Table 1.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Incinerators |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$100 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
#VALUE! |
$0 |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
0 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$0 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 1.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Incinerators |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
Included in E. |
varies |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
Included in E. |
182 |
$14,533 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
#VALUE! |
$0 |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
0 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$0 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 1.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Incinerators |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
|
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
@$22.32 |
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
#VALUE! |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
0 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$0 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$0 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 2.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Burn-Off Ovens |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$100 |
1 |
1 |
5 |
5 |
0 |
1 |
0 |
$205 |
$500 |
5 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$109,800 |
1 |
#VALUE! |
15 |
#VALUE! |
#VALUE! |
#VALUE! |
1,373 |
$0 |
$1,647,000 |
15 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
5 |
320 |
16 |
32 |
0 |
$13,101 |
$0 |
5 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
5 |
360 |
18 |
36 |
0 |
$14,738 |
$0 |
5 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
15 |
600 |
30 |
60 |
#VALUE! |
$24,564 |
$0 |
15 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$1,267 |
1 |
17 |
15 |
255 |
13 |
26 |
0 |
$10,439 |
$19,000 |
15 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$4,053 |
1 |
17 |
15 |
255 |
13 |
26 |
0 |
$10,439 |
$60,800 |
15 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
15 |
30 |
2 |
3 |
0 |
$1,228 |
$0 |
15 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
15 |
15 |
1 |
2 |
0 |
$614 |
$0 |
15 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
5 |
10 |
1 |
1 |
0 |
$409 |
$0 |
5 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
15 |
120 |
6 |
12 |
0 |
$4,913 |
$113 |
15 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
15 |
30 |
2 |
3 |
0 |
$1,228 |
$0 |
15 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
5 |
800 |
40 |
80 |
0 |
$32,751 |
$0 |
5 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
3 |
18 |
1 |
2 |
0 |
$737 |
$0 |
3 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
2 |
28 |
1 |
3 |
0 |
$1,146 |
$0 |
2 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
5 |
800 |
40 |
80 |
0 |
$32,751 |
$0 |
5 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
1 |
8 |
0 |
1 |
0 |
$328 |
$0 |
1 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
1 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
1 |
24 |
1 |
2 |
0 |
$983 |
$8 |
1 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
159 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
1 |
2 |
0 |
0 |
0 |
$61 |
$0 |
1 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
1 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$1,727,420 |
160 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$1,666,000 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$1,666,500 |
$1,666,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$60,800 |
$60,800 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 2.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Burn-Off Ovens |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$109,800 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
1,373 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
#VALUE! |
15 |
#VALUE! |
#VALUE! |
#VALUE! |
2,725 |
$0 |
$218,000 |
15 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
5 |
60 |
3 |
6 |
0 |
$2,456 |
$0 |
5 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
5 |
40 |
2 |
4 |
0 |
$1,638 |
$0 |
5 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
#VALUE! |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$19,000 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$4,053 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$60,800 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
15 |
600 |
30 |
60 |
0 |
$24,564 |
$113 |
15 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
1 |
8 |
0 |
1 |
0 |
$328 |
$0 |
1 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
1 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
1 |
24 |
1 |
2 |
0 |
$983 |
$8 |
1 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
44 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
1 |
2 |
0 |
0 |
0 |
$61 |
$0 |
1 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
5 |
5 |
0 |
1 |
0 |
$205 |
$0 |
5 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
5 |
5 |
0 |
1 |
0 |
$205 |
$0 |
