EG_CISWI_Tables

EG_CISWI_Tables.xls

Emission Guidelines for Existing Sources: Commercial and Industrial Solid Waste Incineration (CISWI) Units (40 CFR part 60, subpart DDDD) (Proposed Rule)

EG_CISWI_Tables

OMB: 2060-0664

Document [xlsx]
Download: xlsx | pdf

Overview

COSTTAB_Incinerators Yr 1
COSTTAB_Incinerators Yr 2
COSTTAB_Incinerators Yr 3
COSTTAB_Incinerators Summary
COSTTAB_Burn-off Ovens Yr 1
COSTTAB_Burn-off Ovens Yr 2
COSTTAB_Burn-off Ovens Yr 3
COSTTAB_Burn-off Ovens Summary
COSTTAB_Small Remote Yr 1
COSTTAB_Small Remote Yr 2
COSTTAB_Small Remote Yr 3
COSTTAB_Small Remote Summary
COSTTAB_ERU Yr 1
COSTTAB_ERU Yr 2
COSTTAB_ERU Yr 3
COSTTAB_ERU Summary
COSTTAB_Cement Kilns Yr 1
COSTTAB_Cement Kilns Yr 2
COSTTAB_Cement Kilns Yr 3
COSTTAB_Cement Kilns Summary
RESPONDENTCOST Summary
EPACOST Year 1
EPACOST Year 2
EPACOST Year 3
EPACOST Summary


Sheet 1: COSTTAB_Incinerators Yr 1

Table 1.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Incinerators





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $100 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 $0 $0 0 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 0 0 0 0 0 $0 $0 0 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 0 0 0 0 0 $0 $0 0 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 #VALUE! $0 $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 0 0 0 0 0 $0 $0 0 c,f




b) Annual costs 17 0 $0 1 17 0 0 0 0 0 $0 $0 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 0 0 0 0 0 $0 $0 0



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 0 0 0 0 0 $0 $0 0 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 0 0 0 0 0 $0 $0 0 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 0 0 0 0 0 $0 $0 0 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




8) Records of persons who have completed operator training
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 0 0 0 0 0 $0 $0 0



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $0 0













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $0 #VALUE!












Annualized Capital and Startup

$0 $0












O & M Summary

$0 $0
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 2: COSTTAB_Incinerators Yr 2

Table 1.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Incinerators





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required)) Included in E. varies $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c






















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash) Included in E. 182 $14,533 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 0 0 0 0 0 $0 $0 0 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 0 0 0 0 0 $0 $0 0 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 #VALUE! $0 $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 0 0 0 0 0 $0 $0 0 c,f




b) Annual costs 17 0 $0 1 17 0 0 0 0 0 $0 $0 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 0 0 0 0 0 $0 $0 0



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 0 0 0 0 0 $0 $0 0 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 0 0 0 0 0 $0 $0 0 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 0 0 0 0 0 $0 $0 0 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




8) Records of persons who have completed operator training
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 0 0 0 0 0 $0 $0 0



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $0 0













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $0 #VALUE!












Annualized Capital and Startup

$0 $0












O & M Summary

$0 $0
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 3: COSTTAB_Incinerators Yr 3

Table 1.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Incinerators

























(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year
Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year


@$22.32 Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 $0 $0 0 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 0 0 0 0 0 $0 $0 0 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 0 0 0 0 0 $0 $0 0 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 #VALUE! #VALUE! $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 0 0 0 0 0 $0 $0 0 c,f




b) Annual costs 17 0 $0 1 17 0 0 0 0 0 $0 $0 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 0 0 0 0 0 $0 $0 0



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 0 0 0 0 0 $0 $0 0 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 0 0 0 0 0 $0 $0 0 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 0 0 0 0 0 $0 $0 0 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




8) Records of persons who have completed operator training
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 0 0 0 0 0 $0 $0 0



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $0 0













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $0 #VALUE!












Annualized Capital and Startup

$0 $0












O & M Summary

$0 $0
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 4: COSTTAB_Incinerators Summary

Table 1.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, Incinerators
Year Technical Hours Management Hours Clerical Hours Total Hours Testing Contractor Hoursa Labor Costs Non-Labor (O&M) Costs Total Costs
1 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $0 #VALUE!
2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $0 #VALUE!
3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $0 #VALUE!
Total #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $0 #VALUE!
Average #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $0 #VALUE!









