Information Collection Request

30 CFR 822 - Special permanent program performance standards - operations in alluvial valley floors

ICR 201007-1029-001 · OMB 1029-0049 · Historical Active

Forms and Documents
DocumentTypeStatusAvailability
822.30.2010.pdf Supplementary Document Uploaded 2010-09-23 Available
822.MM.SS.2010.doc.doc Supporting Statement A Uploaded 2010-09-17 Available
764-822 60 2010.pdf Supplementary Document Uploaded 2010-07-20 Available
Section 515(b)(10).doc Supplementary Document Uploaded 2007-06-27 Repair queued
Section 510.doc Supplementary Document Uploaded 2007-06-27 Available
Part 822.doc Supplementary Document Uploaded 2007-06-27 Available
IC Document Collections
IC IDCollectionTypeStatusForm
179688 822.13 - Monitoring - SRA Modified
11307 822.13 - Monitoring - Industry Modified
ICR Details
1029-0049 201007-1029-001
Historical Active 200704-1029-002
DOI/OSMRE Part 822 - extension
30 CFR 822 - Special permanent program performance standards - operations in alluvial valley floors
Extension without change of a currently approved collection   No
Regular
Approved without change 11/16/2010
Retrieve Notice of Action (NOA) 09/23/2010
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
11/30/2013 36 Months From Approved 11/30/2010
50 0 42
2,750 0 2,310
0 0 0

Sections 510(b)(5) and 515(b)(10)(f) of the Surface Coal Mining and Reclamation Act of 1977 (the Act) protect alluvial valley floors from the adverse effects of surface coal mining operations west of the 100th meridian. Part 822 requires the permittee to install, maintain, and operate a hydrologic monitoring system in order to provide specific protection for alluvial valley floors.

PL: Pub.L. 95 - 87 510 and 515 Name of Law: Surface Mining Control and Reclamation Act of 1977
  
None

Not associated with rulemaking

  75 FR 37458 06/29/2010
75 FR 57976 09/23/2010
No

2
IC Title Form No. Form Name
822.13 - Monitoring - SRA
822.13 - Monitoring - Industry

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 50 42 0 0 8 0
Annual Time Burden (Hours) 2,750 2,310 0 0 440 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No
There are currently 2,310 hours approved by OMB. Due to an increase in the number of respondents, from 21 to 25, we are increasing the annual burden by a total of 440 hours as an adjustment.

$449
No
No
No
No
No
Uncollected
Adrienne Alsop 202 208-2818 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
09/23/2010