pressure Sensitive Tape and Label Coating Operations










(40 CFR part 60, subpart RR) (Renewal) (Renewal(






REPORTING/RECORDKEEPING REQUIREMENT (A) Respondent Hours per Occurence (Technical hours) (B) Number of Occurences per Respondent per Year (C) Hours per Respondent per Year (C=A x B) (D) Number of Respondents per Year (E) Technical Hours per Year @ $97.59 (E=C x D) (F) Management Hours per Year @ $114.77 (F= E x 0.05) (G) Clerical Hours per Year @ $48.26 (G= E x 0.1) Total Labor Costs per Year
1. APPLICATIONS


N/A N/A N/A N/A N/A N/A N/A N/A
2. SURVEY AND STUDIES


N/A N/A N/A N/A N/A N/A N/A N/A
3. REPORTING REQUIREMENTS











A. Read Instructionsa

0.87 1 0.87 1 0.87 0.04 0.09 $94.05

B. Required Activities











Initial performance test
52.17 1 52.17 1 52.17 2.61 5.22 $5,642.84


Repeat performance testb
52.17 1 52.17 0.2 10.43 0.52 1.04 $1,128.57

C. Create Information

------------------------Included in 3b----------------------------

D. Gather Existing Information

------------------------Included in 3e----------------------------

E. Write Report











Notification of construction/reconstruction
1.74 1 1.74 1 1.74 0.09 0.17 $188.09


Notification of actual startup
1.74 1 1.74 1 1.74 0.09 0.17 $188.09


Notification of initial performance test
1.74 1 1.74 1 1.74 0.09 0.17 $188.09


Report of performance test
------------------------Included in 3b----------------------------


Excess Emission Reports











VOC Emission Reportsc 4.35 2 8.70 36 313.04 15.65 31.30 $33,857.05



Temperature Reportsd 3.48 2 6.96 29 201.74 10.09 20.17 $21,818.99




Total Reporting Hours by Labor Category 520 26 52

TOTAL REPORTING BURDEN






598 Hours $56,240
4. RECORDKEEPING REQUIREMENTS











A. Read Instructions

------------------------Included in 3a----------------------------

B.  Plan Activities

------------------------Included in 4c----------------------------

C. Implement Activities

------------------------Included in 3b----------------------------


Monthly performance test
0.87 12 10.43 36 375.65 18.78 37.57 $40,628.46

D.  Develop Record System

N/A N/A N/A N/A N/A N/A N/A N/A

E.  Time to Enter Information











Records of operating parameterse
0.22 250 54.35 36 1956.52 97.83 195.65 $211,606.58

F.   Train Personnel

N/A N/A N/A N/A N/A N/A N/A N/A

G.  Audits

N/A N/A N/A N/A N/A N/A N/A N/A




Total Recordkeeping Hours by Labor Category 2,396 120 240

TOTAL RECORDKEEPING BURDEN






2,755 Hours $259,100




Total Hours by Labor Category 2,916 146 292

TOTAL ANNUAL BURDEN






3,353 Hours $315,341















Assumptions:










a. Number of new affected facilities per year: 1










b. Rate of failed performance tests: 20%









c. Each source submits one excess emission report every year, in addition to the required semiannual report.










d. 80% of sources use incineration to control emissions (36x.8 = 29): 29










e. Operating 250 days per year as specified in NSPS review document.











Sheet 2: TABLE 2

Table 2:
Average Annual Agency Burden and Cost for NSPS for Pressure Sensitive Tape and Label Coating Operations









(40 CFR part 60, subpart RR) (Renewal)







REPORTING/RECORDKEEPING REQUIREMENT (A) EPA Hours per Occurence (Technical hours) (B) Number of Occurences per Plant per Year (C) EPA Hours per Year (C=A x B) (D) Plants per Year (E) Technical Hours per Year @ $45.52 (E=C x D) (F) Management Hours per Year @ $61.36 (F= E x 0.05) (G) Clerical Hours per Year @ $24.64 (G= E x 0.1) Costs per Year
INITIAL PERFORMANCE TESTS










New Planta
20.87 1 20.87 1 20.87 1.04 2.09 $1,065.43
REPEAT PERFORMANCE TEST









New Plant
20.87 1 20.87 0.2 4.17 0.21 0.42 $213.09
REPORT REVIEW










New Plant










Notification of construction 1.74 1 1.74 1 1.74 0.09 0.17 $88.79


Notification of initial startup 0.43 1 0.43 1 0.43 0.02 0.04 $22.20


Notification of actual startup 0.43 1 0.43 1 0.43 0.02 0.04 $22.20


Notification of initial performance test 0.43 1 0.43 1 0.43 0.02 0.04 $22.20


Review test results 6.96 1 6.96 1 6.96 0.35 0.70 $355.14

Existing Plant










VOC emission reportsb 1.74 2 3.48 36 125.22 6.26 12.52 $6,392.60


Temperature reportsc 1.74 2 3.48 29 100.87 5.04 10.09 $5,149.59
TOTAL ANNUAL HOURS





261 13 26
SALARY BURDEN (per year)








$11,490.00
ANNUAL TRAVEL EXPENSESd, e











(1 person x 1 plants/year x 3 d/plant x $100 per diem) + ($350 round trip/plant x 1 plant/yr) =






$650.00
TOTAL ANNUAL BURDEN






300 Hours $25,471











Assumptions:




















a.    Number of new plants (per year): 1.









b. Each source submits one excess emission report every year, in addition to the required semiannual report.









c.    80% of sources use incineration (36 x .8 = 29): 29.









d.     Percentage of new plants visited: 100%.









e.    Round trip airfare to visit plant: $350.









File Typeapplication/vnd.ms-excel
AuthorGGibson
Last Modified Byctsuser
File Modified2010-04-02
File Created2009-11-16

© 2024 OMB.report | Privacy Policy