a. Test contractor costs are accounted for in the non-labor category








Sheet 5: COSTTAB_Burn-off Ovens Yr 1

Table 2.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Burn-Off Ovens





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $100 1 1 5 5 0 1 0 $205 $500 5 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $109,800 1 #VALUE! 15 #VALUE! #VALUE! #VALUE! 1,373 $0 $1,647,000 15 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 $0 $0 0 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 5 320 16 32 0 $13,101 $0 5 c




b) Obtain operator qualification 72 0 $0 1 72 5 360 18 36 0 $14,738 $0 5 c




c) Annual refresher course 12
$0 1 12 0 0 0 0 0 $0 $0 0 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 0 0 0 0 0 $0 $0 0 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 15 600 30 60 #VALUE! $24,564 $0 15 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $1,267 1 17 15 255 13 26 0 $10,439 $19,000 15 c,f




b) Annual costs 17 0 $4,053 1 17 15 255 13 26 0 $10,439 $60,800 15 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 15 30 2 3 0 $1,228 $0 15





b) Fugitive Ash Emissions 1 0 $0 1 1 15 15 1 2 0 $614 $0 15




2) Notification of initial CMS Demonstration
2 0 $0 1 2 5 10 1 1 0 $409 $0 5




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 15 120 6 12 0 $4,913 $113 15





b) Fugitive Ash Emissions 2 0 $0 1 2 15 30 2 3 0 $1,228 $0 15




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 5 800 40 80 0 $32,751 $0 5 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 3 18 1 2 0 $737 $0 3 c,h




b) With site specific parameter petition 14 0 $0 1 14 2 28 1 3 0 $1,146 $0 2 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 5 800 40 80 0 $32,751 $0 5 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 0 0 0 0 0 $0 $0 0



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 1 8 0 1 0 $328 $0 1 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 1 16 1 2 0 $655 $0 2 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 1 24 1 2 0 $983 $8 1 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
159


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 1 2 0 0 0 $61 $0 1 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




8) Records of persons who have completed operator training
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 0 0 0 0 0 $0 $0 0



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 1


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $1,727,420 160













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $1,666,000 #VALUE!












Annualized Capital and Startup

$1,666,500 $1,666,500












O & M Summary

$60,800 $60,800
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 6: COSTTAB_Burn-off Ovens Yr 2

Table 2.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Burn-Off Ovens





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $109,800 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 1,373 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 #VALUE! 15 #VALUE! #VALUE! #VALUE! 2,725 $0 $218,000 15 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 5 60 3 6 0 $2,456 $0 5 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 5 40 2 4 0 $1,638 $0 5 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 #VALUE! #VALUE! $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 0 0 0 0 0 $0 $19,000 0 c,f




b) Annual costs 17 0 $4,053 1 17 0 0 0 0 0 $0 $60,800 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 15 600 30 60 0 $24,564 $113 15



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 1 8 0 1 0 $328 $0 1 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 1 16 1 2 0 $655 $0 2 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 1 24 1 2 0 $983 $8 1 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
44


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 1 2 0 0 0 $61 $0 1 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 5 5 0 1 0 $205 $0 5




8) Records of persons who have completed operator training
1 0 $0 1 1 5 5 0 1 0 $205 $0 5




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 5 5 0 1 0 $205 $0 5




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 5 120 6 12 0 $4,913 $0 5



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 21


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $297,920 65













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $297,920 #VALUE!












Annualized Capital and Startup

$19,000 $19,000












O & M Summary

$60,800 $60,800
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 7: COSTTAB_Burn-off Ovens Yr 3

Table 2.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Burn-Off Ovens





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $109,800 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 1,373 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 #VALUE! 15 #VALUE! #VALUE! #VALUE! 2,725 $0 $218,000 15 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 5 60 3 6 0 $2,456 $0 5 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 5 40 2 4 0 $1,638 $0 5 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 #VALUE! #VALUE! $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 0 0 0 0 0 $0 $19,000 0 c,f




b) Annual costs 17 0 $4,053 1 17 0 0 0 0 0 $0 $60,800 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 15 600 30 60 0 $24,564 $113 15



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 1 8 0 1 0 $328 $0 1 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 1 16 1 2 0 $655 $0 2 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 1 24 1 2 0 $983 $8 1 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
44


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 1 2 0 0 0 $61 $0 1 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 5 5 0 1 0 $205 $0 5




8) Records of persons who have completed operator training
1 0 $0 1 1 5 5 0 1 0 $205 $0 5




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 5 5 0 1 0 $205 $0 5




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 5 120 6 12 0 $4,913 $0 5



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 21


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $297,920 65













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $297,920 #VALUE!