5 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
5 |
5 |
0 |
1 |
0 |
$205 |
$0 |
5 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
5 |
120 |
6 |
12 |
0 |
$4,913 |
$0 |
5 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
21 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$297,920 |
65 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$297,920 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$19,000 |
$19,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$60,800 |
$60,800 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 2.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Burn-Off Ovens |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$109,800 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
1,373 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
#VALUE! |
15 |
#VALUE! |
#VALUE! |
#VALUE! |
2,725 |
$0 |
$218,000 |
15 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
5 |
60 |
3 |
6 |
0 |
$2,456 |
$0 |
5 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
5 |
40 |
2 |
4 |
0 |
$1,638 |
$0 |
5 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
#VALUE! |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$19,000 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$4,053 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$60,800 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
15 |
600 |
30 |
60 |
0 |
$24,564 |
$113 |
15 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
1 |
8 |
0 |
1 |
0 |
$328 |
$0 |
1 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
1 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
1 |
24 |
1 |
2 |
0 |
$983 |
$8 |
1 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
44 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
1 |
2 |
0 |
0 |
0 |
$61 |
$0 |
1 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
5 |
5 |
0 |
1 |
0 |
$205 |
$0 |
5 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
5 |
5 |
0 |
1 |
0 |
$205 |
$0 |
5 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
5 |
5 |
0 |
1 |
0 |
$205 |
$0 |
5 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
5 |
120 |
6 |
12 |
0 |
$4,913 |
$0 |
5 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
21 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$297,920 |
65 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$297,920 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$19,000 |
$19,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$60,800 |
$60,800 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 3.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Small Remote Incinerators |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$100 |
1 |
1 |
1 |
1 |
0 |
0 |
0 |
$41 |
$100 |
1 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$28,750 |
1 |
#VALUE! |
2 |
#VALUE! |
#VALUE! |
#VALUE! |
359 |
$0 |
$57,500 |
2 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
1 |
64 |
3 |
6 |
0 |
$2,620 |
$0 |
1 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
1 |
72 |
4 |
7 |
0 |
$2,948 |
$0 |
1 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
2 |
80 |
4 |
8 |
#VALUE! |
$3,275 |
$0 |
2 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
2 |
34 |
2 |
3 |
0 |
$1,392 |
$0 |
2 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$0 |
1 |
17 |
2 |
34 |
2 |
3 |
0 |
$1,392 |
$0 |
2 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
2 |
4 |
0 |
0 |
0 |
$164 |
$0 |
2 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
2 |
2 |
0 |
0 |
0 |
$82 |
$0 |
2 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
1 |
2 |
0 |
0 |
0 |
$82 |
$0 |
1 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
2 |
16 |
1 |
2 |
0 |
$655 |
$15 |
2 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
2 |
4 |
0 |
0 |
0 |
$164 |
$0 |
2 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
1 |
160 |
8 |
16 |
0 |
$6,550 |
$0 |
1 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
1 |
14 |
1 |
1 |
0 |
$573 |
$0 |
1 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
1 |
160 |
8 |
16 |
0 |
$6,550 |
$0 |
1 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
1 |
8 |
0 |
1 |
0 |
$328 |
$0 |
1 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
1 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
1 |
24 |
1 |
2 |
0 |
$983 |
$8 |
1 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
27 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
1 |
2 |
0 |
0 |
0 |
$61 |
$0 |
1 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
1 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$57,623 |
28 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$57,500 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$57,600 |
$57,600 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 3.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Small Remote Incinerators |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$28,750 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
359 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
#VALUE! |
2 |
#VALUE! |
#VALUE! |
#VALUE! |
363 |
$0 |
$29,067 |
2 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
1 |
12 |
1 |
1 |
0 |
$491 |
$0 |