Annualized Capital and Startup

$19,000 $19,000












O & M Summary

$60,800 $60,800
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 8: COSTTAB_Burn-off Ovens Summary

Table 2.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, Burn-Off Ovens
Year Technical Hours Management Hours Clerical Hours Total Hours Testing Contractor Hoursa Labor Costs Non-Labor (O&M) Costs Total Costs
1 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $1,727,420 #VALUE!
2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $297,920 #VALUE!
3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $297,920 #VALUE!
Total #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $2,323,260 #VALUE!
Average #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $774,420 #VALUE!









a. Test contractor costs are accounted for in the non-labor category








Sheet 9: COSTTAB_Small Remote Yr 1

Table 3.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Small Remote Incinerators





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $100 1 1 1 1 0 0 0 $41 $100 1 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $28,750 1 #VALUE! 2 #VALUE! #VALUE! #VALUE! 359 $0 $57,500 2 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 $0 $0 0 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 1 64 3 6 0 $2,620 $0 1 c




b) Obtain operator qualification 72 0 $0 1 72 1 72 4 7 0 $2,948 $0 1 c




c) Annual refresher course 12
$0 1 12 0 0 0 0 0 $0 $0 0 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 0 0 0 0 0 $0 $0 0 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 2 80 4 8 #VALUE! $3,275 $0 2 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 2 34 2 3 0 $1,392 $0 2 c,f




b) Annual costs 17 0 $0 1 17 2 34 2 3 0 $1,392 $0 2 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 2 4 0 0 0 $164 $0 2





b) Fugitive Ash Emissions 1 0 $0 1 1 2 2 0 0 0 $82 $0 2




2) Notification of initial CMS Demonstration
2 0 $0 1 2 1 2 0 0 0 $82 $0 1




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 2 16 1 2 0 $655 $15 2





b) Fugitive Ash Emissions 2 0 $0 1 2 2 4 0 0 0 $164 $0 2




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 1 160 8 16 0 $6,550 $0 1 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 1 14 1 1 0 $573 $0 1 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 1 160 8 16 0 $6,550 $0 1 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 0 0 0 0 0 $0 $0 0



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 1 8 0 1 0 $328 $0 1 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 1 16 1 2 0 $655 $0 2 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 1 24 1 2 0 $983 $8 1 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
27


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 1 2 0 0 0 $61 $0 1 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




8) Records of persons who have completed operator training
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 0 0 0 0 0 $0 $0 0



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 1


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $57,623 28













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $57,500 #VALUE!












Annualized Capital and Startup

$57,600 $57,600












O & M Summary

$0 $0
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 10: COSTTAB_Small Remote Yr 2

Table 3.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Small Remote Incinerators

























(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $28,750 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 359 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 #VALUE! 2 #VALUE! #VALUE! #VALUE! 363 $0 $29,067 2 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 1 12 1 1 0 $491 $0 1 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 1 8 0 1 0 $328 $0 1 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 #VALUE! #VALUE! $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 0 0 0 0 0 $0 $0 0 c,f




b) Annual costs 17 0 $0 1 17 0 0 0 0 0 $0 $0 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 2 80 4 8 0 $3,275 $15 2



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 1 8 0 1 0 $328 $0 1 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 1 16 1 2 0 $655 $0 2 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 1 24 1 2 0 $983 $8 1 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 1 2 0 0 0 $61 $0 1 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 1 1 0 0 0 $41 $0 1




8) Records of persons who have completed operator training
1 0 $0 1 1 1 1 0 0 0 $41 $0 1




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 1 1 0 0 0 $41 $0 1




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 1 24 1 2 0 $983 $0 1



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 5


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $29,089 15













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $29,089 #VALUE!












Annualized Capital and Startup

$0 $0












O & M Summary

$0 $0
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 11: COSTTAB_Small Remote Yr 3

Table 3.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Small Remote Incinerators





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $28,750 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 359 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 182 $14,533 1 #VALUE! 2 #VALUE! #VALUE! #VALUE! 363 $0 $29,067 2 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 1 12 1 1 0 $491 $0 1 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 1 8 0 1 0 $328 $0 1 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 #VALUE! #VALUE! $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 0 0 0 0 0 $0 $0 0 c,f




b) Annual costs 17 0 $0 1 17 0 0 0 0 0 $0 $0 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 2 80 4 8 0 $3,275 $15 2



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 1 8 0 1 0 $328 $0 1 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 1 16 1 2 0 $655 $0 2 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 1 24 1 2 0 $983 $8 1 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 1 2 0 0 0 $61 $0 1 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 1 1 0 0 0 $41 $0 1




8) Records of persons who have completed operator training
1 0 $0 1 1 1 1 0 0 0 $41 $0 1




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 1 1 0 0 0 $41 $0 1




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 1 24 1 2 0 $983 $0 1



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 5


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $29,089 15













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $29,089 #VALUE!












Annualized Capital and Startup

$0 $0












O & M Summary

$0 $0
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 12: COSTTAB_Small Remote Summary

Table 3.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, Small Remote Incinerators
Year Technical Hours Management Hours Clerical Hours Total Hours Testing Contractor Hoursa Labor Costs Non-Labor (O&M) Costs Total Costs
1 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $57,623 #VALUE!
2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $29,089 #VALUE!
3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $29,089 #VALUE!
Total #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $115,801 #VALUE!
Average #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $38,600 #VALUE!









a. Test contractor costs are accounted for in the non-labor category








Sheet 13: COSTTAB_ERU Yr 1

Table 4.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Energy Recovery Units





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $100 1 1 25 25 1 3 0 $1,023 $2,500 25 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $45,917 1 #VALUE! 40 #VALUE! #VALUE! #VALUE! 574 $0 $1,836,667 40 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 632 $50,533 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 $0 $0 0 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 25 1,600 80 160 0 $65,503 $0 25 c




b) Obtain operator qualification 72 0 $0 1 72 25 1,800 90 180 0 $73,691 $0 25 c




c) Annual refresher course 12
$0 1 12 0 0 0 0 0 $0 $0 0 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 0 0 0 0 0 $0 $0 0 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 40 1,600 80 160 #VALUE! $65,503 $0 40 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $25,900 1 17 40 680 34 68 0 $27,839 $1,035,992 40 f




b) Annual costs 17 0 $77,296 1 17 40 680 34 68 0 $27,839 $3,091,820 40 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 40 80 4 8 0 $3,275 $0 40





b) Fugitive Ash Emissions 1 0 $0 1 1 40 40 2 4 0 $1,638 $0 40




2) Notification of initial CMS Demonstration
2 0 $0 1 2 25 50 3 5 0 $2,047 $0 25




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 40 320 16 32 0 $13,101 $300 40





b) Fugitive Ash Emissions 2 0 $0 1 2 40 80 4 8 0 $3,275 $0 40




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 25 4,000 200 400 0 $163,757 $0 25 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 16 96 5 10 0 $3,930 $0 16 c,h




b) With site specific parameter petition 14 0 $0 1 14 9 126 6 13 0 $5,158 $0 9 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 25 4,000 200 400 0 $163,757 $0 25 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 0 0 0 0 0 $0 $0 0



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 3 24 1 2 0 $983 $0 3 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 3 48 2 5 0 $1,965 $0 6 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 3 72 4 7 0 $2,948 $23 3 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
507


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 3 5 0 0 0 $184 $0 3 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




8) Records of persons who have completed operator training
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 0 0 0 0 0 $0 $0 0



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 3


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $5,967,301 510













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $5,967,301 #VALUE!












Annualized Capital and Startup

$2,875,159 $2,875,159












O & M Summary

$3,091,820 $3,091,820
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 14: COSTTAB_ERU Yr 2

Table 4.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Energy Recovery Units





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $45,917 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 574 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 632 $50,533 1 #VALUE! 40 #VALUE! #VALUE! #VALUE! 25,267 $0 $2,021,333 40 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 25 300 15 30 0 $12,282 $0 25 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 25 200 10 20 0 $8,188 $0 25 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 #VALUE! #VALUE! $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 0 0 0 0 0 $0 $1,035,992 0 c,f




b) Annual costs 17 0 $77,296 1 17 0 0 0 0 0 $0 $3,091,820 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 40 1,600 80 160 0 $65,503 $300 40



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 3 24 1 2 0 $983 $0 3 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 3 48 2 5 0 $1,965 $0 6 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 3 72 4 7 0 $2,948 $23 3 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
142


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 3 5 0 0 0 $184 $0 3 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 25 25 1 3 0 $1,023 $0 25




8) Records of persons who have completed operator training
1 0 $0 1 1 25 25 1 3 0 $1,023 $0 25




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 25 25 1 3 0 $1,023 $0 25




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 25 600 30 60 0 $24,564 $0 25



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 103


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $6,149,468 245













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $6,149,468 #VALUE!












Annualized Capital and Startup

$1,035,992 $1,035,992












O & M Summary

$3,091,820 $3,091,820
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 15: COSTTAB_ERU Yr 3

Table 4.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Energy Recovery Units

























(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $45,917 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 574 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 632 $50,533 1 #VALUE! 40 #VALUE! #VALUE! #VALUE! 25,267 $0 $2,021,333 40 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 25 300 15 30 0 $12,282 $0 25 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 25 200 10 20 0 $8,188 $0 25 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 #VALUE! #VALUE! $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 0 0 0 0 0 $0 $1,035,992 0 c,f




b) Annual costs 17 0 $77,296 1 17 0 0 0 0 0 $0 $3,091,820 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 40 1,600 80 160 0 $65,503 $300 40



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 3 24 1 2 0 $983 $0 3 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 3 48 2 5 0 $1,965 $0 6 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 3 72 4 7 0 $2,948 $23 3 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
142


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 3 5 0 0 0 $184 $0 3 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 25 25 1 3 0 $1,023 $0 25




8) Records of persons who have completed operator training
1 0 $0 1 1 25 25 1 3 0 $1,023 $0 25




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 25 25 1 3 0 $1,023 $0 25




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 25 600 30 60 0 $24,564 $0 25



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 103


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $6,149,468 245













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $6,149,468 #VALUE!