1 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
1 |
8 |
0 |
1 |
0 |
$328 |
$0 |
1 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
#VALUE! |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
2 |
80 |
4 |
8 |
0 |
$3,275 |
$15 |
2 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
1 |
8 |
0 |
1 |
0 |
$328 |
$0 |
1 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
1 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
1 |
24 |
1 |
2 |
0 |
$983 |
$8 |
1 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
10 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
1 |
2 |
0 |
0 |
0 |
$61 |
$0 |
1 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
1 |
1 |
0 |
0 |
0 |
$41 |
$0 |
1 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
1 |
1 |
0 |
0 |
0 |
$41 |
$0 |
1 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
1 |
1 |
0 |
0 |
0 |
$41 |
$0 |
1 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
1 |
24 |
1 |
2 |
0 |
$983 |
$0 |
1 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
5 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$29,089 |
15 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$29,089 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 3.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Small Remote Incinerators |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$28,750 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
359 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
182 |
$14,533 |
1 |
#VALUE! |
2 |
#VALUE! |
#VALUE! |
#VALUE! |
363 |
$0 |
$29,067 |
2 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
1 |
12 |
1 |
1 |
0 |
$491 |
$0 |
1 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
1 |
8 |
0 |
1 |
0 |
$328 |
$0 |
1 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
#VALUE! |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
2 |
80 |
4 |
8 |
0 |
$3,275 |
$15 |
2 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
1 |
8 |
0 |
1 |
0 |
$328 |
$0 |
1 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
1 |
16 |
1 |
2 |
0 |
$655 |
$0 |
2 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
1 |
24 |
1 |
2 |
0 |
$983 |
$8 |
1 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
10 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
1 |
2 |
0 |
0 |
0 |
$61 |
$0 |
1 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
1 |
1 |
0 |
0 |
0 |
$41 |
$0 |
1 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
1 |
1 |
0 |
0 |
0 |
$41 |
$0 |
1 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
1 |
1 |
0 |
0 |
0 |
$41 |
$0 |
1 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
1 |
24 |
1 |
2 |
0 |
$983 |
$0 |
1 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
5 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$29,089 |
15 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$29,089 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$0 |
$0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 4.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Energy Recovery Units |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$100 |
1 |
1 |
25 |
25 |
1 |
3 |
0 |
$1,023 |
$2,500 |
25 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$45,917 |
1 |
#VALUE! |
40 |
#VALUE! |
#VALUE! |
#VALUE! |
574 |
$0 |
$1,836,667 |
40 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
632 |
$50,533 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
25 |
1,600 |
80 |
160 |
0 |
$65,503 |
$0 |
25 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
25 |
1,800 |
90 |
180 |
0 |
$73,691 |
$0 |
25 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
40 |
1,600 |
80 |
160 |
#VALUE! |
$65,503 |
$0 |
40 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$25,900 |
1 |
17 |
40 |
680 |
34 |
68 |
0 |
$27,839 |
$1,035,992 |
40 |
f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$77,296 |
1 |
17 |
40 |
680 |
34 |
68 |
0 |
$27,839 |
$3,091,820 |
40 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
40 |
80 |
4 |
8 |
0 |
$3,275 |
$0 |
40 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
40 |
40 |
2 |
4 |
0 |
$1,638 |
$0 |
40 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
25 |
50 |
3 |
5 |
0 |
$2,047 |
$0 |
25 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
40 |
320 |
16 |
32 |
0 |
$13,101 |
$300 |
40 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
40 |
80 |
4 |
8 |
0 |
$3,275 |
$0 |
40 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
25 |
4,000 |
200 |
400 |
0 |
$163,757 |
$0 |
25 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
16 |
96 |
5 |
10 |
0 |
$3,930 |
$0 |
16 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
9 |
126 |
6 |
13 |
0 |
$5,158 |
$0 |
9 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
25 |
4,000 |
200 |
400 |
0 |
$163,757 |
$0 |
25 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
3 |
24 |
1 |
2 |
0 |
$983 |
$0 |
3 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
3 |
48 |
2 |
5 |
0 |
$1,965 |
$0 |
6 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
3 |
72 |
4 |
7 |
0 |
$2,948 |
$23 |
3 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
507 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
3 |
5 |
0 |
0 |
0 |
$184 |
$0 |