Annualized Capital and Startup

$1,035,992 $1,035,992












O & M Summary

$3,091,820 $3,091,820
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 16: COSTTAB_ERU Summary

Table 4.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, Energy Recovery Units
Year Technical Hours Management Hours Clerical Hours Total Hours Testing Contractor Hoursa Labor Costs Non-Labor (O&M) Costs Total Costs
1 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $5,967,301 #VALUE!
2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $6,149,468 #VALUE!
3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $6,149,468 #VALUE!
Total #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $18,266,237 #VALUE!
Average #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $6,088,746 #VALUE!









a. Test contractor costs are accounted for in the non-labor category








Sheet 17: COSTTAB_Cement Kilns Yr 1

Table 5.A - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1, Cement Kilns





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $100 1 1 36 36 2 4 0 $1,474 $3,600 36 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $32,987 1 #VALUE! 53 #VALUE! #VALUE! #VALUE! 412 $0 $1,748,333 53 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 357 $28,533 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 $0 $0 0 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 36 2,304 115 230 0 $94,324 $0 36 c




b) Obtain operator qualification 72 0 $0 1 72 36 2,592 130 259 0 $106,114 $0 36 c




c) Annual refresher course 12
$0 1 12 0 0 0 0 0 $0 $0 0 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 0 0 0 0 0 $0 $0 0 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 53 2,120 106 212 #VALUE! $86,791 $0 53 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $660 1 17 53 901 45 90 0 $36,886 $35,000 53 c,f




b) Annual costs 17 0 $1,830 1 17 53 901 45 90 0 $36,886 $97,000 53 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 53 106 5 11 0 $4,340 $0 53





b) Fugitive Ash Emissions 1 0 $0 1 1 53 53 3 5 0 $2,170 $0 53




2) Notification of initial CMS Demonstration
2 0 $0 1 2 36 72 4 7 0 $2,948 $0 36




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 53 424 21 42 0 $17,358 $398 53





b) Fugitive Ash Emissions 2 0 $0 1 2 53 106 5 11 0 $4,340 $0 53




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 36 5,760 288 576 0 $235,810 $0 36 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 24 144 7 14 0 $5,895 $0 24 c,h




b) With site specific parameter petition 14 0 $0 1 14 12 168 8 17 0 $6,878 $0 12 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 36 5,760 288 576 0 $235,810 $0 36 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 0 0 0 0 0 $0 $0 0



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 4 32 2 3 0 $1,310 $0 4 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 4 64 3 6 0 $2,620 $0 8 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 4 96 5 10 0 $3,930 $30 4 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
692


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 4 6 0 1 0 $246 $0 4 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




8) Records of persons who have completed operator training
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 0 0 0 0 0 $0 $0 0




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 0 0 0 0 0 $0 $0 0



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 4


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $1,884,361 696













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $1,884,361 #VALUE!












Annualized Capital and Startup

$1,786,933 $1,786,933












O & M Summary

$97,000 $97,000
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 18: COSTTAB_Cement Kilns Yr 2

Table 5.B - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2, Cement Kilns





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year
@$34.60 @$82.23 @$22.32 Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year @$80





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $32,987 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 412 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 357 $28,533 1 #VALUE! 53 #VALUE! #VALUE! #VALUE! 18,903 $0 $1,512,267 53 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 36 432 22 43 0 $17,686 $0 36 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 36 288 14 29 0 $11,790 $0 36 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 #VALUE! #VALUE! $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 0 0 0 0 0 $0 $35,000 0 c,f




b) Annual costs 17 0 $1,830 1 17 0 0 0 0 0 $0 $97,000 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 53 2,120 106 212 0 $86,791 $398 53



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 4 32 2 3 0 $1,310 $0 4 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 4 64 3 6 0 $2,620 $0 8 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 4 96 5 10 0 $3,930 $30 4 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
194


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 4 6 0 1 0 $246 $0 4 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 36 36 2 4 0 $1,474 $0 36




8) Records of persons who have completed operator training
1 0 $0 1 1 36 36 2 4 0 $1,474 $0 36




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 36 36 2 4 0 $1,474 $0 36




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 36 864 43 86 0 $35,371 $0 36



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 148


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $1,644,694 342













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $1,644,694 #VALUE!












Annualized Capital and Startup

$35,000 $35,000












O & M Summary

$97,000 $97,000
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 19: COSTTAB_Cement Kilns Yr 3

Table 5.C - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines

for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3, Cement Kilns





(A) Emission
(B) (C) (D) (E) (F) (G) (H)









Respondent Testing Non-Labor Number of Hours Number of Technical Management Clerical Emission Total Total Total Footnotes





Hours per Contractor Costs Occurrences Per Respondents Hours Hours Hours Testing Labor Costs Non-Labor Responses






Occurrence Hours Per Per Respondent Per Year (a) Per Year Per Year Per Year Contractor Per Year Costs Per Year






(Technical Per Occurrence Respondent Per Year



Hours Per (b) Per Year



Burden Item hours) Occurrence
Per Year (C=A x B)
(CXD) (E x 0.05) (E x 0.1) Year





1. Applications

Not applicable


#VALUE!