3 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
3 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$5,967,301 |
510 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$5,967,301 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$2,875,159 |
$2,875,159 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$3,091,820 |
$3,091,820 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 4.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Energy Recovery Units |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$45,917 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
574 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
632 |
$50,533 |
1 |
#VALUE! |
40 |
#VALUE! |
#VALUE! |
#VALUE! |
25,267 |
$0 |
$2,021,333 |
40 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
25 |
300 |
15 |
30 |
0 |
$12,282 |
$0 |
25 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
25 |
200 |
10 |
20 |
0 |
$8,188 |
$0 |
25 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
#VALUE! |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$1,035,992 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$77,296 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$3,091,820 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
40 |
1,600 |
80 |
160 |
0 |
$65,503 |
$300 |
40 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
3 |
24 |
1 |
2 |
0 |
$983 |
$0 |
3 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
3 |
48 |
2 |
5 |
0 |
$1,965 |
$0 |
6 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
3 |
72 |
4 |
7 |
0 |
$2,948 |
$23 |
3 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
142 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
3 |
5 |
0 |
0 |
0 |
$184 |
$0 |
3 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
25 |
25 |
1 |
3 |
0 |
$1,023 |
$0 |
25 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
25 |
25 |
1 |
3 |
0 |
$1,023 |
$0 |
25 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
25 |
25 |
1 |
3 |
0 |
$1,023 |
$0 |
25 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
25 |
600 |
30 |
60 |
0 |
$24,564 |
$0 |
25 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
103 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$6,149,468 |
245 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$6,149,468 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$1,035,992 |
$1,035,992 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$3,091,820 |
$3,091,820 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 4.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Energy Recovery Units |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$45,917 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
574 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
632 |
$50,533 |
1 |
#VALUE! |
40 |
#VALUE! |
#VALUE! |
#VALUE! |
25,267 |
$0 |
$2,021,333 |
40 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
25 |
300 |
15 |
30 |
0 |
$12,282 |
$0 |
25 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
25 |
200 |
10 |
20 |
0 |
$8,188 |
$0 |
25 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
#VALUE! |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$1,035,992 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$77,296 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$3,091,820 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
40 |
1,600 |
80 |
160 |
0 |
$65,503 |
$300 |
40 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
3 |
24 |
1 |
2 |
0 |
$983 |
$0 |
3 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
3 |
48 |
2 |
5 |
0 |
$1,965 |
$0 |
6 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
3 |
72 |
4 |
7 |
0 |
$2,948 |
$23 |
3 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
142 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
3 |
5 |
0 |
0 |
0 |
$184 |
$0 |
3 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
25 |
25 |
1 |
3 |
0 |
$1,023 |
$0 |
25 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
25 |
25 |
1 |
3 |
0 |
$1,023 |
$0 |
25 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
25 |
25 |
1 |
3 |
0 |
$1,023 |
$0 |
25 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
25 |
600 |
30 |
60 |
0 |
$24,564 |
$0 |
25 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
103 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$6,149,468 |
245 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$6,149,468 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$1,035,992 |
$1,035,992 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$3,091,820 |
$3,091,820 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 5.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Cement Kilns |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$100 |
1 |
1 |
36 |
36 |
2 |
4 |
0 |
$1,474 |
$3,600 |
36 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$32,987 |
1 |
#VALUE! |
53 |
#VALUE! |
#VALUE! |
#VALUE! |
412 |
$0 |
$1,748,333 |
53 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
357 |
$28,533 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
36 |
2,304 |
115 |
230 |
0 |
$94,324 |
$0 |
36 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
36 |
2,592 |
130 |
259 |
0 |
$106,114 |
$0 |
36 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
53 |
2,120 |
106 |
212 |
#VALUE! |
$86,791 |
$0 |
53 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$660 |
1 |
17 |
53 |
901 |
45 |
90 |
0 |
$36,886 |
$35,000 |
53 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$1,830 |
1 |
17 |
53 |
901 |
45 |
90 |
0 |
$36,886 |
$97,000 |
53 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
53 |
106 |
5 |
11 |
0 |
$4,340 |
$0 |
53 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
53 |
53 |
3 |
5 |
0 |
$2,170 |
$0 |
53 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
36 |
72 |
4 |
7 |
0 |
$2,948 |
$0 |
36 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
53 |
424 |
21 |
42 |
0 |
$17,358 |
$398 |
53 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
53 |
106 |
5 |
11 |
0 |
$4,340 |
$0 |
53 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
36 |
5,760 |
288 |
576 |
0 |
$235,810 |
$0 |
36 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
24 |
144 |
7 |
14 |
0 |
$5,895 |
$0 |
24 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
12 |
168 |
8 |
17 |
0 |
$6,878 |
$0 |
12 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
36 |
5,760 |
288 |
576 |
0 |
$235,810 |
$0 |
36 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
4 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
4 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
4 |
64 |
3 |
6 |
0 |
$2,620 |
$0 |
8 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
4 |
96 |
5 |
10 |
0 |
$3,930 |
$30 |
4 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
692 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
4 |
6 |
0 |
1 |
0 |
$246 |
$0 |
4 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
4 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$1,884,361 |
696 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$1,884,361 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$1,786,933 |
$1,786,933 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$97,000 |
$97,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 5.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Cement Kilns |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
@$34.60 |
@$82.23 |
@$22.32 |
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year @$80 |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$32,987 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
412 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
357 |
$28,533 |
1 |
#VALUE! |
53 |
#VALUE! |
#VALUE! |
#VALUE! |
18,903 |
$0 |
$1,512,267 |
53 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
36 |
432 |
22 |
43 |
0 |
$17,686 |
$0 |
36 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
36 |
288 |
14 |
29 |
0 |
$11,790 |
$0 |
36 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
#VALUE! |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$35,000 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$1,830 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$97,000 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
53 |
2,120 |
106 |
212 |
0 |
$86,791 |
$398 |
53 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
4 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
4 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
4 |
64 |
3 |
6 |
0 |
$2,620 |
$0 |
8 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
4 |
96 |
5 |
10 |
0 |
$3,930 |
$30 |
4 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
194 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
4 |
6 |
0 |
1 |
0 |
$246 |
$0 |
4 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
36 |
36 |
2 |
4 |
0 |
$1,474 |
$0 |
36 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
36 |
36 |
2 |
4 |
0 |
$1,474 |
$0 |
36 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
36 |
36 |
2 |
4 |
0 |
$1,474 |
$0 |
36 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
36 |
864 |
43 |
86 |
0 |
$35,371 |
$0 |
36 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
148 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$1,644,694 |
342 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$1,644,694 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$35,000 |
$35,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$97,000 |
$97,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 5.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines |
|
|
for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Cement Kilns |
|
|
|
|
|
|
(A) |
Emission |
|
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
|
|
|
|
|
|
Respondent |
Testing |
Non-Labor |
Number of |
Hours |
Number of |
Technical |
Management |
Clerical |
Emission |
Total |
Total |
Total |
Footnotes |
|
|
|
|
|
|
Hours per |
Contractor |
Costs |
Occurrences |
Per |
Respondents |
Hours |
Hours |
Hours |
Testing |
Labor Costs |
Non-Labor |
Responses |
|
|
|
|
|
|
|
Occurrence |
Hours |
Per |
Per |
Respondent |
Per Year (a) |
Per Year |
Per Year |
Per Year |
Contractor |
Per Year |
Costs |
Per Year |
|
|
|
|
|
|
|
(Technical |
Per |
Occurrence |
Respondent |
Per Year |
|
|
|
|
Hours Per |
(b) |
Per Year |
|
|
|
|
Burden Item |
hours) |
Occurrence |
|
Per Year |
(C=A x B) |
|
(CXD) |