2. Surveys and Studies

Not applicable


#VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE!




3. Reporting Requirements


















A. Read and Understand Rule Requirements
1 0 $0 1 1 0 0 0 0 0 $0 $0 0 c,d,l


B. Required Activities


















1) Initial stack test and report (PM, dioxins/furans,
Included in E. varies $32,987 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 412 $0 $0 0 c



opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2 (as required))


















2) Annual stack test and test report (PM, HCl, Opacity, and Fugitive Ash)
Included in E. 357 $28,533 1 #VALUE! 53 #VALUE! #VALUE! #VALUE! 18,903 $0 $1,512,267 53 e



3) Operator training and qualification


















a) Establish and teach operator qualification course 64 0 $0 1 64 0 0 0 0 0 $0 $0 0 c




b) Obtain operator qualification 72 0 $0 1 72 0 0 0 0 0 $0 $0 0 c




c) Annual refresher course 12
$0 1 12 36 432 22 43 0 $17,686 $0 36 e




d) Initial review of site-specific information Included in a.












e) Annual review of site-specific information 8 0 $0 1 8 36 288 14 29 0 $11,790 $0 36 e



4) Establish operating parameters (maximum and minimum)
40 Included in B.1. $0 1 40 0 0 0 0 #VALUE! #VALUE! $0 0 c



5) Continuous parameter monitoring (including CEMS)



















a) Initial costs 17 0 $0 1 17 0 0 0 0 0 $0 $35,000 0 c,f




b) Annual costs 17 0 $1,830 1 17 0 0 0 0 0 $0 $97,000 0 e,g


C. Create Information
Included in 3.B















D. Gather Information
Included in 3.E















E. Report Preparation


















1) Notification of initial performance test



















a) Pollutants, fugitive ash emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 1 0 $0 1 1 0 0 0 0 0 $0 $0 0




2) Notification of initial CMS Demonstration
2 0 $0 1 2 0 0 0 0 0 $0 $0 0




3) Report of initial performance test



















a) Pollutants, fugitive ash emissions 8 0 $7.50 1 8 0 0 0 0 0 $0 $0 0





b) Fugitive Ash Emissions 2 0 $0 1 2 0 0 0 0 0 $0 $0 0




4) Report of initial CMS demonstration
Included in 3.B.5
















5) Report prior to construction (includes siting analysis)
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



6) Report prior to initial start-up






a) Without site specific parameter petition 6 0 $0 1 6 0 0 0 0 0 $0 $0 0 c,h




b) With site specific parameter petition 14 0 $0 1 14 0 0 0 0 0 $0 $0 0 c,h



7) Report of initial stack test
Included in 3.B.1




8) Report established values for site-specific operating parameters
Included in 3.B 0 $0 1 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0 c



9) Waste management plan
160 0 $0 1 160 0 0 0 0 0 $0 $0 0 c



10) Annual Report:


















a) Results of performance tests conducted during the year 40 0 $7.50 1 40 53 2,120 106 212 0 $86,791 $398 53



11) Status report for operators that are off-site for more than 2 weeks
8 0 $0 1 8 4 32 2 3 0 $1,310 $0 4 i



12) Corrective action summary for operators that are off-site for more



















than 2 weeks 8 0 $0 2 16 4 64 3 6 0 $2,620 $0 8 i



13) Semiannual report of emissions/parameter exceedances
24 0 $7.50 1 24 4 96 5 10 0 $3,930 $30 4 j

ReportingSubtotal








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
194


4. Recordkeeping Requirements







A. Read Instructions

Inculded in 3.A




B. Plan Activities

Not applicable



C. Implement Activities

Not applicable















D. Develop Record System

Not applicable















E. Record Information



















1) Records of operating parameters
Included in 3.B.5.b 0 $0 52 #VALUE! 0 #VALUE! #VALUE! #VALUE! 0 #VALUE! $0 0




2) Records of periods for which minimum amount of data on operating






parameters were not obtained
0.5 0 $0 52 26 0 0 0 0 0 $0 $0 0 k



3) Records of malfunction of the unit
1.5 0 $0 1 1.5 0 0 0 0 0 $0 $0 0 k



4) Records of exceedances of the operating parameters
1.5 0 $0 1 1.5 4 6 0 1 0 $246 $0 4 j



5) Records of stack tests
Included in 3.E
















6) Records of siting analysis
Included in 3.E
















7) Records of persons who have reviewed operating procedures
1 0 $0 1 1 36 36 2 4 0 $1,474 $0 36