(E x 0.05) |
(E x 0.1) |
Year |
|
|
|
|
|
|
1. |
Applications |
|
|
Not applicable |
|
|
|
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
2. |
Surveys and Studies |
|
|
Not applicable |
|
|
|
#VALUE! |
|
#VALUE! |
#VALUE! |
#VALUE! |
|
#VALUE! |
|
|
|
|
|
3. |
Reporting Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. |
Read and Understand Rule Requirements |
|
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,d,l |
|
|
|
B. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Initial stack test and report (PM, dioxins/furans, |
|
Included in E. |
varies |
$32,987 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
412 |
$0 |
$0 |
0 |
c |
|
|
|
|
opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) |
|
Included in E. |
357 |
$28,533 |
1 |
#VALUE! |
53 |
#VALUE! |
#VALUE! |
#VALUE! |
18,903 |
$0 |
$1,512,267 |
53 |
e |
|
|
|
|
3) |
Operator training and qualification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Establish and teach operator qualification course |
64 |
0 |
$0 |
1 |
64 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
b) Obtain operator qualification |
72 |
0 |
$0 |
1 |
72 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
|
c) Annual refresher course |
12 |
|
$0 |
1 |
12 |
36 |
432 |
22 |
43 |
0 |
$17,686 |
$0 |
36 |
e |
|
|
|
|
|
d) Initial review of site-specific information |
Included in a. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e) Annual review of site-specific information |
8 |
0 |
$0 |
1 |
8 |
36 |
288 |
14 |
29 |
0 |
$11,790 |
$0 |
36 |
e |
|
|
|
|
4) Establish operating parameters (maximum and minimum) |
|
40 |
Included in B.1. |
$0 |
1 |
40 |
0 |
0 |
0 |
0 |
#VALUE! |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
5) Continuous parameter monitoring (including CEMS) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Initial costs |
17 |
0 |
$0 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$35,000 |
0 |
c,f |
|
|
|
|
|
b) Annual costs |
17 |
0 |
$1,830 |
1 |
17 |
0 |
0 |
0 |
0 |
0 |
$0 |
$97,000 |
0 |
e,g |
|
|
|
C. |
Create Information |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. |
Gather Information |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. |
Report Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Notification of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
1 |
0 |
$0 |
1 |
1 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
2) Notification of initial CMS Demonstration |
|
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
3) Report of initial performance test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Pollutants, fugitive ash emissions |
8 |
0 |
$7.50 |
1 |
8 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
|
b) Fugitive Ash Emissions |
2 |
0 |
$0 |
1 |
2 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
|
|
|
|
|
4) Report of initial CMS demonstration |
|
Included in 3.B.5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5) Report prior to construction (includes siting analysis) |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
6) Report prior to initial start-up |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Without site specific parameter petition |
6 |
0 |
$0 |
1 |
6 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
|
b) With site specific parameter petition |
14 |
0 |
$0 |
1 |
14 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c,h |
|
|
|
|
7) Report of initial stack test |
|
Included in 3.B.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8) Report established values for site-specific operating parameters |
|
Included in 3.B |
0 |
$0 |
1 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
c |
|
|
|
|
9) Waste management plan |
|
160 |
0 |
$0 |
1 |
160 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
c |
|
|
|
|
10) Annual Report: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a) Results of performance tests conducted during the year |
40 |
0 |
$7.50 |
1 |
40 |
53 |
2,120 |
106 |
212 |
0 |
$86,791 |
$398 |
53 |
|
|
|
|
|
11) Status report for operators that are off-site for more than 2 weeks |
|
8 |
0 |
$0 |
1 |
8 |
4 |
32 |
2 |
3 |
0 |
$1,310 |
$0 |
4 |
i |
|
|
|
|
12) Corrective action summary for operators that are off-site for more |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
than 2 weeks |
8 |
0 |
$0 |
2 |
16 |
4 |
64 |
3 |
6 |
0 |
$2,620 |
$0 |
8 |
i |
|
|
|
|
13) Semiannual report of emissions/parameter exceedances |
|
24 |
0 |
$7.50 |
1 |
24 |
4 |
96 |
5 |
10 |
0 |
$3,930 |
$30 |
4 |
j |
|
|
ReportingSubtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
|
194 |
|
|
|
4. Recordkeeping Requirements |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A. Read Instructions |
|
|
Inculded in 3.A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
B. Plan Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C. Implement Activities |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
D. Develop Record System |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
E. Record Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1) Records of operating parameters |
|
Included in 3.B.5.b |
0 |
$0 |
52 |
#VALUE! |
0 |
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