8) Records of persons who have completed operator training
1 0 $0 1 1 36 36 2 4 0 $1,474 $0 36




9) Records of persons whe meet operator qualification criteria
1 0 $0 1 1 36 36 2 4 0 $1,474 $0 36




10) Records of monitoring device calibration
Included in 3.B





11) Records of site-specific documentation
24 0 $0 1 24 36 864 43 86 0 $35,371 $0 36



F. Personnel Training

Included in 3.B












G. Time for Audits

Not applicable














Recordkeeping Subtotal








#VALUE! #VALUE! #VALUE! 0 #VALUE! $0 148


TOTAL:








#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $1,644,694 342













Total Hours Labor Non-Labor Total












Summary of Respondent Burden

#VALUE! #VALUE! $1,644,694 #VALUE!












Annualized Capital and Startup

$35,000 $35,000












O & M Summary

$97,000 $97,000
























FOOTNOTES


















a Based on the total number of existing units expected to continue operating once the guidelines become effective.

















b Costs are based on the following hourly rates: technical at $34.60, management at $82.23, clerical at $22.32, and testing contractor at $80.

















c One-time only costs.

















d Cost incurred by a facility regardless of the number of affected units at the plant.

















e Annual cost. Annual costs are not incurred until the second year of operation.

















f Based on the sum of the annualized capital costs for each monitoring system required for incinerators.

















g Based on the sum of the calculated annual cost for each monitoring system required for incinerators.

















h Assumed that one-third of the facilities will petition for site-specific parameters.

















i Assumed that 10 percent of the facilities would not have a qualified operator available for more than two weeks at least once a year. Assumed that this required only two corrective action summaries.

















j Assumed that 10 percent of the facilities would have an exceedance during the year.

















k Standards apply at all times under the newly proposed regulation. Therefore no periods of unobtained data or malfunction periods are expected.

















l Assumed $100 for puchase of filing cabinet to house copy of rule, records and report copies.


















Sheet 20: COSTTAB_Cement Kilns Summary

Table 5.D - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, Cement Kilns
Year Technical Hours Management Hours Clerical Hours Total Hours Testing Contractor Hoursa Labor Costs Non-Labor (O&M) Costs Total Costs
1 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $1,884,361 #VALUE!
2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $1,644,694 #VALUE!
3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $1,644,694 #VALUE!
Total #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $5,173,749 #VALUE!
Average #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $1,724,583 #VALUE!









a. Test contractor costs are accounted for in the non-labor category








Sheet 21: RESPONDENTCOST Summary

Table 6 - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Emissions Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD, All Subcategories
Year Technical Hours Management Hours Clerical Hours Total Labor Hours Testing Contractor Hoursa Labor Costs Non-Labor (O&M) Costs Total Costs
1 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $9,636,705 #VALUE!
2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $8,121,171 #VALUE!
3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $8,121,171 #VALUE!
Total #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $25,879,047 #VALUE!
Average #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! $8,626,349 #VALUE!









a. Test contractor costs are accounted for in the non-labor category








Sheet 22: EPACOST Year 1

Table 7 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 1





(A) (B) (C) (D) (E) (F)
Burden Item Number of Occurrences Per Year EPA Hours Per Occurrence Tech Hours Per Year (C=AxB) Management Hours Per Year (D=Cx0.05) Clerical Hours Per Year (E=Cx0.1) EPA Cost Per Year (a,b)
1. Applications


not applicable
2. Read and Understand Rule Requirements


1 c 16 16 1 2 $954
3. Required Activities










A. Observe initial stack tests










(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) 22 c,d 48 1056 53 106 $62,988

B. Excess emissions -- Enforcement Activities

11 f 24 264 13 26 $15,747

C. Create Information

not applicable

D. Gather Information

not applicable

E. Report Reviews










1) Review waste managemant plan and siting analysis
67 c 8 536 27 54 $31,971


2) Review report submitted prior to initial startup
67 c 2 134 7 13 $7,993


3) Review initial stack test report
110 c 40 4400 220 440 $262,451


4) Review annual compliance report
0 e 8 0 0 0 $0


5) Review semi-annual excess emission and parameter exceedance report 9 f 16 144 7 14 $8,589


6) Review status reports and corrective action summary for operators off-site 18 g 4 72 4 7 $4,295

F. Prepare annual summary report

1 200 200 10 20 $11,930
5. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =




$881 per trip

$19,388

TOTAL





6822 341 682 $426,306












FOOTNOTES






















a Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52.












b Figures may not add exactly due to rounding.




















c One-time only costs.





















d Assumes EPA personnel attend 20 percent of the initial stack tests.





















e Burden not incurred until second year of operation onward.





















f Assume that 10 percent of the facilities have an exceedance during the year.





















g Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted.