0 |
|
|
|
|
|
2) Records of periods for which minimum amount of data on operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
parameters were not obtained |
|
0.5 |
0 |
$0 |
52 |
26 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
3) Records of malfunction of the unit |
|
1.5 |
0 |
$0 |
1 |
1.5 |
0 |
0 |
0 |
0 |
0 |
$0 |
$0 |
0 |
k |
|
|
|
|
4) Records of exceedances of the operating parameters |
|
1.5 |
0 |
$0 |
1 |
1.5 |
4 |
6 |
0 |
1 |
0 |
$246 |
$0 |
4 |
j |
|
|
|
|
5) Records of stack tests |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6) Records of siting analysis |
|
Included in 3.E |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7) Records of persons who have reviewed operating procedures |
|
1 |
0 |
$0 |
1 |
1 |
36 |
36 |
2 |
4 |
0 |
$1,474 |
$0 |
36 |
|
|
|
|
|
8) Records of persons who have completed operator training |
|
1 |
0 |
$0 |
1 |
1 |
36 |
36 |
2 |
4 |
0 |
$1,474 |
$0 |
36 |
|
|
|
|
|
9) Records of persons whe meet operator qualification criteria |
|
1 |
0 |
$0 |
1 |
1 |
36 |
36 |
2 |
4 |
0 |
$1,474 |
$0 |
36 |
|
|
|
|
|
10) Records of monitoring device calibration |
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
11) Records of site-specific documentation |
|
24 |
0 |
$0 |
1 |
24 |
36 |
864 |
43 |
86 |
0 |
$35,371 |
$0 |
36 |
|
|
|
|
F. Personnel Training |
|
|
Included in 3.B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
G. Time for Audits |
|
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Recordkeeping Subtotal |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
0 |
#VALUE! |
$0 |
148 |
|
|
|
TOTAL: |
|
|
|
|
|
|
|
|
|
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
#VALUE! |
$1,644,694 |
342 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total Hours |
Labor |
Non-Labor |
Total |
|
|
|
|
|
|
|
|
|
|
|
|
|
Summary of Respondent Burden |
|
|
#VALUE! |
#VALUE! |
$1,644,694 |
#VALUE! |
|
|
|
|
|
|
|
|
|
|
|
|
|
Annualized Capital and Startup |
|
|
|
|
$35,000 |
$35,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
O & M Summary |
|
|
|
|
$97,000 |
$97,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Based on the total number of existing units expected to continue operating once the guidelines become effective. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
b |
Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Cost incurred by a facility regardless of the number of affected units at the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Annual cost. Annual costs are not incurred until the second year of operation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Based on the sum of the annualized capital costs for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Based on the sum of the calculated annual cost for each monitoring system required for incinerators. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
h |
Assumed that one-third of the facilities will petition for site-specific parameters. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
i |
Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
j |
Assumed that 10 percent of the facilities would have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
k |
Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
l |
Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table 7 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1 |
|
|
|
|
|
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
Burden Item |
Number of Occurrences Per Year |
EPA Hours Per Occurrence |
Tech Hours Per Year (C=AxB) |
Management Hours Per Year (D=Cx0.05) |
Clerical Hours Per Year (E=Cx0.1) |
EPA Cost Per Year (a,b) |
1. |
Applications |
|
|
|
not applicable |
2. |
Read and Understand Rule Requirements |
|
|
|
1 |
c |
16 |
16 |
1 |
2 |
$954 |
3. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
A. |
Observe initial stack tests |
|
|
|
|
|
|
|
|
|
|
|
(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) |
22 |
c,d |
48 |
1056 |
53 |
106 |
$62,988 |
|
B. |
Excess emissions -- Enforcement Activities |
|
|
11 |
f |
24 |
264 |
13 |
26 |
$15,747 |
|
C. |
Create Information |
|
|
not applicable |
|
D. |
Gather Information |
|
|
not applicable |
|
E. |
Report Reviews |
|
|
|
|
|
|
|
|
|
|
|
1) |
Review waste managemant plan and siting analysis |
|
67 |
c |
8 |
536 |
27 |
54 |
$31,971 |
|
|
2) |
Review report submitted prior to initial startup |
|
67 |
c |
2 |
134 |
7 |
13 |
$7,993 |
|
|
3) |
Review initial stack test report |
|
110 |
c |
40 |
4400 |
220 |
440 |
$262,451 |
|
|
4) |
Review annual compliance report |
|
0 |
e |
8 |
0 |
0 |
0 |
$0 |
|
|
5) |
Review semi-annual excess emission and parameter exceedance report |
9 |
f |
16 |
144 |
7 |
14 |
$8,589 |
|
|
6) |
Review status reports and corrective action summary for operators off-site |
18 |
g |
4 |
72 |
4 |
7 |
$4,295 |
|
F. |
Prepare annual summary report |
|
|
1 |
|
200 |
200 |
10 |
20 |
$11,930 |
5. |
Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = |
|
|
|
|
|
$881 |
per trip |
|
|
$19,388 |
|
TOTAL |
|
|
|
|
|
|
6822 |
341 |
682 |
$426,306 |
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52. |
|
|
|
|
|
|
|
|
|
|
|
|
b |
Figures may not add exactly due to rounding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Assumes EPA personnel attend 20 percent of the initial stack tests. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Burden not incurred until second year of operation onward. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Assume that 10 percent of the facilities have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted. |
Table 8 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2 |
|
|
|
|
|
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
Burden Item |
Number of Occurrences Per Year |
EPA Hours Per Occurrence |
Tech Hours Per Year (C=AxB) |
Management Hours Per Year (D=Cx0.05) |
Clerical Hours Per Year (E=Cx0.1) |
EPA Cost Per Year (a,b) |
1. |
Applications |
|
|
|
not applicable |
2. |
Read and Understand Rule Requirements |
|
|
|
0 |
c |
16 |
0 |
0 |
0 |
$0 |
3. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
A. |
|
Observe initial stack tests |
|
|
|
|
|
|
|
|
|
|
|
(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) |
0 |
c,d |
48 |
0 |
0 |
0 |
$0 |
|
B. |
|
Excess emissions -- Enforcement Activities |
|
11 |
f |
24 |
264 |
13 |
26 |
$15,747 |
|
C. |
|
Create Information |
|
not applicable |
|
D. |
|
Gather Information |
|
not applicable |
|
E. |
|
Report Reviews |
|
|
|
|
|
|
|
|
|
|
1) |
Review waste managemant plan and siting analysis |
|
0 |
c |
8 |
0 |
0 |
0 |
$0 |
|
|
2) |
Review report submitted prior to initial startup |
|
0 |
c |
2 |
0 |
0 |
0 |
$0 |
|
|
3) |
Review initial stack test report |
|
0 |
c |
40 |
0 |
0 |
0 |
$0 |
|
|
4) |
Review annual compliance report |
|
110 |
e |
8 |
880 |
44 |
88 |
$52,490 |
|
|
5) |
Review semi-annual excess emission and parameter exceedance report |
9 |
f |
16 |
144 |
7 |
14 |
$8,589 |
|
|
6) |
Review status reports and corrective action summary for operators off-site |
18 |
g |
4 |
72 |
4 |
7 |
$4,295 |
|
F. |
|
Prepare annual summary report |
|
1 |
|
200 |
200 |
10 |
20 |
$11,930 |
5. |
Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = |
|
|
|
|
|
|
per trip |
|
|
$0 |
|
TOTAL |
|
|
|
|
|
|
1560 |
78 |
156 |
$93,051 |
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52. |
|
|
|
|
|
|
|
|
|
|
|
|
b |
Figures may not add exactly due to rounding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Assumes EPA personnel attend 20 percent of the initial stack tests. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Burden not incurred until second year of operation onward. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Assume that 10 percent of the facilities have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
g |
Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted. |
Table 9 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3 |
|
|
|
|
|
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
Burden Item |
Number of Occurrences Per Year |
EPA Hours Per Occurrence |
Tech Hours Per Year (C=AxB) |
Management Hours Per Year (D=Cx0.05) |
Clerical Hours Per Year (E=Cx0.1) |
EPA Cost Per Year (a,b) |
1. |
Applications |
|
|
|
not applicable |
2. |
Read and Understand Rule Requirements |
|
|
|
0 |
c |
16 |
0 |
0 |
0 |
$0 |
3. |
Required Activities |
|
|
|
|
|
|
|
|
|
|
|
A. |
|
Observe initial stack tests |
|
|
|
|
|
|
|
|
|
|
|
(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) |
0 |
c,d |
48 |
0 |
0 |
0 |
$0 |
|
B. |
|
Excess emissions -- Enforcement Activities |
|
11 |
f |
24 |
264 |
13 |
26 |
$15,747 |
|
C. |
|
Create Information |
|
not applicable |
|
D. |
|
Gather Information |
|
not applicable |
|
E. |
|
Report Reviews |
|
|
|
|
|
|
|
|
|
|
1) |
Review waste managemant plan and siting analysis |
0 |
c |
8 |
0 |
0 |
0 |
$0 |
|
|
2) |
Review report submitted prior to initial startup |
0 |
c |
2 |
0 |
0 |
0 |
$0 |
|
|
3) |
Review initial stack test report |
0 |
c |
40 |
0 |
0 |
0 |
$0 |
|
|
4) |
Review annual compliance report |
110 |
e |
8 |
880 |
44 |
88 |
$52,490 |
|
|
5) |
Review semi-annual excess emission and parameter exceedance report |
9 |
f |
16 |
144 |
7 |
14 |
$8,589 |
|
|
6) |
Review status reports and corrective action summary for operators off-site |
18 |
g |
4 |
72 |
4 |
7 |
$4,295 |
|
F. |
|
Prepare annual summary report |
|
1 |
|
200 |
200 |
10 |
20 |
$11,930 |
5. |
Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = |
|
|
|
|
|
|
per trip |
|
|
$0 |
|
TOTAL |
|
|
|
|
|
|
1560 |
78 |
156 |
$93,051 |
|
|
|
|
|
|
|
|
|
|
|
|
FOOTNOTES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
a |
Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52. |
|
|
|
|
|
|
|
|
|
|
|
|
b |
Figures may not add exactly due to rounding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
c |
One-time only costs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
d |
Assumes EPA personnel attend 20 percent of the initial stack tests. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
e |
Burden not incurred until second year of operation onward. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
f |
Assume that 10 percent of the facilities have an exceedance during the year. |
|
|
|
|
|
|
|
|
|
|
|
|
g |
Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted. |