Sheet 23: EPACOST Year 2

Table 8 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 2





(A) (B) (C) (D) (E) (F)
Burden Item Number of Occurrences Per Year EPA Hours Per Occurrence Tech Hours Per Year (C=AxB) Management Hours Per Year (D=Cx0.05) Clerical Hours Per Year (E=Cx0.1) EPA Cost Per Year (a,b)
1. Applications


not applicable
2. Read and Understand Rule Requirements


0 c 16 0 0 0 $0
3. Required Activities










A.
Observe initial stack tests










(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) 0 c,d 48 0 0 0 $0

B.
Excess emissions -- Enforcement Activities
11 f 24 264 13 26 $15,747

C.
Create Information
not applicable

D.
Gather Information
not applicable

E.
Report Reviews









1) Review waste managemant plan and siting analysis
0 c 8 0 0 0 $0


2) Review report submitted prior to initial startup
0 c 2 0 0 0 $0


3) Review initial stack test report
0 c 40 0 0 0 $0


4) Review annual compliance report
110 e 8 880 44 88 $52,490


5) Review semi-annual excess emission and parameter exceedance report 9 f 16 144 7 14 $8,589


6) Review status reports and corrective action summary for operators off-site 18 g 4 72 4 7 $4,295

F.
Prepare annual summary report
1 200 200 10 20 $11,930
5. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =





per trip

$0

TOTAL





1560 78 156 $93,051












FOOTNOTES






















a Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52.












b Figures may not add exactly due to rounding.





















c One-time only costs.





















d Assumes EPA personnel attend 20 percent of the initial stack tests.





















e Burden not incurred until second year of operation onward.





















f Assume that 10 percent of the facilities have an exceedance during the year.





















g Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted.

Sheet 24: EPACOST Year 3

Table 9 - Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD - Year 3





(A) (B) (C) (D) (E) (F)
Burden Item Number of Occurrences Per Year EPA Hours Per Occurrence Tech Hours Per Year (C=AxB) Management Hours Per Year (D=Cx0.05) Clerical Hours Per Year (E=Cx0.1) EPA Cost Per Year (a,b)
1. Applications


not applicable
2. Read and Understand Rule Requirements


0 c 16 0 0 0 $0
3. Required Activities










A.
Observe initial stack tests










(PM, dioxins/furans, opacity, HCl, Cd, Pb, Hg, CO, NOx, and SO2) 0 c,d 48 0 0 0 $0

B.
Excess emissions -- Enforcement Activities
11 f 24 264 13 26 $15,747

C.
Create Information
not applicable

D.
Gather Information
not applicable

E.
Report Reviews









1) Review waste managemant plan and siting analysis 0 c 8 0 0 0 $0


2) Review report submitted prior to initial startup 0 c 2 0 0 0 $0


3) Review initial stack test report 0 c 40 0 0 0 $0


4) Review annual compliance report 110 e 8 880 44 88 $52,490


5) Review semi-annual excess emission and parameter exceedance report 9 f 16 144 7 14 $8,589


6) Review status reports and corrective action summary for operators off-site 18 g 4 72 4 7 $4,295

F.
Prepare annual summary report
1 200 200 10 20 $11,930
5. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =





per trip

$0

TOTAL





1560 78 156 $93,051












FOOTNOTES






















a Costs are based on the following hourly rates (loaded with 60% for fringe and overhead): technical at $52.37, management at $86.56, clerical at $29.52.












b Figures may not add exactly due to rounding.





















c One-time only costs.





















d Assumes EPA personnel attend 20 percent of the initial stack tests.





















e Burden not incurred until second year of operation onward.





















f Assume that 10 percent of the facilities have an exceedance during the year.












g Assumed that 10 percent of the facilities would not have a qualified operator for more than two weeks at least once a year. Assumed that 1 status report and 2 corrective action summaries are submitted.

Sheet 25: EPACOST Summary

Table 10 - Summary of Annual Federal Government Burden and Cost of Recordkeeping and Reporting Requirements for the Emission Guidelines for Existing Stationary Sources: Commercial and Industrial Solid Waste Incineration Units - Subpart DDDD
Year Technical Hours Management Hours Clerical Hours Total Hours Labor Costs Non-Labor (O&M) Costs Total Costs
1 6,822 341 682 7,845 $426,306 $0 $426,306
2 1,560 78 156 1,794 $93,051 $0 $93,051
3 1,560 78 156 1,794 $93,051 $0 $93,051
Total 9,942 497 994 11,433 $612,408 $0 $612,408
Average 3,314 166 331 3,811 $204,136 $0 $204,136
File Typeapplication/vnd.ms-excel
AuthorEeastern Reseach Group, Inc.
Last Modified ByEastern Research Group
File Modified2010-04-13
File Created1998-09-17

© 2024 OMB.report | Privacy Policy